Aip 2018
Aip 2018
Aip 2018
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
GENERAL SERVICES
Developed plans,
1000-000-1-1-
guidelines, formulated,
01-001-000- I. Executive Governance Program PGO Jan. 1, 2018 Dec. 31, 2018 GF -
000 implemented and
enforced
Grants on financial
1000-000-1-1- assistance, burial,
Provision of grants and financial
01-001-000- 2 PGO Jan. 1, 2018 Dec. 31, 2018 educational assistance GF 25,000,000.00 25,000,000.00
002 assistance
provided for indigents of
Quirino Province
1000-000-1-1-
Capacity Building
01-001-000- 3 Capacity Building PGO Jan. 1, 2018 Dec. 31, 2018 GF 200,000.00 200,000.00
003 conducted
Purchased furniture/
1000-000-1-1- Provision for Capital Outlay for
fixtures/equipments/Gen
01-000-001- 2 Equipment, Furniture, PGO Jan. 1, 2018 Dec. 31, 2018 GF 2,500,000.00 2,500,000.00
002 Set/computers, CCTV
Fixture/Gen Set/CCTV
etc.
SUB - TOTAL 24,378,185.00 93,348,749.00 8,500,000.00 126,226,934.00 - - -
page1
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
PGO -
1000-004-1-1- Establish internal auditing
Internal developed guidelines
01-001-000- A. 1 standards, guidelines and Jan. 1, 2018 Dec. 31, 2018 GF -
001 Control and procedures
procedures
Servie/Unit
Baseline assessment of
the Internal Control -
System conducted
PGO -
1000-004-1-1-
Internal Control significance and
01-001-000- 2 Audit Planning Jan. 1, 2018 Dec. 31, 2018 materiality and control GF
002 Control
Servie/Unit risk of key processes
considered
Facilitated a. Audit
PGO -
1000-004-1-1- Facilitation in the Settlement of Observation
Internal
01-001-000- 5 Accounts issued by the Jan. 1, 2018 Dec. 31, 2018 memorandum; b.Notice GF
005 Control
Commission on Audit (COA) of Suspension/
Servie/Unit
Disallowance/ Charge
monthly meeting
PGO -
1000-004-1-1- conducted, attendance
Internal
01-001-000- 6 Capability Building Jan. 1, 2018 Dec. 31, 2018 to DILG/ DBM/ COA GF
006 Control
trainings, seminars,
Servie/Unit
updates
page2
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
PGO - purchased
1000-004-1-1-
Internal furniture/fixtures/
01-000-001- B. 1 Provision for Capital Outlay Jan. 1, 2018 Dec. 31, 2018 GF 296,000.00 296,000.00
001 Control equipment/computer/
Servie/Unit printer
SUB - TOTAL 1,621,722.00 299,726.00 296,000.00 2,217,448.00
1000-007-1-1-
General Administration, Support and Provided personnel
01-001-000- I. PGO-PWO Jan. 1, 2018 Dec. 2018 GF 5,753,495.00 5,753,495.00
000 Services Program complement for PWO
1000-007-1-1-
01-001-000- A. 1 Provision for MOOE PGO-PWO Jan. 1, 2018 Dec. 2018 MOOE provided GF 114,500.00 114,500.00
001
1000-007-1-1-
Rehabilitated Prisoners
01-001-000- 2 Rehabilitation of Prisoners PGO-PWO Jan. 1, 2018 Dec. 2018 GF -
002 to be productive citizen
1000-007-1-1-
Transfer of prisoners to New as the need as the need
01-001-000- 3 PGO-PWO as per court order GF 30,000.00 30,000.00
003 Bilibid Prison arises arises
1000-007-1-1-
Procurement of Prisoners for daily consumption of
01-001-000- 4 PGO-PWO Jan. 1, 2018 Dec. 2018 GF 691,920.00 691,920.00
004 Subsistence inmates
1000-007-1-1-
Procurement of Janitorial & maintenance of
01-001-000- 6 PGO-PWO Jan. 1, 2018 Dec. 2018 GF 80,000.00 80,000.00
006 Electrical Supplies cleanliness
1000-007-1-1-
Procurement of Tire, Fuel, Oil maintenance of service
01-001-000- 7 PGO-PWO Jan. 1, 2018 Dec. 2018 GF 185,000.00 185,000.00
007 and lubricants vehicle of Provincial Jail
1000-007-1-1-
01-000-001- B. 1 Provision for Capital Outlay PGO-PWO Jan. 1, 2018 Dec. 2018 2 units laptop procured 70,000.00 70,000.00
001
SUB - TOTAL 5,753,495.00 1,131,420.00 70,000.00 6,954,915.00
1000-008-1-1-
PGO- All PPA's implemented/
01-001-000- A. 1. Provision for MOOE Jan. 1, 2018 Dec. 2018 GF 934,625.00 934,625.00
001 PDRRMO MOOE Provided
page3
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
1000-000-1-1-
Conduct committee hearings, Conducted meetings
03-001-000- 2. OSP Jan. 1, 2018 Dec. 2018 GF -
002 meetings and dialogues and dialogues
1000-000-1-1-
Procurement of fuel for service Purchased fuel/repair of
03-001-000- 4. OSP Jan. 1, 2018 Dec. 2018 GF 2,587,500.00 2,587,500.00
004 vehicles of VG/SP service vehicles
1000-000-1-1-
Administrative Services Rendered Administrative
12-001-000- 2. OPAd Jan. 1, 2018 Dec. 31, 2018 GF
002 (Records Management) Functions
1000-000-1-1-
12-001-000- 3. Processing of claims OPAd Jan. 1, 2018 Dec. 31, 2018 Processed claims GF
003
1000-000-1-1-
Actions for Administrative Acted on Administrative
12-001-000- 4. OPAd Jan. 1, 2018 Dec. 31, 2018 GF
004 Problems and Issues problems and Issues
page4
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
1000-000-1-1-
12-001-000- 5. Rendition of IT Services OPAd Jan. 1, 2018 Dec. 31, 2018 Rendered IT Services GF
005
1000-000-1-1-
12-001-000- 6. Provision for MOOE OPAd Jan. 1, 2018 Dec. 31, 2018 All PPA's implemented GF 1,205,000.00 1,205,000.00
006
1000-000-1-1-
Purchased 2 units
12-000-001- B. 1. Provision for Capital Outlay OPAd Jan. 1, 2018 Dec. 31, 2018 GF 60,000.00 60,000.00
001 computer
1000-000-1-3-
Rendered Administrative
01-001-000- A. 1. Administrative Services PHRMO Jan. 1, 2018 Dec. 31, 2018 GF -
001 Functions
1000-000-1-3-
Regular appointments
01-001-000- 2. Employment Services PHRMO Jan. 1, 2018 Dec. 2018 GF
002 attested by CSC
1000-000-1-3-
Personnel Benefits and Other
01-001-000- 3. PHRMO Jan. 1, 2018 Dec. 31, 2018 GF
003 Related Services
Support Functions
1000-000-1-3-
Six (6) HR procedures
01-001-000- 4. a. QMS - ISO 9001:2008 PHRMO Jan. 1, 2018 Dec. 31, 2018 GF
004 sustained/ maintained
Six (6) HR procedures
Sustainability/ maintenance
1000-000-1-3-
Provision for the purchase of Purchased equipments/
01-000-001- B. 1 PHRMO Jan. 1, 2018 Dec. 31, 2018 GF 400,000.00 400,000.00
001 equipment/ furniture/fixtures furniture/fixture
1000-000-1-1- Formulation/Preparation of
3 plans/programs
10-002-000- A. 1 sectoral development plans and PPDO Jan. 1, 2018 Dec. 31, 2018 GF -
001 formulated/prepared
programs (AIP, PDIP, AOP, etc.)
