STRUMIS - Implementation Survey V2.0
STRUMIS - Implementation Survey V2.0
Fax: -
Address: Plot No. 31, Light Industrial Area, Bhilai - 490026, Dist: Durg, Chattisgarh, INDIA
Introduction
The sections of this document each have a specific purpose as outlined on the cover pages; however
the ultimate goal is to provide STRUMIS with as much up-front information about your business and
software requirements so that we are best able to tailor the implementation to suit your specific
needs.
Purpose
This document is intended to gather as some key information about your company before
implementing and training STRUMIS. The overall implementation of STRUMIS is split into 3 basic
elements; Software Installation and Set-up, Training and Go-Live. STRUMIS provides a professional
on-site service to perform each element of the software Implementation.
Document1 Page 2 of 11
STRUMIS Implementation Survey
Contacts
In order that we contact the correct personnel, could you identify the relevant additional personnel
below? We appreciate that in some businesses there may be some personnel that cover multiple
roles.
Project Milestones
Milestone Date(s)
Implementation Introduction Date 23.05.2018
Implementation / Pre Configuration Kick Off Call Date 24.05.2018
Technical Installation Date ?? (StruMIS to provide manual)
Payment Due Date 1st Installation: 22.05.2018
2nd Installation: 10.06.2018
Information / Data Required by Date ??
Pre Implementation /Configuration Date 30.05.208
Training Dates 4th - 8th June, 2018
Document1 Page 3 of 11
STRUMIS Implementation Survey
Training Requirements
The Training plan will be sent with the Implementation survey, the training plan is tried and tested,
and delivered in the best order of sequence to underpin the knowledge required. We appreciate
that juggling business as usual and training, sometimes affects the order of sequence.
To allow STRUMIS to be delivered effectively please complete the STRUMIS TRAINING – Candidate
Attendee List Please be advised to order your on-site implementation early as there can be
between 8 - 12 week lead times due to varying demand on our teams throughout the year.
Training Resources
In order to deliver the training effectively and for the candidates to underpin the knowledge
received, we recommend that training PC’s are available during the training duration and a suitable
room. If there is also the advantage of a projector to aid the training delivery could we ask this is
booked for the duration? The recommendation of a maximum of 2 candidates to one PC for
training, with a maximum of 8 per training session.
Please fill out the names and positions of the candidates you wish to attend the training and Tick the
relevant days attending. This document is required to be completed in order to booked and confirm
your training dates.
Please refer to the 10 Day Standard Implementation Training Plan for the detail of what is covered
on each day
Document1 Page 4 of 11
STRUMIS Implementation Survey
Technical / IT Installation
Server
Yes No
Is there a server available for the STRUMIS server/database to be
installed on?
Yes No
Is the server hardware in place?
Yes No
If no, do you require assistance to specify the Hardware?
Yes No
Do you require us to walk through the server install alongside
Yourself or your IT consultants?
If this is yes and you require STRUMIS to install the server and clients alone, this will be charged for
accordingly.
Yes No
Does it meet the recommended specifications?
What is/will be the Server specification?
Windows 10 Pro 32 BIt 64 Bit
Operating System
Processor (s) Intel Core i5 - 7500 CPU @ 3.4 GHz
Yes No
Do you have you SQL Server Installed?
(** SQL Server Express comes with the application up to 10 Users)
If YES what version:
Client Installations
No of computers / Windows Operating System
How many clients are you looking to install on? 10
Yes
Do they meet the recommended requirements denoted within the System Prerequisites?
Network Infrastructure
Document1 Page 5 of 11
STRUMIS Implementation Survey
What are your data requirements for adding to the StruMIS database?
Customers
Suppliers
Employee
Users
Item Location
Please see STRUMIS Pre-Implementation Workbook
Yes No
Do you have a process flow diagram?
(Please provide a copy) – Already shared with StruMIS
Document1 Page 6 of 11
STRUMIS Implementation Survey
Do you have a company logo you would like to be stored against your system reports and forms? – Please
refer attachment for SISCOL’s logo
Yes No
Detailing
How does the company produce drawings? In-house Subcontract
20 In House % 80 Subcontract %
Tekla Other
BoCAD AutoCAD
SDS/2
Advanced Steel
Yes No
Can you provide an example Model & NC Files for training?
Estimating
Which types of Estimates does the Company wish to produce in StruMIS?
From drawings
Import Models
Unit Price / B.O.Q (Bill of Quantities)
Electronic Take off – Blue beam
When producing a steelwork Estimate, how does the Company calculate the cost of Fittings?
Document1 Page 7 of 11
STRUMIS Implementation Survey
Contracts
(Your typical project / contract by Weight?)
What tonnage of steelwork does the company fabricate per month? 2500 Tons
Yes No
Does the company purchase and supply cold rolled steelwork?
Which Cold Rolled manufacturers does the Company use on a regular basis?
Test Certificates
Drawings
NC Files
Contractual Documents
Financial Documents
Administration Documents
Document1 Page 8 of 11
STRUMIS Implementation Survey
Finance
Does the company wish to us STRUMIS functionality? (more briefing needed from StruMIS)
Employee Timesheets
Transaction Interfaces
Purchasing
How does the company purchase steel?
Do you have a company logo you would like to be stored against your system reports and forms?
Yes No
Production
Are the following processes subcontracted out?
Paint/Surface Treatment
Fabrication
Erection
Yes No
Do you fabricate plate girders?
Yes No
Are you intending to use Bar-Coding within STRUMIS?
Yes No
Does the company have fabrication machinery? (CNC/OTHER)
Please see additional form on attached
Lantek
Document1 Page 9 of 11
STRUMIS Implementation Survey
Pro Nest
Document1 Page 10 of 11
STRUMIS Implementation Survey
There will be an additional form to complete. This form allows you to denote your current
machinery and its appropriate functions to allow your Technical Consultant to setup your system.
STRUMIS Workbook
There is an additional spreadsheet to complete, this workbook are the standard templates of
information that can be efficiently imported into your database.
Document1 Page 11 of 11