DAY Section To Be Covered Sub-Station Primary Equipment

The document outlines a training schedule covering various electrical substation equipment from May 28 to July 17, including current and voltage transformers, power transformers, surge arrestors, capacitor banks, isolator and earth switches, and circuit breakers. It also covers project planning, systems for control, protection, monitoring, revenue, and communication, as well as substation maintenance, transmission lines, health and safety, and risk assessment and planning.

Uploaded by

aisha nakato
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views1 page

DAY Section To Be Covered Sub-Station Primary Equipment

The document outlines a training schedule covering various electrical substation equipment from May 28 to July 17, including current and voltage transformers, power transformers, surge arrestors, capacitor banks, isolator and earth switches, and circuit breakers. It also covers project planning, systems for control, protection, monitoring, revenue, and communication, as well as substation maintenance, transmission lines, health and safety, and risk assessment and planning.

Uploaded by

aisha nakato
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DAY SECTION TO BE COVERED

SUB-STATION PRIMARY EQUIPMENT


28 - 29 May Current transformer
30 - 31 May Voltage transformer
1 and 4 June Power transformer
5 -6 June Surge arrestor
7 -8 June Capacitor banks
11 - 12 June Isolator switch and earth switch
13 - 14 June Circuit breaker
PROJECT PLANNING
15-Jun Project planning
18-Jun Project procurement
19-Jun Project implementation
20-Jun Project closure
PROJECT SYSTEMS
21 - 22 June Control systems
25 - 26 June Protection systems
27 - 28 June Monitoring systems
29 June and 2 July Revenue systems
3 - 4 July Communication systems
5 - 6 July Substation maintenance

9 - 11 July TRANSMISSION LINE


12 - 13 July HSE
16 - 17 July RAP