page5
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
project proposals
1000-000-1-1- Preparation of Feasibility Studies,
packaged, feasibility
10-003-000- III. Project Proposals, Researches and PPDO Jan. 1, 2018 Dec. 31, 2018 GF 1,085,464.00 1,085,464.00
000 studies prepared and
Other Development Plans
researches conducted
Updating of Provincial
1000-000-1-1- Commodity Investment Plan
10-003-000- A. 1 (PCIP) to include Dairy, PPDO Jan. 1, 2018 Dec. 31, 2018 1 PCIP updated GF -
001 Pigmented/Aromatic Rice and
Corn
1000-000-1-1-
Preparation of feasibility studies
10-003-000- 3 PPDO Jan. 1, 2018 Dec. 31, 2018 2 FS prepared GF -
003 for Farm to Market Roads
1000-000-1-1-
Local level plan implementation 1 nutrition plan
10-004-000- A. 1 PPDO Jan. 1, 2018 Dec. 31, 2018 GF -
001 on nutrition implemented
page6
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
1000-000-1-1-
Preparation of LGU Performance LGU performance report
10-005-000- V. PPDO Jan. 1, 2018 Dec. 31, 2018 GF 416,416.00 416,416.00
000 Reports prepared
1000-000-1-1-
Seal of Good Local Governance SGLG performance
10-005-000- A. 1 PPDO Jan. 1, 2018 Dec. 31, 2018 GF -
001 Report report prepared
1000-000-1-1-
Technical Assistance and Regional
10-006-000- VI PPDO Jan. 1, 2018 Dec. 31, 2018 GF 568,968.00 30,000.00 598,968.00
000 Development Council (RDC) Activities
1000-000-1-1-
6 AIP technical reviews
10-006-000- A. 1 MLGU Budget/AIP Review PPDO Jan. 1, 2018 Dec. 31, 2018 GF -
001 rendered
page7
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
1000-000-1-1-
67 technical support
10-006-000- 4 I Love Quirino Caravan PPDO Jan. 1, 2018 Dec. 31, 2018 GF -
004 provided
bidding documents
1000-000-1-1-
Bids and Awards Committee (BAC) prepared and
10-007-000- VII PPDO Jan. 1, 2018 Dec. 31, 2018 GF 276,138.00 150,000.00 426,138.00
000 Procurement Activities shopping/public bidding
conducted
1000-000-1-1-
Procurement of supplies thru 1000 procurement thru
10-007-000- 2 PPDO Jan. 1, 2018 Dec. 31, 2018 GF -
002 shopping shopping performed
1000-000-1-1-
furniture/fixtures
10-000-001- B. 1. Provision for Capital Outlay PPDO Jan. 1, 2018 Dec. 31, 2018 GF 100,000.00 100,000.00
001 purchased
1000-000-1-1-
General Administrative Support All office PPAs fully
15-001-000- I. PGSO Jan. 1, 2018 Dec. 31, 2018 GF 12,275,308.00 2,029,000.00 14,304,308.00
000 Services implemented
Administrative services
1000-000-1-1-
Improvement of administrative improved and
15-001-000- A. 1 PGSO Jan. 1, 2018 Dec. 31, 2018 GF 62,400.00 62,400.00
001 services administrative files
backed up for safety
page8
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
Grounds beautifully
c. Landscaping works PGSO Jan. 1, 2018 Dec. 31, 2018 landscaped and GF 55,000.00 55,000.00
maintained
Improvement of maintenance
PGSO Jan. 1, 2018 Dec. 31, 2018 improved services GF -
services
1000-000-1-1-
15-001-000- 5
005 Smooth operation of
a. Electrical System PGSO Jan. 1, 2018 Dec. 31, 2018 offices with the aid of GF 66,000.00 66,000.00
electricity
1000-000-1-1-
meetings/seminars
09-001-000- A. 1 Capability Building PBO Jan. 1, 2018 Dec. 31, 2018 GF 175,000.00 175,000.00
001 attended
Annual Budgets
1000-1-01-
Budget Preparation/Review and prepared and submitted,
009-001-000- 3 PBO Jan. 1, 2018 Dec. 31, 2018 GF 250,000.00 250,000.00
003 Consolidation procured supplies and
overtime services paid
page9
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
1000-1-01- Budget Review of Municipal Technical Assistance
009-001-000- 4 Annual and Supplemental PBO Jan. 1, 2018 Dec. 31, 2018 rendered to reviewing GF -
004 Budgets authority
1000-1-01-
Budget Execution/ Budget executed/
009-001-000- 5 PBO Jan. 1, 2018 Dec. 31, 2018 GF -
005 Implementation implemented/
1000-000-1-1- OPAC-monitoring of
Financial Accounting and Reporting
07-001-000- I. OPAC Jan. 1, 2018 Dec. 31, 2018 work accomplishment/ GF 10,553,784.00 938,450.00 11,492,234.00
000 Program
MOOE Provided
1000-000-1-1-
Encoded Journal Entries in the
07-001-000- 2 OPAC Jan. 1, 2018 Dec. 31, 2018 Journal entries encoded GF
002 E-NGAS System
1000-000-1-1-
Generate and submit Financial
07-001-000- 4 OPAC Jan. 1, 2018 Dec. 31, 2018 Reports generated GF
004 Reports
1000-000-1-1-
ledgers and schedules
07-001-000- 5 Print Ledgers and Schedules OPAC Jan. 1, 2018 Dec. 31, 2018 GF
005 printed
page10
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
1000-000-1-1-
Prepare certificate of funds Certificate of Funds
07-001-000- 9 OPAC Jan. 1, 2018 Dec. 31, 2018 GF
009 availability Availability prepared
1000-000-1-1-
Prepare fund transfer to other
07-001-000- 13 OPAC Jan. 1, 2018 Dec. 31, 2018 documents prepared GF
013 funds monthly
Prepare Certification of
1000-000-1-1-
Employees Net Take Home Pay
07-001-000- 15 OPAC Jan. 1, 2018 Dec. 31, 2018 Certification prepared GF
015 and Contributions to
GSIS/PHIC/Pag-ibig
1000-000-1-1-
Encode and prepared Alphalist Alphalist of Payees
07-001-000- 17 OPAC Jan. 1, 2018 Dec. 31, 2018 GF
017 of Payees encoded and prepared
1000-000-1-1-
07-001-000- 20 Update leave Balances OPAC Jan. 1, 2018 Dec. 31, 2018 Leave balances updated GF
020
1000-000-1-1-
Maintain cleanliness and
07-001-000- 21 OPAC Jan. 1, 2018 Dec. 31, 2018 cleanliness maintained GF
021 orderliness in the office
page11
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
Payrolls, DVs,
Assist and transmit paid
1000-000-1-1- Liquidation Reports,
payrolls and DVs, liquidation
07-001-000- 22 OPAC Jan. 1, 2018 Dec. 31, 2018 collections and deposits GF
022 reports, collections and
assorted and
deposits to COA
transmitted
1000-000-1-1-
Prepare and submit Fund Fund utilization
07-001-000- 25 OPAC Jan. 1, 2018 Dec. 31, 2018 GF
025 Utilization Report submitted
1000-000-1-1-
seminars/trainings/
07-001-000- 27 Capability Building OPAC Jan. 1, 2018 Dec. 31, 2018 GF 241,800.00 241,800.00
027 educational field trip
1000-000-1-1-
07-000-001- 2 Purchase of service vehicle OPAC Jan. 1, 2018 Dec. 31, 2018 service vehicle procured GF 1,500,000.00 1,500,000.00
002
1000-000-1-1-
furniture/fixtures
07-000-001- 3 Purchase of furniture and fixture OPAC Jan. 1, 2018 Dec. 31, 2018 GF 25,000.00 25,000.00
003 purchased
page12
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
Intensification of collection of
1000-000-1-1-
revenues from local sources collection of revenues
05-001-000- 7 PTO Jan. 1, 2018 Dec. 31, 2018 GF
007 and prompt remittances and intensified
deposits of collection
Adopted by Department of
Finance (DOF) as the official
reporting system on Local
1000-000-1-1-
Government Fiscal and
05-001-000- 8 PTO Jan. 1, 2018 Dec. 31, 2018 Reports submitted GF
008 Financial Operations prepared
monthly, consolidated and
submitted quarterly thru LGU
Web System to the BLGF
1000-000-1-1-
Prompt and proper funds disbursed
05-001-000- 9 PTO Jan. 1, 2018 Dec. 31, 2018 GF
009 disbursement of funds promptly and properly
1000-000-1-1-
Prompt submission of records Reports submitted and
05-001-000- 10 PTO Jan. 1, 2018 Dec. 31, 2018 GF
010 and records maintence records maintained
1000-000-1-1-
Purchased furniture/
05-000-001- B. 1 Provision for Capital Outlay PTO Jan. 1, 2018 Dec. 31, 2018 GF 372,000.00 372,000.00
001 fixtures/equipments
1000-000-1-1-
Service Vehicle
05-000-001- 2 Purchase of service vehicle PTO Jan. 1, 2018 Dec. 31, 2018 GF 300,000.00 300,000.00
002 Purchased
Technical assistance to
Taxmapping Operations and
A. 1 OPAss Jan. 1, 2018 Dec. 31, 2018 municipal assessors GF 1,079,685.64 215,000.00 1,294,685.64
Occular Inspections
rendered
1000-000-1-1-
06-001-000-
001
page13
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
1000-000-1-1-
06-001-000- - Data gathering OPAss Jan. 1, 2018 Dec. 31, 2018 data gathered GF
001
prepared
- Appraisal and
OPAss Jan. 1, 2018 Dec. 31, 2018 appraised/inspaection GF
Assessments of Real Properties
report
- Monitoring of
acoomplishment reports
accomplishment reports of the Jan. 1, 2018 Dec. 31, 2018 GF -
monitored
Municipal Assessors
-Tax information OPAss Jan. 1, 2018 Dec. 31, 2018 Informed taxpayers GF -
3 Records Management OPAss Jan. 1, 2018 Dec. 31, 2018 GF -
page14
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
1000-000-1-1-
Purchased computers,
11-000-001- B. 1 Provision for Capital Outlay PLO Jan. 1, 2018 Dec. 31, 2018 GF 250,000.00 250,000.00
001 blinds, TV, Divan
1000-000-1-3- PGO-Special
03-001-000- I A 1 Elecricity Purpose Jan. 1, 2018 Dec. 31, 2018 Electric bills paid GF 8,000,000.00 8,000,000.00
001 Approp.
Finacial assistance/
1000-000-1-3- PGO-Special
Subsidies and Donations donations, burial,
03-002-000- II A 1 Purpose Jan. 1, 2018 Dec. 31, 2018 GF 6,000,000.00 6,000,000.00
001 (Provincewide) education, medication,
Approp.
hospitalization, etc.
1000-000-1-3- PGO-Special
Maintenance of Various Various buildings
03-004-000- IV. A 1 Purpose Jan. 1, 2018 Dec. 31, 2018 GF 700,000.00 700,000.00
001 Buildings (Pest Control) maintained
Approp.
1000-000-1-3- PGO-Special
03-006-000- VI
I Love Quirino Bus (Fuel, Fuel and Spareparts
A 1 Purpose Jan. 1, 2018 Dec. 31, 2018 GF 1,000,000.00 1,500,000.00 2,500,000.00
001 Spareparts and repainting) procured/repainting
Approp.
1000-000-1-3-
03-008-000- VIII I Love Quirino Projects/ Programs
000
Projects/Programs/Activi
ties for Senior Citizens,
RIC, Barangays,
projects/programs/
activities Community
Assistance Program
fully implemented
Construction of Water
System, Rehabilitation
of Brgy. Centers, Sheds
etc.
page15
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
Projects/Programs/Activi (MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) ties for Senior
(6) Citizens, (7) (8) (8) (9) (10)
RIC, Barangays,
projects/programs/
activities Community
Assistance Program
1000-000-1-3- Muti-Development Projects PGO-Special fully implemented
Construction of Water A412-03/
03-008-000- A 1 (Provincewide) Purpose Jan. 1, 2018 Dec. 31, 2018 GF 33,702,000.00 33,702,000.00 33,702,000.00
001 System, Rehabilitation A214-02
Approp.
of Brgy. Centers, Sheds
etc.
Activities
Provision for MOOE for
ISO
1000-000-1-3- PGO- Special
03-009-000- IX A.
Quality Management System - GF 1,500,000.00 1,500,000.00
1 Purpose Jan. 1, 2018 Dec. 31, 2018 certification approval/
001 ISO
Approp. Sustainability of ISO
Certification
-
1000-000-1-3- PGO-Special
Provision for ENGAS,E-
03-010-000- X. A 1 Inter-Connectivity Purpose Jan. 1, 2018 Dec. 31, 2018 GF 700,000.00 700,000.00
001 Budget, LAN, BIZBOX
Approp.
