PEP2 Gas & Oil Processing Plant Construction
PEP2 Gas & Oil Processing Plant Construction
PEP2 Gas & Oil Processing Plant Construction
http://www.slideshare.net/DavidHMoloney/oil-gas-plant-construction-project-execution-plan
Brief Description
Earthworks includes Excavation, Trenches, Haulage, Grading Backfilling, Filling & Compaction
7 km
14 minutes 7 km 14 minutes
3 minutes
Earthworks
CABC ( Crushed aggregate base course )
Testing Compaction
Mixing Plant
Site Trial
Earthworks
Mixing CABC
Earthworks
Spreading & Compaction CABC ( Crushed aggregate base course )
Earthworks
Spreading & Compaction CABC ( Crushed aggregate base course )
Earthworks
Spreading & Compaction CABC ( Crushed aggregate base course )
Rock - Excavability
The excavability of rock depends mainly on the rock strength and the layer thickness.
This diagram shows excavation methods for rock of various strengths and thicknesses,
with a free face.
ⓒ David H Moloney
Contents
Insitu Piling Construction - Plant & Methods
Crawler Crane
Piling Hammer
Casing
Piling Rig
Concrete Pump
Concrete Mixer Trucks
Tremie Pipe
Reinforcement Cage
ⓒ David H Moloney
Sheet Pile Shaft Temporary to Support Excavation
ⓒ David H Moloney
ⓒ David H Moloney
Secant Pile Construction - Sequence, Plant & Methods
ⓒ David H Moloney
Quay Wall
Marine
ⓒ David H Moloney
Breakwater
Marine
ⓒ David H Moloney
Dredging & Reclamation
Marine
ⓒ David H Moloney
Contents
Reinforced Wall Construction Sequence
ⓒ David H Moloney
Reinforced Wall Construction Sequence
Concrete
ⓒ David H Moloney
Reinforced Structure Construction Sequence
Concrete
ⓒ David H Moloney
Reinforced Construction Tank Sequence David H Moloney
ⓒ David H Moloney
Oil Interceptor Used to capture oil / fuel from leaks or spillages that are washed down
drains every time it rains.
Miscellaneous
Oil Interceptor
Concrete
Earthworks
Excavation for Underground Pump station
Brief Description
Path of Construction 42
46
Pipe Rack – Scaffold Underslung
Hanging Scaffold
Stairway Tower
The slug catcher buffers the incoming gas and liquid, from the wellheads, it
also separates the gas from the liquid.
Slug Catcher Construction Sequence Animation
ⓒ David H Moloney
Steel Circular Storage Tank – Construction ⓒ David H Moloney
Contents
Piping Spool Fabrication
Piping Spools are pre-fabricated from pipes and pipe fittings in fabrication shops to
reduce on site fabrication costs and provide better quality.
Pipe Spools examples
Spool Fabrication on site
Pipework
Spool Fabrication Steps
NDT
Cut Non Destructive
Testing
Bevel PWHT
Post Weld Heat
Treatment
Fit-up Blasting
Weld Painting
Welding Trials
Welding
Fit up Clamp
Spool Fabrication - Pipe Rolling & Cutting Table
Pipework
Spool Fabrication Spool Rolling & Welding
Pipework
Anyeke.com.my
Contents
Erect Flares / Columns & Vessels
Cranes Heavy Lift Animation
Tail
Crane
Trunnions
Main
Lift
Crane
HVAC Room
Heat, Ventilation, & Air Conditioning Chillers
Local
UPS Equipment
Battery Room
Room Room
Transformer Bays
Electrical Sub Station
Step 1 Set-out Grid Lines Step 2 Holding Down Bolts Step 3 Erect 1st Bay
ⓒ David H Moloney
Steel Building Single Storey
Structural Steel
ⓒ David H Moloney
Structural Steel Building Multi Storey
3D images to show Construction Sequence.
Step 1 Set-out Grid Lines Step 2 Holding Down Bolts Step 3 Erect 1st level use core for stability
Step 4 Complete 1st Level Step 5 Erect following Levels Step 6 Plumb & Align Structure
ⓒ David H Moloney
Roof Covering
Structural Steel
Brief Description
Sequence is
Fix bottom sheet
Fix Vapour barrier
Fix Top Hat section and clips
Fit Insulation
Fix top sheet
ⓒ David H Moloney
Roof Covering
Structural Steel
ⓒ David H Moloney
Roof Covering
Structural Steel
ⓒ David H Moloney
Roof Covering
Structural Steel
ⓒ David H Moloney
Contents
Onshore Gas Pipeline Construction Sequence
A typical sequence of activities is- surveying and setting out, preparing the land, stringing out the pipes along the
route, excavating the trench, welding and laying the pipes, backfilling the trench with the excavated soil, and
reinstating the land to its original condition.
