Program of WORK 2018

The document is a program of works for installing a concrete roof over the stage at Dalogo Elementary School in Polangui, Albay, Philippines. It will cost PHP 40,975 to complete the project using local funds. Materials such as cement, gravel, rebar, and lumber are listed along with their quantities and costs. The work is scheduled to be finished by a certain completion period. School officials inspected the site and recommended the roofing project after finding the school stage currently lacks a roof.

Uploaded by

Dexter Rabo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
211 views5 pages

Program of WORK 2018

The document is a program of works for installing a concrete roof over the stage at Dalogo Elementary School in Polangui, Albay, Philippines. It will cost PHP 40,975 to complete the project using local funds. Materials such as cement, gravel, rebar, and lumber are listed along with their quantities and costs. The work is scheduled to be finished by a certain completion period. School officials inspected the site and recommended the roofing project after finding the school stage currently lacks a roof.

Uploaded by

Dexter Rabo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Republic of the Philippines

Department of Education
Region V (Bicol)
Division of Albay
Legazpi City

PROGRAM OF WORKS

School: DALOGO ELEMENTARY SCHOOL Date:


Project Cost: Php 40,975.00
District: POLANGUI NORTH Source of Fund : MOOE 2018
Project Title: INSTALLATION OF CONCRETE ROOFING OF SCHOOL STAGE (PHASE 1) Materials: 32,975.00
Transportation: 1,000.00
Labor: 7,000.00
Nature of Implementation: Completion Period:

ITEM UNIT
ITEM DESCRITION UNIT QUANTITY GRAND TOTAL
NO. PRICE
1 Cement bag 38 255.00 9,690.00
2 Gravel cu. m 3 800.00 2,400.00
3 Sand cu. m 5 500.00 2,500.00
4 Round Bar, 10 mm piece 30 100.00 3,000.00
5 Round Bar,12 mm piece 15 170.00 2,550.00
6 Tie Wire kilo 4 62.50 250.00
7 Plywood (1/4") piece 15 450.00 6,750.00
8 Coco Lumber 2x2x12 piece 63 85.00 5,355.00
9 Nails, 1" kilo 2 80.00 160.00
10 Nails, 3" kilo 2 80.00 160.00
11 Nails, 4" kilo 2 80.00 160.00
12 -
-
TOTAL MATERIALS COST 32,975.00
ADD: TRANSPORTATION COST 1,000.00
LABOR COST 7,000.00
TOTAL PROJECT COST 40,975.00

Prepared By: Certified Correct:

DEXTER V. RABO JOSELYN N. SAMPAL


School Physical Facilities School Head

Recommending Approval: Approved By:

ENGR. ANDREW M. EBIO, JR. BEBIANO I. SENTILLAS


Division Physical Facilities Coordinator Head of Agency
TILLAS
Republic of the Philippines
Department of Education
Region V (Bicol)
Division of Albay
DALOGO ELEMENTARY SCHOOL
Legazpi City

BILL OF MATERIALS

UNIT
QUANTITY UNIT ITEM DESCRITION AMOUNT
PRICE
38 bag Cement 255.00 Php 9,690.00
3 cu. m Gravel 800.00 2,400.00
5 cu. m Sand 500.00 2,500.00
30 piece Round Bar, 10 mm 100.00 3,000.00
15 piece Round Bar,12 mm 170.00 2,550.00
4 kilo Tie Wire 62.50 250.00
15 piece Plywood (1/4") 450.00 6,750.00
63 piece Coco Lumber 2x2x12 85.00 5,355.00
2 kilo Nails, 1" 80.00 160.00
2 kilo Nails, 3" 80.00 160.00
2 kilo Nails, 4" 80.00 160.00
Php -

TOTAL MATERIALS COST Php 32,975.00

Prepared By: Certified Correct:

DEXTER V. RABO JOSELYN N. SAMPAL


School Physical Facilities School Head

Recommending Approval: Approved By:

ENGR. ANDREW M. EBIO, JR. BEBIANO I. SENTILLAS


Division Physical Facilities Coordinator Head of Agency
Republic of the Philippines
Department of Education
Region V (Bicol)
Division of Albay
DALOGO ELEMENTARY SCHOOL
Legazpi City

SCHOOL PRE-INSPECTION REPORT AND RECOMMENDATION

Name of School : DALOGO ELEMENTARY SCHOOL

District : POLANGUI NORTH Municipality : POLANGUI

School Head : JOSELYN N. SAMPAL Designation : PRINCIPAL I

Date of Ocular Inspection : 10 - FEBRUARY- 18

Findings : NO STAGE ROOFING

RECOMMENDATION : INSTALLATION OF CONCRETE ROOFING OF SCHOOL STAGE

Inspected By:

School Inspectorate Team

RICO C. BONDAL
Inspectorate Team Leader

MA. FE B. BALMACEDA LANA MAXIMA S. CEBUANO


Member Member

Noted:

JOSELYN N. SAMPAL
Head of School