1000-000-1-3- PGO-Special
03-014-000- XIV A 1 Loan Amortization Purpose Jan. 1, 2018 Dec. 31, 2018 Loans paid GF 7,000,000.00 - 7,000,000.00
001 Approp.
page16
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
1000-000-1-3-
Various Infra Projects/Programs/
03-000-001- I -
000 Activities
Prepared feasibility
1000-000-1-3-
studies, consultants
03-000-001- B. 1 1. Pre-Construction Activities PGO Jan. 1, 2018 Dec. 31, 2018 GF 5,000,000.00 5,000,000.00
001 hired for project
evaluation/design
1000.162 II B. 1 Loan Amortization PGQ Jan. 1, 2018 Dec. 31, 2018 Loans paid 20%DF 30,427,805.48 30,427,805.48
SOCIAL SERVICES
-
3000-005-1-1-
PGO- Prepared project
01-001-000- 2 Promotion of Good Nutrition Jan. 1, 2018 Dec. 31, 2018 GF 119,510.00 119,510.00
002 (Nutrition Information, Nutrition proposal
Communication Education)
3000-005-1-1-
Provision of technical Prepared the schedule
PGO-
01-001-000- 3 assistance to Municipal Jan. 1, 2018 Dec. 31, 2018 for the monitoring of GF -
003 Nutrition Committee (MNC) and Nutrition
MNC and NPC
Municipal Nutrition Program
Coordinator (MNPC)
Prepared BNS Project
Jan. 1, 2018 Dec. 31, 2018 - -
Proposal
3000-005-1-1-
Assistance for Barangay PGO-
01-001-000- 4 GF
004 Nutrition Scholar (BNS) Nutrition Prepared BNS Payroll
Jan. 1, 2018 Dec. 31, 2018 for their provincial -
honorarium
3000-005-1-1-
PGO- Prepared training/
01-001-000- 5 Capability Building/ Training Jan. 1, 2018 Dec. 31, 2018 GF 146,735.00 146,735.00
005 Nutrition activity proposal
page17
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
3000-005-1-1-
PGO- Evaluation conducted
01-001-000- 6 Evaluation of MNCs, BNCs, Jan. 1, 2018 Dec. 31, 2018 GF 1,000.00 1,000.00
006 NPCs, BNSs, and schools Nutrition with results
3000-005-1-1-
PGO- Data bank completed
01-001-000- 7 Data Gathering/Banking Jan. 1, 2018 Dec. 31, 2018 GF -
007 Nutrition before June 2018
3000-005-1-1-
PGO-
01-000-001- B. 1 Provision for Capital Outlay Jan. 1, 2018 Dec. 31, 2018 CO procured GF - 75,000.00 75,000.00
001 Nutrition
3000-006-1-1-
PGO- All PPAs implemented/
01-001-000- A. 1 Provision for MOOE Population
Jan. 1, 2018 Dec. 31, 2018 GF 268,000.00 268,000.00
001 MOOE
Reduced Number of
teenage pregnancies,
3000-006-1-1-
Adolescent Health and PGO- early sexual activity,
01-001-000- 3 Jan. 1, 2018 Dec. 31, 2018 GF -
003 Development Program Population early marriages and
domestic violence
against adolescents
3000-006-1-1-
Population and Development PGO- Developed and
01-001-000- 4 Jan. 1, 2018 Dec. 31, 2018 GF 128,000.00 128,000.00
004 Program Population executed various plans
Heightened
3000-006-1-1- appreciation/
Gender and Development PGO-
01-001-000- 5 Jan. 1, 2018 Dec. 31, 2018 understanding of GF 210,000.00 210,000.00
005 Program Population
various concepts, goals
and principles of GAD
3000-006-1-1-
Attendance to Municipal PGO- Provided technical
01-001-000- 6 Jan. 1, 2018 Dec. 31, 2018 GF 15,000.00 15,000.00
006 Activities/ Meetings Population assistance
3000-006-1-1-
Attendance to Provincial Inter PGO-
01-001-000- 7 Jan. 1, 2018 Dec. 31, 2018 Attended meetings GF 5,000.00 5,000.00
007 Agency Activities/Meetings Population
3000-006-1-1-
Attendance to regional PGO-
01-001-000- 8 Jan. 1, 2018 Dec. 31, 2018 Attended meetings GF 78,000.00 78,000.00
008 Activities/ Meetings Population
page18
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
3000-006-1-1-
PGO-
01-000-001- Provision for Capital Outlay Population
Jan. 1, 2018 Dec. 31, 2018 CO procured GF 285,000.00 285,000.00
001
SUB - TOTAL 1,086,118.00 799,000.00 285,000.00 2,170,118.00
3000-000-1-1-
All PPAs - MOOE below
13-001-000- I. Health Services Program PHO Jan. 1, 2018 Dec. 31, 2018 GF 7,723,460.00 7,723,460.00
000 implemented
3000-000-1-1-
13-001-000- A. 1 Dental Health program PHO Jan. 1, 2018 Dec. 31, 2018 100% attended GF 29,135.00 29,135.00
001
3000-000-1-1-
Health community
13-001-000- 3 Environmental PHO Jan. 1, 2018 Dec. 31, 2018 GF 459,660.00 459,660.00
003 environment
3000-000-1-1-
13-001-000- 4 STD Program PHO Jan. 1, 2018 Dec. 31, 2018 HIV/STD cases reduced GF 77,800.00 77,800.00
004
surveillance and
3000-000-1-1-
treatment on the use of
13-001-000- 5 Drugs Program PHO Jan. 1, 2018 Dec. 31, 2018 GF 149,000.00 149,000.00
005 drugs substance
conducted
3000-000-1-1-
National Blood Services Voluntary blood
13-001-000- 6 PHO Jan. 1, 2018 Dec. 31, 2018 GF 24,000.00 24,000.00
006 Program donation
3000-000-1-1-
13-001-000- 7 Malaria Program PHO Jan. 1, 2018 Dec. 31, 2018 frequent surveillance GF -
007
3000-000-1-1-
CDD: Food Borne and Water
13-001-000- 11 PHO Jan. 1, 2018 Dec. 31, 2018 GF - -
011 Diseases
3000-000-1-1- policies/guidelines/
National Disability Prevention
13-001-000- 12 PHO Jan. 1, 2018 Dec. 31, 2018 ordinances on PWD GF 52,800.00 52,800.00
012 and Rehabilitation Program
laws adopted
page19
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
3000-000-1-1-
Quality TB services
13-001-000- 15 TB Program PHO Jan. 1, 2018 Dec. 31, 2018 GF - -
015 provided
3000-000-1-1-
trainings conducted/ FP
13-001-000- 19 Family Planning Program PHO Jan. 1, 2018 Dec. 31, 2018 GF - -
019 supplies procured
Pregnancy package
3000-000-1-1-
Maternal and Child Care during Buntis Program
13-001-000- 20 PHO Jan. 1, 2018 Dec. 31, 2018 GF - -
020 Program given , supplies, vitamin
supplements provided
Capacity Building of
3000-000-1-1-
HWs for a package of
13-001-000- 21 Older person PHO Jan. 1, 2018 Dec. 31, 2018 GF -
021 health services given to
older person
3000-000-1-1-
HWs capacitated on
13-001-000- 24 Mental health Program PHO Jan. 1, 2018 Dec. 31, 2018 GF 360,000.00 360,000.00
024 mental health prog.
3000-000-1-1-
Morbidity and mortality
13-001-000- 26 National Dengue Program PHO Jan. 1, 2018 Dec. 31, 2018 GF 303,750.00 303,750.00
026 reduced
3000-000-1-1-
Health Education and health
13-001-000- 27 PHO Jan. 1, 2018 Dec. 31, 2018 IEC conducted GF - -
027 Promotion
3000-000-1-1-
furniture/fixtures/
13-000-001- B. 1 Provision for Capital Outlay PHO Jan. 1, 2018 Dec. 31, 2018 GF 250,000.00 250,000.00
001 equipment procured
SUB - TOTAL 7,723,460.00 3,628,000.00 250,000.00 11,601,460.00
page20
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
3000-001-1-1-
13-001-000- I. Health Services Program QPMC Jan. 1, 2018 Dec. 2018 all PPAs implemented GF 74,230,116.00 94,539,000.00 168,769,116.00
000
Patients assisted,
3000-001-1-1- clinical chart, special
13-001-000- 2 Nursing Service QPMC Jan. 1, 2018 Dec. 2018 procedures performed GF -
002 doctor's order carried
out
3000-001-1-1-
13-001-000- 6 Ancillary Services QPMC Jan. 1, 2018 Dec. 2018 Laboratory test conducted GF -
006
3000-001-1-1-
13-001-000- 7 Special Care Units QPMC Jan. 1, 2018 Dec. 2018 Patients treated GF -
007
3000-001-1-1-
13-002-000- II Administrative Management QPMC Jan. 1, 2018 Dec. 2018 GF -
000
3000-001-1-1- Administrative Policies, Issuances,
13-002-000- A. 1 Memoranda QPMC Jan. 1, 2018 Dec. 2018 policies signed and issued GF -
001
3000-001-1-1- employees completed
13-002-000- 2 Capability Building QPMC Jan. 1, 2018 Dec. 2018 training GF -
002
page21
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
Employee/visitor's
3000-001-1-1-
logbook, inspection
13-002-000- 7 Security Services QPMC Jan. 1, 2018 Dec. 2018 conducted, incident GF -
007
reported
3000-001-1-1-
Intake sheet, counseling
13-002-000- 8 Medical Social Services QPMC Jan. 1, 2018 Dec. 2018 referral prepared GF -
008
Hospital equipment,
3000-001-1-1- furniture, fixtures, aircon,
13-002-000- 12 Maintenance Services QPMC Jan. 1, 2018 Dec. 2018 electric repaired and GF -
012
maintained
3000-001-1-1-
13-003-000- III. Other Related Activities QPMC Jan. 1, 2018 Dec. 2018 GF -
000
3000-001-1-1-
13-003-000- 3 Surgical Mission QPMC Jan. 1, 2018 Dec. 2018 Operation conducted GF -
003
3000-001-1-1-
13-003-000- 4 Pap Smear Testing QPMC Jan. 1, 2018 Dec. 2018 Specimen collected/tested GF -
004
page22
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
3000-001-1-1-
Office building
13-000-001- 2 Construction of office Building QPMC Jan. 1, 2018 Dec. 2018 GF 200,000.00 200,000.00
002 constructed
3000-002-1-1-
Provision for Capital Outlay for
13-000-001- B. 1 ADH Jan. 1, 2018 Dec. 2018 land improvements 500,000.00 500,000.00
001 land and Land Improvement
3000-002-1-1-
furniture/ fixtures,
13-000-001- 2 Provision for Capital Outlay ADH Jan. 1, 2018 Dec. 2018 GF 250,000.00 250,000.00
002 equipment
3000-003-1-1-
drugs and medical
13-001-000- 2 Procurement DDH Jan. 1, 2018 Dec. 2018 GF -
002 supplies procured
Continuous Quality
DDH Jan. 1, 2018 Dec. 2018 GF -
Improvement
1. Housekeeping and Infection
infections prevented -
Control
3000-003-1-1-
13-001-000- 3 2. Continous monitoring on Hand washing and
003 hand washing and waste waste segregation -