.
Overview
Surveying & Setting Out
Clearing & Grading
Double Jointing i.e. welding 2 pipes together
Stringing out Pipes
Bend Pipes for changes in direction sideways and up & down
Welding Pipes into a string, Test Weld by X Ray.
Anti-corrosion Coat to Joints
Trenching i.e. excavate trench
Lowering pipe string into trench
Backfilling Trench
Reinstatement of Pipeline ROW (Right-of-Way)
Reinstatement of River Banks
Crossing - Horizontal Directional Drilling
Crossing - Thrust Boring
Crossing - River Pause Slides to Read
Hydrotest & Pigging
Tie-in i.e. connect to existing pipeline
Miscellaneous
Overview Pipeline Construction Animation
Brief Description
Brief Description
ⓒ David H Moloney
Contents
Road Construction
ⓒ David H Moloney
Miscellaneous
Fencing
Miscellaneous
Fencing
Miscellaneous
Fencing
Miscellaneous
Fencing
Contents
Setting out & Surveying
Setting out & Surveying
Contents
Emergency Phone Numbers & Response
Health, Safety & Environment
Dashboard is a single page, graphical representation of
HSE Monitoring & Reporting - Dashboard current HSE Issues and historical trends
Health, Safety & Environment
Health, Safety & Environment
Safety Precautions
Safety Training on Site
Miscellaneous
Exposed Existing Underground Utilities
ⓒ David H Moloney
Existing Underground Utilities & Overhead Cables - Safety Measures
Health, Safety & Environment
ⓒ David H Moloney
Health, Safety & Environment
Trench - Safety Measures
Trench - Safety Measures
Health, Safety & Environment
ⓒ David H Moloney
Site Safety Posters examples
Health, Safety & Environment
Air, Noise, Water & Soil Pollution
Environmentally Friendly Site
Health, Safety & Environment
Health, Safety & Environment
Water Pollution Prevention
Segregation of Waste
Health, Safety & Environment
Brief Description
Brief Description
Brief Description
ⓒ David H Moloney
Programme for Construction
Gantt Charts to plan and schedule projects
Programme using Timeline & 3D Images
Pump House
Chiller Plant
Primary Substation-
Piling
Chiller Plant-714
Pump House-
715
Primary Substation-711
Primary Substation-711
Primary Substation-711
Primary Substation-711
Chiller Plant-714
Pump House-
715
Primary Substation-711
Sample Only
Histogram Charts for Resources & Outputs
ⓒ David H Moloney
Plant & Equipment List & Worker’s Job Titles
ⓒ David H Moloney
Contents
Temporary Contractors Site Facilities
Brief Description
ⓒ David H Moloney
General Items Welfare Facilities
Toilets – Washing
ⓒ David H Moloney
General Items
Site Hoarding examples
ⓒ David H Moloney
General Items
Temporary Electricity Supply & Tower Lights
ⓒ David H Moloney
General Items
Wheel Wash Drive-through
ⓒ David H Moloney
General Items
Wheel Wash Drive-through
General Items
Weighbridge & Sheeting Access
ⓒ David H Moloney
General Items
Dust Suppression
ⓒ David H Moloney
General Items
Dewatering
Brief Description
ⓒ David H Moloney
General Items
Dewatering
ⓒ David H Moloney
Quarry & Aggregate Production
ⓒ David H Moloney
General Items
Quarry & Aggregate Production
Concrete Batching Plant David H Moloney
ⓒ David H Moloney
Concrete batching plant comprises - concrete mixer, control cabin, silos for cement and fly ash, aggregate bins
and conveyor belt system to feed the mixer. Also aggregate storage bays and water storage tanks.
The mixing is computer controlled and has a dynamic screen display, showing the process. Material storage
capacity to match two days concrete production
Concrete Batching Plant
Concrete
ⓒ David H Moloney
General Items
Concrete Batching Yard 3 Nr Mixers
Reinforcement Cutting & Bending Yard David H Moloney
Reinforcement in 12 m lengths. Delivery in 3 ton Bundles Reinforcement cut to length by Shearing Machine
Reinforcement Bent to Shape by Bending Machine Reinforcement that is cut and bent is Bundled for delivery to work site
ⓒ David H Moloney
Reinforcement Cutting & Bending
Concrete
ⓒ David H Moloney
Contents
Notes
Production by David H Moloney
ⓒ David H Moloney