segregation practice monitored
page23
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
3000-003-1-1-
13-001-000- 3LOCATION OF PROJECT Expenses Climate Change Climate Change Typology
Code Department DATE DATE Services (PS) (CO)
003 (MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
Purchased IT/Med/Lab
3000-003-1-1-
Equipment/ Furniture/
13-000-001- B. 1 Provision for Capital Outlay DDH Jan. 1, 2018 Dec. 2018 GF 650,000.00 650,000.00
001 Fixtures/Dental
equipment
SUB - TOTAL 18,563,486.00 8,297,038.00 650,000.00 27,510,524.00
3000-004-1-1-
Health care & services
13-001-000- I. Health Services Program MDH Jan. 1, 2018 Dec. 2018 GF 23,172,046.00 12,159,100.00 35,331,146.00
000 rendered
3000-004-1-1-
Administrative and Patient Administrative functions
13-001-000- A. 1 MDH Jan. 1, 2018 Dec. 2018 GF -
001 Support Services rendered
3000-004-1-1-
Equal medical treatment
13-001-000- 2 Clinical and Medical Services MDH Jan. 1, 2018 Dec. 2018 GF -
002 to patient served
3000-004-1-1-
Quality care to every
13-001-000- 3 Clinical Care Services MDH Jan. 1, 2018 Dec. 2018 GF -
003 patient provided
3000-004-1-1-
Furniture/Fixtures/
13-000-001- B. 1 Provision for Capital Outlay MDH Jan. 1, 2018 Dec. 2018 GF 500,000.00 500,000.00
001 Equipment Purchased
Conducted home
3000-000-1-1-
visits/Assessed cases
14-001-000- 3 Family and Community Welfare PSWDO Jan. 1, 2018 Dec. 2018 GF 45,000.00 45,000.00
003 needing follow thru
services
3000-000-1-1-
Extended basic services
14-001-000- 4 Women PSWDO Jan. 1, 2018 Dec. 2018 GF 50,000.00 50,000.00
004 to clients
3000-000-1-1-
extended basic need
14-001-000- 5 Former Rebels PSWDO Jan. 1, 2018 Dec. 2018 GF 100,000.00 100,000.00
005 services
page24
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
3000-000-1-1-
Extended AICS to
14-001-000- 6 Emergency Assistance PSWDO Jan. 1, 2018 Dec. 2018 GF 460,000.00 460,000.00
006 qualified clients
provided assistive
PSWDO Jan. 1, 2018 Dec. 2018 GF 85,000.00 85,000.00
device/
PSWDO Jan. 1, 2018 Dec. 2018 conducted IEC/forum GF -
3000-000-1-1-
14-001-000- 7 Person with Disability acquired skills ready for
007 PSWDO Jan. 1, 2018 Dec. 2018 income generating GF -
projects
extended basic services
PSWDO Jan. 1, 2018 Dec. 2018 GF -
to clients
3000-000-1-1- Conducted
14-001-000- 8 Senior Citizens PSWDO Jan. 1, 2018 Dec. 2018 evaluation/planning GF 90,000.00 90,000.00
008 workshop/meetings
3000-000-1-1-
14-000-001- B. 1 Provision for Capital Outlay PSWDO Jan. 1, 2018 Dec. 2018 CO provided GF 125,000.00 125,000.00
001
3000-000-1-1-
Procurement of Motor Vehicle/ transportation
14-000-001- 2 PSWDO Jan. 1, 2018 Dec. 2018 GF 1,500,000.00 1,500,000.00
002 Transportation Equipment equipment procured
3000-000-1-3-
Level of addiction
04-002-000- A. 1 Assessment on the level of Use Jan. 1, 2018 Dec. 2018 GF
001 determined
3000-000-1-3-
Relevant data and
04-002-000- 2 Profiling and Data gathering Jan. 1, 2018 Dec. 2018 GF
002 information gathered
3000-000-1-3-
individual's present
04-002-000- 4 Individual Counseling Jan. 1, 2018 Dec. 2018 GF
004 condition reported
3000-000-1-3-
family counseling
04-002-000- 5 Family Counseling Jan. 1, 2018 Dec. 2018 GF
005 conducted
page25
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
3000-000-1-3-
04-002-000- 7 Drug Dependency Examination Jan. 1, 2018 Dec. 2018 Clients classified GF
007
3000-000-1-3-
04-002-000- 8 Follow up Counseling Jan. 1, 2018 Dec. 2018 client's update reported GF
008
3000-000-1-3-
Moral Recovery and Team clients' feedback
04-002-000- 9 Jan. 1, 2018 Dec. 2018 GF
009 Building gathered and collected
3000-000-1-3-
clients improvement
04-002-000- 12 Pastoral Counseling Jan. 1, 2018 Dec. 2018 GF
012 reported
3000-000-1-3-
04-002-000- 14 Aftercare Jan. 1, 2018 Dec. 2018 clients updates reported GF
014
3000-000-1-3-
clients psychological
04-002-000- 15 Psychosocial Intervention Jan. 1, 2018 Dec. 2018 GF
015 needs assessed
3000-000-1-3-
IEC Drug Abuse Prevention and
04-002-000- 16 Jan. 1, 2018 Dec. 2018 IEC conducted GF
016 Control
3000-000-1-3-
Other Activities, Services and Activities necessary for
04-002-000- 17 Jan. 1, 2018 Dec. 2018 GF
017 Expenses the clients case reported
page26
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
3000-000-1-3- PGO-Special
Early Child Care Development All programs/activities
04-004-000- IV Purpose Jan. 1, 2018 Dec. 2018 GF 200,000.00 200,000.00
000 Programs/Activities (ECCD) implemented
Approp.
Institutional Development
Jan. 1, 2018 Dec. 2018 GF
3000-000-1-3- Activities
04-004-000- A 1 # of stakeholders on
001 Conduct of Capability Building
Jan. 1, 2018 Dec. 2018 children & LCPC GF
Activities
members attended
3000-000-1-3- Conduct of Training on ECCD in
service providers
04-004-000- 2 Emergency Situation/ New Day Jan. 1, 2018 Dec. 2018 GF
002 attended
Care Manual
3000-000-1-3-
Establishment of Data data base profile for
04-004-000- 4 Jan. 1, 2018 Dec. 2018 GF
004 base/Profile for Children children established
Development of Advocacy
3000-000-1-3- Materials on Children and
training and
04-004-000- 6 Advocacy Activities on the Jan. 1, 2018 Dec. 2018 GF
006 development activities
Promotion of Rights and
Welfare of Children
3000-000-1-3-
Accreditation for Service
04-004-000- 7 Jan. 1, 2018 Dec. 2018 Day Care Workers GF -
007 Providers
3000-000-1-3-
Observance of Children's Month Children's Month
04-004-000- 8 Jan. 1, 2018 Dec. 2018 GF -
008 Celebration celebrated
3000-000-1-3-
Acquisition of LCD projector LCD projector & Laptop
04-000-001- B. 1 Jan. 1, 2018 Dec. 2018 GF 50,000.00 50,000.00
001 and Laptop procured
Educational assistance
3000-000-1-3- PGO-Special
Scholarship Grants paid to deserving
04-005-000- V. A. 1 Purpose Jan. 1, 2018 Dec. 2018 GF 5,500,000.00 5,500,000.00
001 (Provincewide) students from Quirino
Approp.
province (Tertiary Level)
page27
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
Tourism Development
4 Programs/ Festivals/
3000-000-1-3- Maintenance of PPAS PGO-Special Other MOOE for
04-008-000- Purpose Jan. 1, 2018 Dec. 2018 activities/ events in the GF 8,000,000.00 8,000,000.00
004 - Wakeboarding
Approp. province
- Botanical Garden
- ATV/Motorismo
Health facilities/
Health Facility Development for
Equipments
3000.93 IX B. 1 QPMC at Mangandingay, PGQ Jan. 1, 2018 Dec. 2018
constructed/
20% 8,860,000.00 8,860,000.00
Cabarroguis, Quirino
purchased/repaired
8000-000-1-1-
General Administrative Support
16-001-000- I OPAg Jan. 1, 2018 Dec. 2018 All PPAs Implemented GF 5,290,886.00 750,400.00 6,041,286.00
000 Services
page28
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
8000-000-1-1-
High Value Crops Development
16-004-000- IV. OPAg Jan. 1, 2018 Dec. 2018 GF 1,626,346.00 427,500.00 2,053,846.00
000 Program
Organic coffee
seedlings produced/
8000-000-1-1-
nursery maintained
16-004-000- 4 Coffee Production Project OPAg Jan. 1, 2018 Dec. 2018 GF 100,000.00 100,000.00 100,000.00 A114-12
004
Old growth coffee trees
rejuvenated
Produced/Propagated
8000-000-1-1- assorted fruit tree
Nursery and Orchard
16-004-000- 5 OPAg Jan. 1, 2018 Dec. 2018 seedlings/nursery GF 102,469.00 102,469.00
005 Component
shed/stock room
established
8000-000-1-1-
16-005-000- V. Rice Development Program OPAg Jan. 1, 2018 Dec. 2018 GF -
000
8000-000-1-1- Provided/Distributed
16-005-000- A. 1 Pest and Disease Management OPAg Jan. 1, 2018 Dec. 2018 pesticides to affected GF 60,000.00 60,000.00 60,000.00 A114-13
001 areas
8000-000-1-1-
Pigmented Rice Seed Pigmented rice seeds
16-005-000- 2 OPAg Jan. 1, 2018 Dec. 2018 GF 240,000.00 240,000.00
002 Production produced
8000-000-1-1-
16-006-000- VI. Fisheries Development Program OPAg Jan. 1, 2018 Dec. 2018 GF 2,506,416.00 2,506,416.00
000
page29
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
8000-000-1-1-
Organic Tilapia Production Techno Demo Project
16-006-000- 2 OPAg Jan. 1, 2018 Dec. 2018 GF -
002 Project established
8000-000-1-1-
16-007-000- VII. Institutional Development Program OPAg Jan. 1, 2018 Dec. 2018 GF 2,254,460.00 2,254,460.00
000
Recognized
achievement of
8000-000-1-1- GF -
Institutionalization of Agri-Based farmers/fisherfolks/
16-007-000- A. 1 OPAg Jan. 1, 2018 Dec. 2018 rural/women
001 Organization
Meetings/forums/
GF -
congress conducted
8000-000-1-1- Additional source of
Provision of Livelihood
16-007-000- 2 OPAg Jan. 1, 2018 Dec. 2018 income generating GF -
002 Production Project
project provided
8000-000-1-1-
Construction of concrete fence concrete fence and steel
16-000-001- 3 OPAg Jan. 1, 2018 Dec. 2018 GF 50,000.00 50,000.00
003 and steel gate gate constructed
OPAg-
8000-001-1-1-
Establishment of Banana Tissue Special Banana Tissue Culture
16-001-000- A 1 Jan. 1, 2018 Dec. 2018 GF 800,000.00 800,000.00
001 Culture Model farm Purpose Model Farm established
Approp.
OPAg-
8000-001-1-1- Technical Briefing on Good
Special GAP Banana Tech.
16-001-000- 2 Agricultural Practices for Jan. 1, 2018 Dec. 2018 GF 50,000.00 50,000.00
002 Purpose Briefing conducted
Banana (GAP-Banana)
Approp.
OPAg-
8000-001-1-1- Policy Advocacy and
Policy Advocacy and Capability Special
16-001-000- 3 Jan. 1, 2018 Dec. 2018 Capability Building GF 50,000.00 50,000.00
003 Building Purpose
Conducted
Approp.
OPAg-
8000-001-1-1-
Provision of Alternative Special Alternative Livelihood
16-001-000- 4 Jan. 1, 2018 Dec. 2018 GF 100,000.00 100,000.00
004 Livelihood Projects Purpose Projects Provided
Approp.
page30
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
8000-000-1-1-
17-001-000- I. Veterinary Regulation Program PVet Jan. 1, 2018 Dec. 2018 All PPAs implemented GF 727,443.24 727,443.24
000
8000-000-1-1-
Disease Prevention and Control
17-002-000- II PVet Jan. 1, 2018 Dec. 2018 GF 1,271,332.96 214,981.46 1,486,314.42
000 Program
8000-000-1-1-
17-002-000- A. 1 Hemosept control PVet Jan. 1, 2018 Dec. 2018 animals vaccinated GF -
001
8000-000-1-1-
17-002-000- 2 Anti-Rabies Control PVet Jan. 1, 2018 Dec. 2018 animals vaccinated GF -
002
8000-000-1-1-
hog cholera vaccination
17-002-000- 3 Hog cholera control program PVet Jan. 1, 2018 Dec. 2018 GF -
003 conducted
8000-000-1-1-
Newcastle's Disease control NCD Vaccination
17-002-000- 4 PVet Jan. 1, 2018 Dec. 2018 GF -
004 program conducted
8000-000-1-1-
animal deworming
17-002-000- 5 Fasciola control program PVet Jan. 1, 2018 Dec. 2018 GF -
005 conducted
8000-000-1-1-
17-002-000- 6 Anthrax control program PVet Jan. 1, 2018 Dec. 2018 surveillance conducted GF -
006
8000-000-1-1-
17-002-000- 7 Surra control program PVet Jan. 1, 2018 Dec. 2018 surveillance conducted GF -
007
8000-000-1-1-
disease surveillance
17-002-000- 8 FMD control program PVet Jan. 1, 2018 Dec. 2018 GF -
008 conducted
8000-000-1-1-
Bird flu/avian flu control surveillance report
17-002-000- 9 PVet Jan. 1, 2018 Dec. 2018 GF -
009 program prepared/submitted
8000-000-1-1-
Conduct of IEC to priority
17-002-000- 10 PVet Jan. 1, 2018 Dec. 2018 IEC conducted GF -
010 barangays
8000-000-1-1-
17-002-000- 11 Animal quarantine PVet Jan. 1, 2018 Dec. 2018 animals shipped in GF -
011
8000-000-1-1-
17-003-000- III Genetic Improvement Program PVet Jan. 1, 2018 Dec. 2018 GF 1,818,608.09 366,078.88 2,184,686.97
000
8000-000-1-1-
17-004-000- IV Public Health Management Program PVet Jan. 1, 2018 Dec. 2018 GF 1,091,164.85 219,647.33 1,310,812.18
000
page31
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
8000-000-1-1-
17-005-000- V Regulatory Program PVet Jan. 1, 2018 Dec. 2018 GF 363,721.62 73,215.78 436,937.40
000
8000-000-1-1-
Forage Establishment and Techno Demo
17-006-000- VI PVet Jan. 1, 2018 Dec. 2018 GF 727,443.24 146,431.55 873,874.79
000 Development Program established
8000-000-1-1-
Purchased equipment/
17-000-001- B. 1 Provision for Capital Outlay PVet Jan. 1, 2018 Dec. 2018 GF 300,000.00 300,000.00
001 furniture/ fixture
8000-000-1-1-
Purchase of Motor Vehicle (4x4
17-000-001- 2 PVet Jan. 1, 2018 Dec. 2018 Motor vehicle purchased GF 1,600,000.00 1,600,000.00
002 diesel pick up)
8000-000-1-2-
Forest Management and
02-002-000- II PNREO Jan. 1, 2018 Dec. 2018 GF -
000 Development
8000-000-1-2-
Nursery Management and various seedlings
02-002-000- A 1 PNREO Jan. 1, 2018 Dec. 2018 GF 50,000.00 50,000.00 50,000.00 M314-04
001 Operation propagated
8000-000-1-2-
02-003-000- III Environmental Management -
000
8000-000-1-2-
Implementation of RA 9003
02-003-000- A. 1 PNREO Jan. 1, 2018 Dec. 2018 GF -
001 within the Capitol
51% of wastes
8000-000-1-2- diversified
02-003-000- 2 Management of MRF PNREO Jan. 1, 2018 Dec. 2018 GF -
002
page32
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
8000-000-1-2- Monitoring of ESWM
6 municipalities
02-003-000- 3 implementation in the 6 PNREO Jan. 1, 2018 Dec. 2018 GF -
003 compliant to RA 9003
municipalities
8000-000-1-2-
02-004-000- IV III. Mines and Geo Science PNREO Jan. 1, 2018 Dec. 2018 GF -
000
8000-000-1-2-
10 SAG permit
02-004-000- A 1 Permit and Licensing PNREO Jan. 1, 2018 Dec. 2018 GF -
001 processed
8000-000-1-2-
02-000-001- B. 1 Provision for Capital Outlay PNREO Jan. 1, 2018 Dec. 2018 Purchased CO GF 160,000.00 160,000.00
001
8000-000-1-2-
Nursery Shed
02-000-001- 2 Construction of Nursery Shed PNREO Jan. 1, 2018 Dec. 2018 GF 100,000.00 100,000.00
002 constructed
SUB - TOTAL 10,185,519.00 1,369,000.00 260,000.00 11,814,519.00
8000-000-1-1-
General Administrative Support and
08-001-000- I PEO Jan. 1, 2018 Dec. 2018 All PPAs Implemented GF 30,367,863.00 3,470,000.00 33,837,863.00
000 Supervision Services program
8000-000-1-1-
Improvement/Rehabilitation of FTMR Improved/
08-001-000- 3 PEO Jan. 1, 2018 Dec. 2018 GF -
003 various Farm to Market Roads Rehabilitated
Improvement/Rehabilitation of
8000-000-1-1-
various Farm to Market Roads - FTMR Improved/
08-001-000- 4 PEO Jan. 1, 2018 Dec. 2018 GF -
004 Counterpart to FTMR under Rehabilitated
CMGP Project
8000-000-1-1- Purchased CO
08-000-001- B. 1 Provision for Capital Outlay PEO Jan. 1, 2018 Dec. 2018 computers/ copier/ GF 405,000.00 405,000.00
000 printer
SUB - TOTAL 30,367,863.00 3,470,000.00 405,000.00 34,242,863.00
page33
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
Economic and Entrepreneurship -
EEO -
8000-000-1-3- Business Operations
Business
02-001-000- I A 1 Business/Tourism Jan. 1, 2018 Dec. 2018 and Tourism programs GF 13,000,505.00 13,000,505.00
001 Operations/
fully implemented
Tourism/ ACC
8000-000-1-3- EEO-
02-001-000- 2 Provision for MOOE Business Jan. 1, 2018 Dec. 2018 All PPAs implemented GF 267,800.00 267,800.00
002 Operations
8000-000-1-3- EEO-
02-000-001- B. 1 Provision for Capital Outlay Business Jan. 1, 2018 Dec. 2018 equipment procured GF 125,000.00 125,000.00
001 Operations
SUB - TOTAL 13,000,505.00 267,800.00 125,000.00 13,393,305.00 - - -
8000-001-1-3-
02-001-000- I. A. 1 Provision for MOOE EEO-Tourism Jan. 1, 2018 Dec. 2018 All PPAs implemented GF 1,113,000.00 1,113,000.00
001
8000-001-1-3-
equipment/furniture/
02-000-001- B. 1 Provision for Capital Outlay EEO-Tourism Jan. 1, 2018 Dec. 2018 GF 681,000.00 681,000.00
001 fixtures procured
8000-001-1-3-
Procurement of Transportation sports motorcycle
02-000-001- 2 EEO-Toursim Jan. 1, 2018 Dec. 2018 GF 160,000.00 160,000.00
002 Equipment (sports motorcycle) procured
EEO-Aglipay
8000-002-1-3-
Caves and
02-000-001- B. 1 Installation of Water Pump Jan. 1, 2018 Dec. 2018 water pump installed GF 25,000.00 25,000.00
001 Campsite
(ACC)
SUB - TOTAL - 457,000.00 25,000.00 482,000.00 - - -
8000-003-1-3- EEO-
02-001-000- I. A. 1 Provision for MOOE Museum and Jan. 1, 2018 Dec. 2018 All PPAs implemented GF 381,000.00 381,000.00
001 Library
8000-003-1-3- EEO-
equipment/furniture/
02-000-001- B. 1 Provision for Capital Outlay Museum and Jan. 1, 2018 Dec. 2018 GF 1,000,000.00 1,000,000.00
001 fixtures procured
Library
SUB - TOTAL - 381,000.00 1,000,000.00 1,381,000.00 - - -
8000-004-1-3-
General Administrative Support and
02-001-000- I. EEO-CPHR Jan. 1, 2018 Dec. 2018 All PPAs implemented EEO 2,390,681.00 1,354,319.00 3,745,000.00
000 Supervision Program
8000-004-1-3- Clients/Customers
Food Service and Catering
02-001-000- A. 1 EEO-CPHR Jan. 1, 2018 Dec. 2018 Served/Catering EEO 1,005,000.00 1,005,000.00
001 Services
services accommodated
page34
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
8000-004-1-3- Clients accommodated/
02-001-000- 2 Accommodation EEO-CPHR Jan. 1, 2018 Dec. 2018 meetings/events EEO 450,000.00 450,000.00
002 conducted/utilized
SUB - TOTAL 2,390,681.00 2,809,319.00 - 5,200,000.00 - - -
8000-005-1-3-
General Administrative Support and
02-001-000- I. EEO-QCPM Jan. 1, 2018 Dec. 2018 All PPAs implemented EEO 1,542,309.00
000 Supervision Program
1,542,309.00
8000-005-1-3-
02-001-000- A. 1 Provision for MOOE EEO-QCPM Jan. 1, 2018 Dec. 2018 All PPAs implemented EEO 3,904,730.00 3,904,730.00
001
8000-005-1-3-
Furniture, Fixture, IT
02-000-001- B. 1 Provision for Capital Outlay EEO-QCPM Jan. 1, 2018 Dec. 2018 EEO 120,000.00 120,000.00
001 Equipment procured
8000-006-1-3-
03-001-000- A. 1 Provision for MOOE EEO-QIP Jan. 1, 2018 Dec. 2018 All PPAs implemented EEO 392,988.00 392,988.00
001
8000-006-1-3- warehouse
Repair, Maintenance and
03-000-001- 2 EEO-QIP Jan. 1, 2018 Dec. 2018 reapired/maintained/ EEO 150,000.00 150,000.00
002 expansion of warehouse
expanded
SUB - TOTAL 1,144,972.00 3,341,028.00 514,000.00 5,000,000.00
page35
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
Quirino Protection of
Watersheds, Ecosystems and
PPAs to Bantay Gubat
Rivers (QPOWER) Forest SPU Jan. 1, 2018 Dec. 2018
provided/
Protection Program (FPP) Start
8000-000-1-3- Up
05-002-000- 3 GF 11,350,000.00 11,350,000.00 14,400,000.00 M314-03
003 Quirino Protection of
Watersheds, Ecosystems and
activities for the
Rivers for Sustainability SPU Jan. 1, 2018 Dec. 2018
QPOWERS prepared
(QPOWERS) under People's
Survival Fund (PSF)
8000-000-1-3-
Enhanced National Greening Survey mapping and
05-002-000- 4 SPU Jan. 1, 2018 Dec. 2018 GF 320,000.00 320,000.00 320,000.00 M314-05
004 Program planning
Provided working
8000-000-1-3- capital(feedmill
05-003-001- B. 1 Provision of Capital Outlay Q-LIFE Jan. 1, 2018 Dec. 2018 processing/MPTG/GP)/ GF 4,508,000.00 4,508,000.00
001 Delivery elf/Kulong-
kulong procured
8000-000-1-3-
Representation Expense for the representation expense 5%
05-004-000- 3 PDRRMC Jan. 1, 2018 Dec. 2018 100,000.00 100,000.00
003 Deployment of PDNA provided LDRRMF
8000-000-1-3-
5%
05-004-000- 4 Transportation PDRRMC Jan. 1, 2018 Dec. 2018 transportation provided 200,000.00 200,000.00
004 LDRRMF
page36
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
8000-000-1-3- Foods and Drinks during the
foods and drinks 5%
05-004-000- 5 Monitoring of Weather PDRRMC Jan. 1, 2018 Dec. 2018 200,000.00 200,000.00
005 provided LDRRMF
Disburbance
8000-000-1-3-
emergency shelter 5%
05-004-000- 6 Provision of Emergency Shelter PDRRMC Jan. 1, 2018 Dec. 2018 500,000.00 500,000.00
006 maintained LDRRMF
8000-000-1-3-
Emergency Relief Supplies and PSWDO/PDR 5%
05-004-000- 7 Jan. 1, 2018 Dec. 2018 supplies provided 15,305,229.50 15,305,229.50
007 Equipment RMC LDRRMF
Total (30%) - 16,755,229.50 - 16,755,229.50
8000-000-1-3-
PRE DISASTER (PREPARATION)-
05-005-000- V. PDRRMO Jan. 1, 2018 Dec. 2018 5% LRRMF -
000 70%
DISASTER MITIGATION -
8000-000-1-3-
Implementation of Contour contour farming 5%
05-005-000- A. 1 OPAg Jan. 1, 2018 Dec. 2018 500,000.00 500,000.00 500,000.00 A113-08
001 Farming implemented LDRRMF
8000-000-1-3-
5%
05-005-000- 2 Environmental Management PNREO Jan. 1, 2018 Dec. 2018 trees planted 1,000,000.00 1,000,000.00 1,000,000.00 - A314-01
002 LDRRMF
8000-000-1-3-
Provision of Disaster Resilient disaster resilient crops
05-005-000- 3 OPAg Jan. 1, 2018 Dec. 2018 5% LRRMF 1,000,000.00 1,000,000.00 1,000,000.00 - A112-04
003 Crops provided
DISASTER PREPAREDNESS
8000-000-1-3-
Provision of Emergency PDRRMO/AB survival kit provided to 5%
05-005-000- 6 Jan. 1, 2018 Dec. 2018 800,000.00 800,000.00
006 Survival Kit for the Barangays C the 750 families LDRRMF
8000-000-1-3-
5%
05-005-000- 7 Capacity Building (Training) PDRRMO Jan. 1, 2018 Dec. 2018 16 trainings 600 pax 3,000,000.00 3,000,000.00
007 LDRRMF
5%
1. Medical First Reponder PDRRMO Jan. 1, 2018 Dec. 2018 trainings conducted -
LDRRMF
2. Emergency Medical 5%
PDRRMO Jan. 1, 2018 Dec. 2018 trainings conducted -
Technician - Basic LDRRMF
3. Emergency Operation 5%
PDRRMO Jan. 1, 2018 Dec. 2018 trainings conducted -
Center Management Training LDRRMF
4. ICS Training-Barangays, 5%
PDRRMO Jan. 1, 2018 Dec. 2018 trainings conducted -
PDRRMC/MDRRMC LDRRMF
page37
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
5. Health in Disaster and 5%
PDRRMO Jan. 1, 2018 Dec. 2018 trainings conducted -
Emergency LDRRMF
5%
6. Safety Dispatcher Course PDRRMO Jan. 1, 2018 Dec. 2018 trainings conducted -
LDRRMF
5%
10. Training on RDANA PDRRMO Jan. 1, 2018 Dec. 2018 trainings conducted -
LDRRMF
8000-000-1-3-
Fabrication and Installation of hotline billboard and 5%
05-005-000- 8 PDRRMO Jan. 1, 2018 Dec. 2018 49,000.00 49,000.00
008 Hotline Billboards and Signages signages installed LDRRMF
8000-000-1-3-
Provision of Flip Charts on 5%
05-005-000- 9 PDRRMO Jan. 1, 2018 Dec. 2018 flip charts provided 100,000.00 100,000.00
009 DRRM LDRRMF
page38
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
8000-000-1-3-
Blood Supplies/Donors/ recruitment/IEC 5%
05-005-000- 13 PDRRMO Jan. 1, 2018 Dec. 2018 100,000.00 100,000.00
013 Recruitment/ IEC conducted LDRRMF
8000-000-1-3-
Conduct of Volunteers volunteers refresher 5%
05-005-000- 14 PDRRMO Jan. 1, 2018 Dec. 2018 100,000.00 100,000.00
014 Refresher Course course conducted LDRRMF
8000-000-1-3-
5%
05-005-000- 15 IEC Activities PDRRMC Jan. 1, 2018 Dec. 2018 IEC activities conducted 100,000.00 100,000.00 100,000.00 M323-01
015 LDRRMF
8000-000-1-3-
Advocacy/Drills About DRRM 5%
05-005-000- 16 PDRRMC Jan. 1, 2018 Dec. 2018 IEC activities conducted 300,000.00 300,000.00
016 (Barangay and School) LDRRMF
Observance of Disaster
8000-000-1-3-
Resilience Month (Caravan disaster resilience 5%
05-005-000- 17 PDRRMC Jan. 1, 2018 Dec. 2018 120,000.00 120,000.00
017 Awards and Recognition/Clean month celebrated LDRRMF
Up Drive)
8000-000-1-3- Others
volunteers and staff 5%
05-005-000- 18 PRC Jan. 1, 2018 Dec. 2018 50,000.00 50,000.00 50,000.00 - A411-07
018 Insurance of Volunteers and insured LDRRMF
Staff
8000-000-1-3-
5%
05-005-000- 19 Stockpiling of Relief Goods PDRRMC Jan. 1, 2018 Dec. 2018 relief goods purchased 1,000,000.00 1,000,000.00
019 LDRRMF
RESPONSE -
8000-000-1-3-
Purchase of Rescue Rescue Equipment 5%
05-005-000- 22 PDRRMC Jan. 1, 2018 Dec. 2018 1,000,000.00 1,000,000.00
022 Equipment/ PPEs: purchased LDRRMF
page39
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
2. Mountain Rescue
Equipment
3. Personal Protective
Equipment
4. Replacement of Medical
500,000.00 - 500,000.00
Supplies and Equipment
6. Enhancement of
200,000.00 - 200,000.00
Communication Equipment
7. Purchase of ICT
100,000.00 100,000.00
Equipment
8000-000-1-3-
Provision of Assistance to Fire assistance to fire victims 5%
05-005-000- 23 PDRRMO Jan. 1, 2018 Dec. 2018 100,000.00 100,000.00
023 Victims (Cash/In Kind) provided LDRRMF
Purchase/Rental of Heavy
8000-000-1-3- Equipment heavy equipment 5%
05-005-000- 26 PDRRMC Jan. 1, 2018 Dec. 2018 14,000,000.00 14,000,000.00
026 purchased/ rented LDRRMF
- Boom Truck, Dump Truck,
Elf, Forward truck
page40
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
8000-000-1-3- Cluster 1 - San Antonio, Diego
FTMR improved/
05-007-001- B. 1 Silang, Ma. Clara, PGQ Jan. 1, 2018 Dec. 2018 20% 3,000,000.00 3,000,000.00
001 rehabilitated
Diffun,Quirino
8000-000-1-3- Cluster 2 - San Isidro, Isidro
FTMR improved/
05-007-001- 2 Paredes, Gulac, Rizal, Diffun, PGQ Jan. 1, 2018 Dec. 2018 20% 4,000,000.00 4,000,000.00
002 rehabilitated
Quirino
8000-000-1-3-
Cluster 4 - Ricarte Norte, FTMR improved/
05-007-001- 4 PGQ Jan. 1, 2018 Dec. 2018 20% 2,000,000.00 2,000,000.00
004 Liwayway, Diffun, Quirino rehabilitated
8000-000-1-3-
Cluster 6 - Villarose, FTMR improved/
05-007-001- 5 PGQ Jan. 1, 2018 Dec. 2018 20% 1,000,000.00 1,000,000.00
005 Cabarroguis, Quirino rehabilitated
8000-000-1-3-
Cluster 9 - Gundaway, Zamora, FTMR improved/
05-007-001- 8 PGQ Jan. 1, 2018 Dec. 2018 20% 3,000,000.00 3,000,000.00
008 Villamor, Cabarroguis, Quirino rehabilitated
8000-000-1-3-
Cluster 16 - Villa Santiago, FTMR improved/
05-007-001- 14 PGQ Jan. 1, 2018 Dec. 2018 20% 2,000,000.00 2,000,000.00
014 Dungo, Aglipay, Quirino rehabilitated
page41
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
Construction, Improvement of
Various Infrastructure & Economic
Various Infrastructure
8000.126 II. Development Projects, Solid Waste PGQ Jan. 1, 2018 Dec. 2018
Projects iImplemented
20% -
Management, Other Access Roads,
Watersystem, Electrification
8000-000-1-3-
SWM facilities
05-007-002- 1 Aglipay PGQ Jan. 1, 2018 Dec. 2018 20% 100,000.00 1,400,000.00 1,500,000.00 1,500,000.00 M324-03
001 comstructed/ improved
8000-000-1-3-
SWM facilities
05-007-002- 2 Cabarroguis PGQ Jan. 1, 2018 Dec. 2018 20% 100,000.00 1,400,000.00 1,500,000.00 1,500,000.00 M324-03
002 comstructed/ improved
8000-000-1-3-
SWM facilities
05-007-002- 3 Diffun PGQ Jan. 1, 2018 Dec. 2018 20% 100,000.00 1,400,000.00 1,500,000.00 1,500,000.00 M324-03
003 comstructed/ improved
8000-000-1-3-
SWM facilities
05-007-002- 4 Maddela PGQ Jan. 1, 2018 Dec. 2018 20% 100,000.00 1,400,000.00 1,500,000.00 1,500,000.00 M324-03
004 comstructed/ improved
8000-000-1-3-
SWM facilities
05-007-002- 5 Nagtipunan PGQ Jan. 1, 2018 Dec. 2018 20% 100,000.00 1,400,000.00 1,500,000.00 1,500,000.00 M324-03
005 comstructed/ improved
8000-000-1-3-
SWM facilities
05-007-002- 6 Saguday PGQ Jan. 1, 2018 Dec. 2018 20% 100,000.00 1,400,000.00 1,500,000.00 1,500,000.00 M324-03
006 comstructed/ improved
B. Improvement/ Rehabilitation of
8000-000-1-3-
Various Farm to Market FTMR improved/
05-007-003- B PGQ Jan. 1, 2018 Dec. 2018 20%
000 Roads/Counterpart to FTMR rehabilitated
under PRDP Projects
page42
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
8000-000-1-3-
Gundaway, Cabarroguis - Doña FTMR improved/
05-007-003- 1 PGQ Jan. 1, 2018 Dec. 2018 20% 5,779,900.00
001 Imelda, Diffun, Quirino rehabilitated
5,779,900.00
8000-000-1-3-
Ricarte Sur - Magsaysay, Diffun, FTMR improved/
05-007-003- 2 PGQ Jan. 1, 2018 Dec. 2018 20% 12,042,000.00
002 Quirino rehabilitated
12,042,000.00
8000-000-1-3-
Lusod-Sto. Niño, Maddela, FTMR improved/
05-007-003- 3 PGQ Jan. 1, 2018 Dec. 2018 20% 4,657,000.00
003 Quirino rehabilitated
4,657,000.00
8000-000-1-3-
Dungo, Aglipay -San Salvador- FTMR improved/
05-007-003- 4 PGQ Jan. 1, 2018 Dec. 2018 20%
004 Divisoria Sur, Maddela, Quirino rehabilitated
10,561,900.00 10,561,900.00
8000-000-1-3-
Barangay roads
05-007-005- B. 1 Cabugao, Aglipay, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
001 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 2 Diodol, Aglipay, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
002 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 3 Dungo, Aglipay, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
003 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 4 Ligaya, Aglipay, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
004 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 5 Nagabgaban, Aglipay, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
005 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 6 Palacian, Aglipay, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
006 rehabilitated
8000-000-1-3-
Pinaripad Norte, Aglipay, Barangay roads
05-007-005- 7 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
007 Quirino rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 8 Pinaripad Sur, Aglipay, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
008 rehabilitated
page43
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
8000-000-1-3-
Barangay roads
05-007-005- 9 Rang-Ayan, Aglipay, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
009 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 10 San leonardo, Aglipay, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
010 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 11 Villa Santiago, Aglipay, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
011 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 12 Villa Ventura, Aglipay, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
012 rehabilitated
CABARROGUIS (11
-
barangays)
8000-000-1-3-
Barangay roads
05-007-005- 13 Del Pilar, Cabarroguis, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
013 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 14 Burgos, Cabarroguis, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
014 rehabilitated
8000-000-1-3-
Gundaway, Cabarroguis, Barangay roads
05-007-005- 15 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
015 Quirino rehabilitated
8000-000-1-3-
Mangandingay, Cabarroguis, Barangay roads
05-007-005- 16 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
016 Quirino rehabilitated
8000-000-1-3-
San Marcos, Cabarroguis, Barangay roads
05-007-005- 17 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
017 Quirino rehabilitated
8000-000-1-3-
Sto. Domingo, Cabarroguis, Barangay roads
05-007-005- 18 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
018 Quirino rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 19 Villamor, Cabarroguis, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
019 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 20 Villa Peña, Cabarroguis, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
020 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 21 Villarose, Cabarroguis, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
021 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 22 Zamora, Cabarroguis, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
022 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 23 Banuar, Cabarroguis, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
023 rehabilitated
page44
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
DIFFUN (12 barangays) -
8000-000-1-3-
Andres Bonifacio, Diffun, Barangay roads
05-007-005- 24 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
024 Quirino rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 25 Aurora East, Diffun, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
025 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 26 Aurora West, Diffun, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
026 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 27 Cajel, Diffun, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
027 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 28 Diego Silang, Diffun, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
028 rehabilitated
8000-000-1-3-
Don Mariano Perez, Diffun, Barangay roads
05-007-005- 29 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
029 Quirino rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 30 Guribang, Diffun, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
030 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 31 Isidro Paredes, Diffun, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
031 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 32 Maria Clara, Diffun, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
032 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 33 Rizal, Diffun, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
033 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 34 San Antonio, Diffun, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
034 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 35 Balagbag, Diffun, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
035 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 38 3. Diduyon, Maddela, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
038 rehabilitated
8000-000-1-3-
4. Dumabato Sur, Maddela, Barangay roads
05-007-005- 39 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
039 Quirino rehabilitated
page45
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
8000-000-1-3-
Barangay roads
05-007-005- 40 5. Lusod, Maddela, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
040 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 41 6. Pedlisan, Maddela, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
041 rehabilitated
8000-000-1-3-
7. Poblacion Norte, Maddela, Barangay roads
05-007-005- 42 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
042 Quirino rehabilitated
8000-000-1-3-
8. Poblacion Sur, Maddela, Barangay roads
05-007-005- 43 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
043 Quirino rehabilitated
8000-000-1-3-
9. Santa Maria, Maddela, Barangay roads
05-007-005- 44 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
044 Quirino rehabilitated
8000-000-1-3-
10. Villa Hermosa Norte, Barangay roads
05-007-005- 45 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
045 Maddela, Quirino rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 46 11. Villa Sur, Maddela Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
046 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 47 12.Cabaruan, maddela, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
047 rehabilitated
NAGTIPUNAN (6 barangays) -
8000-000-1-3-
1. Dipantan, Nagtipunan, Barangay roads
05-007-005- 48 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
048 Quirino rehabilitated
8000-000-1-3-
2. Landingan, Nagtipunan, Barangay roads
05-007-005- 49 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
049 Quirino rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 50 3. Ponggo, Nagtipunan, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
050 rehabilitated
8000-000-1-3-
4. Sangbay, Nagtipunan, Barangay roads
05-007-005- 51 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
051 Quirino rehabilitated
8000-000-1-3-
5. San Dionisio II, Nagtipunan, Barangay roads
05-007-005- 52 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
052 Quirino rehabilitated
8000-000-1-3-
6. San Ramos, Nagtipunan, Barangay roads
05-007-005- 53 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
053 Quirino rehabilitated
SAGUDAY (9 barangays) -
8000-000-1-3-
Barangay roads
05-007-005- 54 1. Cardenas, Saguday, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
054 rehabilitated
page46
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
8000-000-1-3-
Barangay roads
05-007-005- 55 2. Dibul, Saguday, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
055 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 56 3. Gamis, Saguday, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
056 rehabilitated
8000-000-1-3-
4. Magsaysay, Saguday, Barangay roads
05-007-005- 57 PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
057 Quirino rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 58 5. Rizal, Saguday, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
058 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 59 6. Salvacion, Saguday, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
059 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 60 7. Sto. Tomas, Saguday, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
060 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 61 8. La Paz, Saguday, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
061 rehabilitated
8000-000-1-3-
Barangay roads
05-007-005- 62 9. Tres reyes, Saguday, Quirino PGQ Jan. 1, 2018 Dec. 2018 20% 200,000.00 200,000.00
062 rehabilitated
Tourism Facilities
8000.129 V. Tourism Facility Development PGQ Jan. 1, 2018 Dec. 2018 Constructed, 20% -
Purchased/Procured
TOTAL GENERAL FUND AND EEO 390,730,296.52 503,280,538.50 252,228,340.98 1,143,239,176.00 61,712,000.00 23,940,000.00 -
page47
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
SPECIAL PROJECT - DENR/NGP -
9000-000-1-3-
Quirino River Watershed Rehabilitation
06-001-000- I. Q-Life Upland Jan. 1, 2018 Dec. 2018 Watershed rehabilitated DENR - 10,000,000.00 10,000,000.00 10,000,000.00 A314-01
000 Project (QRWRP)
9000-000-1-3-
A314-01/
06-002-000- II. Enhanced National Greening Program SPU Jan. 1, 2018 Dec. 2018 Watershed rehabilitated DENR - 10,000,000.00 10,000,000.00 5,000,000.00 5,000,000.00
000 M314-01
9000-000-1-3-
A314-02/
06-003-000- III. QPOWER - Forest Protection Program PNREO Jan. 1, 2018 Dec. 2018 All PPAs implemented DENR - 35,000,000.00 35,000,000.00 15,000,000.00 20,000,000.00
000 M-314-02
9000-000-1-3-
FTMR Improved/
06-004-000- VI. CASECNAN PGQ/PEO Jan. 1, 2018 Dec. 2018 CASECNAN 50,000,000.00 50,000,000.00 50,000,000.00 M634-01
000 Rehabilitated
9000-000-1-3-
06-005-000- VII.
Conditional Matching Grant to FTMR Improved/
PGQ/PEO Jan. 1, 2018 Dec. 2018 CMGP 191,915,988.00 191,915,988.00 191,915,988.00 M634-01
000 Provinces (CMGP/KALSADA) Rehabilitated
9000-000-1-3-
Gundaway, Cabarroguis - Doña FTMR improved/
06-006-000- B. 1 PGQ Jan. 1, 2018 Dec. 2018 PRDP 55,317,000.00 55,317,000.00 55,317,000.00 M634-01
001 Imelda, Diffun, Quirino rehabilitated
9000-000-1-3-
Ricarte Sur - Magsaysay, Diffun, FTMR improved/
06-006-000- 2 PGQ Jan. 1, 2018 Dec. 2018 PRDP 92,050,000.00 92,050,000.00 92,050,000.00 M634-01
002 Quirino rehabilitated
9000-000-1-3-
Lusod-Sto. Niño, Maddela, FTMR improved/
06-006-000- 3 PGQ Jan. 1, 2018 Dec. 2018 PRDP 49,560,000.00 49,560,000.00 49,560,000.00 M634-01
003 Quirino rehabilitated
9000-000-1-3-
Dungo, Aglipay - San Salvador- FTMR improved/
06-006-000- 4 PGQ Jan. 1, 2018 Dec. 2018 PRDP 107,186,000.00 107,186,000.00 107,186,000.00 M634-01
004 Divisoria Sur, Maddela, Quirino rehabilitated
TOTAL PROJECTS FUNDED FROM NATIONAL AGENCIES - - 601,028,988.00 601,028,988.00 30,000,000.00 571,028,988.00 -
page48
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
As of January 2018- December 2018
Province: Quirino
AIP Implementing SCHEDULE OF IMPLEMENTATION FUNDING AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
Maintenance &
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS SOURCE Personal Capital Outlays TOTAL cc
Other Operating
Expenses Climate Change Climate Change Typology
Code LOCATION OF PROJECT Department DATE DATE Services (PS) (CO)
(MOOE) Adaptation Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
9000-000-1-3-
06-007-000- IV. KOICA - QIADP PNREO Jan. 1, 2018 Dec. 2018 All PPAs implemented KOICA 10,000,000.00 10,000,000.00 10,000,000.00 A314-02
000
9000-000-1-3-
A314-02/
06-008-000- V. KOICA - QIRD PNREO Jan. 1, 2018 Dec. 2018 All PPAs implemented KOICA 250,000,000.00 250,000,000.00 200,000,000.00 50,000,000.00
000 M314-08
page49
ANNUAL INVESTMENT PROGRAM (AIP)
By Program/Project/Activity by Sector
January 2018- December 2018
Province: Quirino
AIP Implementing Schedule of Implementation AMOUNT (in thousand pesos) Amount of Climate Change Expenditure
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS FUNDIN Personal Maintenance & Other Capital Outlays TOTAL Climate Change cc
G Climate
SOURCE Services Operating Exp.
Adaptation Change
Typology
Code LOCATION OF PROJECT Department DATE DATE (PS) (MOOE) (CO) Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
Province: Quirino
AIP Implementing Schedule of Implementation AMOUNT (in thousand pesos) Amount of Climate Change Expenditure
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS FUNDIN Personal Maintenance & Other Capital Outlays TOTAL Climate Change cc
G Climate
SOURCE Services Operating Exp.
Adaptation Change
Typology
Code LOCATION OF PROJECT Department DATE DATE (PS) (MOOE) (CO) Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
SWM facilities
1. Aglipay PGQ January 2018 December 2018 20% 100,000.00 1,400,000.00 1,500,000.00
comstructed/ improved
SWM facilities
2. Cabarroguis PGQ January 2018 December 2018 20% 100,000.00 1,400,000.00 1,500,000.00
comstructed/ improved
SWM facilities
3. Diffun PGQ January 2018 December 2018 20% 100,000.00 1,400,000.00 1,500,000.00
comstructed/ improved
SWM facilities
4. Maddela PGQ January 2018 December 2018 20% 100,000.00 1,400,000.00 1,500,000.00
comstructed/ improved
SWM facilities
5. Nagtipunan PGQ January 2018 December 2018 20% 100,000.00 1,400,000.00 1,500,000.00
comstructed/ improved
SWM facilities
6. Saguday PGQ January 2018 December 2018 20% 100,000.00 1,400,000.00 1,500,000.00
comstructed/ improved
Province: Quirino
AIP Implementing Schedule of Implementation AMOUNT (in thousand pesos) Amount of Climate Change Expenditure
Reference PROGRAM/PROJECT/ACTIVITY Office/ STARTING COMPLETION EXPECTED OUTPUTS FUNDIN Personal Maintenance & Other Capital Outlays TOTAL Climate Change cc
G Climate
SOURCE Services Operating Exp.
Adaptation Change
Typology
Code LOCATION OF PROJECT Department DATE DATE (PS) (MOOE) (CO) Mitigation Code
(1) (2) (3) (4) (5) (6) (7) (8) (8) (9) (10)
8000.129 Tourism Facility Development PGQ January 2018 December 2018 Tourism Facilities 20% 15,000,000.00 15,000,000.00
Constructed,
1. Governor's Rapids, Divisoria Sur, Maddela, Quirino Purchased/Procured
1000.162 Loan Amortization PGQ January 2018 December 2018 Loans paid 20% 25,000,000.00 25,000,000.00
Health
Health Facility Development for QPMC at Mangandingay, facilities/Equipments
3000.93 PGQ January 2018 December 2018 20% 8,860,000.00 8,860,000.00
Cabarroguis, Quirino constructed/ purchased/
repaired
1000.162 Loan Amortization PGQ January 2017December 2017 Loans paid 20%DF 24,331,076.00 24,331,076.00
Health
Health Facility Development Facilities
3000.93 for QPMC and District PGQ January 2017December 2017Constructed/ 20% 10,000,000.00 10,000,000.00
Hospitals Purchased/
Repaired
Rehabilitation/Improveme
Local Roads
nt/ Maintenance of Various
and Bridges
8000.125 Provincial Roads & PGQ January 2017December 2017 20% 26,400,000.00 26,400,000.00
rehabilitated/
Bridges for All
maintained
Municipalities
A.
Improvement/Rehabilitation/
-
Maintenance of Local Roads
for the 132 Barangays
Local Roads
rehabilitated/
a. Aglipay (25 Barangays) improved/m
including counterpart for the PGQ January 2017December 2017 aintained in 20% -
KALSADA Project the 25
barangays
of Aglipay
Local Roads
rehabilitated/
improved/m
b. Cabarroguis (17 aintained in
PGQ January 2017December 2017 20% -
barangays) the 17
barangays
of
Cabarroguis
Local Roads
rehabilitated/
c. Diffun (33 barangays) improved/m
including counterpart for the PGQ January 2017December 2017 aintained in 20% -
KALSADA Project the 33
barangays
ofLocal
Diffun
Roads/Bridg
es
rehabilitated/
d. Maddela (32 barangays) PGQ January 2017December 2017 improved/m 20% -
aintained in
the 32
barangays
Local Roads
of Maddela
improved/re
habilitated/m
e. Nagtipunan (16 aintained in
PGQ January 2017December 2017 20% -
barangays) the 16
barangays
of
Nagtipunan
Page 56
Local Roads
rehabilitated/
f. Saguday (9barangays) improved/m
including counterpart for the PGQ January 2017December 2017 aintained in 20% -
KALSADA Project the 9
barangays
of Saguday
Construction, Improvement
of Various Infrastructure & Various
Economic Development Infrastructur
8000.126 Projects, Solid Waste PGQ January 2017December 2017 e Projects 20% -
Management, other Access iImplemente
Roads, Watersystem, d
Electrification
A. Construction/
Improvement of Solid Waste -
Management Facilities
SWM
facilities
1. Aglipay PGQ January 2017December 2017 20% 100,000.00 1,400,000.00 1,500,000.00
comstructed/
improved
SWM
facilities
2. Cabarroguis PGQ January 2017December 2017 20% 100,000.00 1,400,000.00 1,500,000.00
comstructed/
improved
SWM
facilities
3. Diffun PGQ January 2017December 2017 20% 100,000.00 1,400,000.00 1,500,000.00
comstructed/
improved
SWM
facilities
4. Maddela PGQ January 2017December 2017 20% 100,000.00 1,400,000.00 1,500,000.00
comstructed/
improved
SWM
facilities
5. Nagtipunan PGQ January 2017December 2017 20% 100,000.00 1,400,000.00 1,500,000.00
comstructed/
improved
SWM
facilities
6. Saguday PGQ January 2017December 2017 20% 100,000.00 1,400,000.00 1,500,000.00
comstructed/
improved
B.
Improvement/Rehabilitation
of Various Farm to Market
PGQ January 2017December 2017 20% 58,000,000.00 58,000,000.00
Roads per
Municipality/Counterpart to
FTMR under PRDP Projects
FTMR
1. Aglipay PGQ January 2017December 2017 improved/re 20% -
habilitated
FTMR
2. Cabarroguis PGQ January 2017December 2017 improved/re 20% -
habilitated
FTMR
3. Diffun PGQ January 2017December 2017 improved/re 20% -
habilitated
Page 56
FTMR
4. Maddela PGQ January 2017December 2017 improved/re 20% -
habilitated
FTMR
5. Nagtipunan PGQ January 2017December 2017 improved/re 20% -
habilitated
FTMR
6. Saguday PGQ January 2017December 2017 improved/re 20% -
habilitated
-
Construction,
Various
Improvement of Various
infrastructur
8000.127 Infrastructure & Economic PGQ January 2017December 2017 20% 6,000,000.00 6,000,000.00
e projects
Development Projects
implemented
Phase II
Construction/Improvement
of watersystem, multi Various
purpose halls, livelihood and infrastructur
PGQ January 2017December 2017 20% -
other economic e projects
development projects for implemented
District I
Diffun - 33 barangays -
Cabarroguis - 17
-
barangays
Saguday - 9 barangays -
Construction/Improvement
of watersystem, multi Various
purpose halls, livelihood and infrastructur
PGQ January 2017December 2017 20% -
other economic e projects
development projects for implemented
District II
Aglipay - 25 barangays -
Maddela - 32 barangays -
Nagtipunan - 16
-
barangays
Barangay Caravan Barangay
8000.128 (P200,000/barangay) 70 PGQ January 2017December 2017 roads 20% 14,000,000.00 14,000,000.00
barangays rehabilitated
Page 56
SUMMARY
AMOUNT (in thousand pesos) Amount of Climate Change Expendituree
14969355
0.078388
74235473
0.36048
479778
0.037926