SafeRack Catalog Industrial Loading Platforms Safety and Fall Protection Products

Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

Loading doesn’t have

to be this complicated

v1
Every product in
this catalog is built with
the strongest
material we know of:

OUR WORD
Because what we really build is trust.
We build trust by putting the people who use our products
first. We continually invest in and create technology that
allows us to better meet the needs of our customers, and
we never stop looking for ways to improve our products
and services. We are not looking for a medal; we just want
a partnership, and we want it for the long haul.

219 Safety Avenue Andrews South Carolina 29510


866.761.7225 phone 803.744.7223 fax

SAFERACK.COM
10

2 8
4

7 11
9
5

1 SAFELOK
GANGWAY LOCKING DEVICE 2 G4 GANGWAY
PRECISION BUILT 3 RAILCAR TRACK PAN
AND SPILL CONTAINMENT 4 MAXRACK
ELEVATING SAFETY CAGE 5 RAILROAD CONSTRUCTION
FULL DESIGN/INSTALLATION SERVICES

6 OPERATOR SHELTERS
AND GUARD HUTS 7 ERECTARACK
PRE-ENGINEERED PIPE RACKS 8 LOADING ARMS
TOP/BOTTOM LOADING APPLICATIONS 9 SPILL CONTAINMENT
IBC AND PORTABLE BERM 10 YELLOWGATE
SAFETY SWING GATES

SAFERACK.COM page 2
Leading
Integrator for
everything in
your loading
facility
12 16
13

14 19
18
11
15 17 20

11 TRANSLOADER
MOBILE PLATFORM 12 METAL HANDRAILS
AND CUSTOM PLATFORM 13 FACILITY LIGHTING
FOR PLATFORMS & GANGWAYS 14 ERECTASTEP
MODULAR ACCESS SYSTEM 15 ROLLASTEP
MOBILE WORK PLATFORM

16 WEATHER PROTECTION
LOADING SHEDS & CANOPIES 17 GROUNDING SYSTEM
FOR TRUCK AND RAILCAR 18 M3 MAUI
PORTABLE PLATFORM 19 BLENDING, METERING
AND LOADING SKID 20 BOLLARDS AND BUMPERS
HIGH-VISIBILITY SAFETY BOLLARDS

219 Safety Avenue, Andrews, SC 29510 / P 866.761.7225 / F 803.774.7233 / SAFERACK.COM


Have Saferack Construction Services
Install all of our
products To make your
project easier

Full Service
Design / Construct

Bulk loading
facility
design and
construction
experts

SafeRack’s capabilities range from full design and construct


of the entire project from start to finish to simple material
receiving or installation management.

Our Design / Construct Services Include:

Contract Review
Drawings and associated documents relating to
the contract prior to site arrival
Assessment
Undertaking a site risk assessment
Material Receiving
Off-loading and transport at site to ensure product
is without shipping damage or abnormalities
Installation Management
Supervised installations and coordination
Startup & Commissioning
On-site training for both users and maintenance
personnel

page 4
We are the leading project loading Integrator
Recent Project Profiles

LPG Fractionating Project Overview Project Details

Loading Facility Wyoming Fractionator


• 4200 linear ft of new rail construction
on customer owned spur
SafeRack Construction Services (SCS)
• Perform all grubbing of organic soils,
supplied and installed 4200’ of ladder track
excavating down 6’
on customer owned rail spur adjacent to
• Install compactible materials for sub-grade
Union Pacific right-of-way. An additional
• Install road base prior to rail installation
8 spot rail loading platform accompanied
• Install foundations, structural steel,
the rail install at the fractionating
and mechanical components
facility in Wyoming. The facility receives
• Design/Construct four process lines
feedstock via pipelines from nearby wells
including subterranean trunks (duct bank)
and refined products are loaded into
• Install LPG, Butane, #1 gasoline, and
railcars using SafeRack, LLC advanced diesel loading arms
platform and loading systems designed • Install vapor recovery hoses and API couplings
Client: Fractionator and manufactured by SafeRack, LLC. The • Install electrical system including duct banks
Location: Wyoming refinery is now capable of processing up to • Install instrumentation
Project: 8 Spot Railcar 50,000 barrels of raw materials per day into • Install owner supplied compressor and vessel
#1 Gasoline, Diesel, Butane and Iso-Butane • Install owner supplied Knockout tank, Yokogawa
Services: Full Service - Design/Construct
that supply many of the surrounding flare, and propane fuel line
Product: LPG, Butane, #1 Gasoline, Iso-Butane
states. • Install track mobile building and
Status: Completed August 2013
instrument air supply building
Safety: Exemplary - Zero Recordables
• Install track pans, drainage system, and
geo-membrane lined spill containment pond
• Commissioning and start up assistance

USD Terminals Project Overview Project Details

Crude Loadout As one of the primary railcar loading


points, Hardisty is one of the major
• Erect 1998’ SafeRack tower and
platform system
Facility crude oil hubs in North America and a
major origination point of pipelines that
• Construct 1998’ steel building on
caisson foundation
export to the United States. SafeRack • Install control building
Construction Services (SCS) was asked to • Construct utility/mechanical building
supply and construct a SafeRack crude • Construct operator/mechanical building
oil loadout terminal spanning nearly half • Install crossover access from
a mile. The USD Hardisty terminal can MCC to loadout

load up to two 120-railcar unit trains per • Install 2 operator shelters

day and consists of a fixed loading rack • Install 31 OPW boom supported
loading arms
with 62 railcar loading positions enclosed,
• Install supply and vapor recovery hoses
separate control, operator and mechanical
buildings, as well as a unit train staging
area and loop tracks capable of holding
Client: USD Terminals multiple unit trains simultaneously.
Location: Hardisty, Alberta, Canada SCS also supplied and installed boom-
supported loading arms with supply and
Project: 62 Spot Railcar
vapor management systems.
Services: Full Service - Design/Construct
Product: Crude Oil
Status: Completed May 2014
Safety: Exemplary - Zero Recordables

page 5
Please visit SAFERACK.COM for thousands of customer reviews

Black Wax Project Overview Project Details

Crude Oil When it came time to upgrade and modernize • Demolish and remove existing platform system

Loading Facility
this 1940’s rail loading facility, SafeRack • Install epoxy anchor system in existing
Construction Services (SCS) was the only foundations
installer trusted to meet deadlines and exceed • Install platform, process supports, I&E supports
expectations. SCS provided a variety of SafeRack • Install tower support and 420 linear foot
products and services for this project including of pipe bridge

cost analysis of replacing existing versus • Install loading arms, vent hoses, and
API couplings
retrofit. SCS also performed all new equipment
• Install owner-supplied eyewash/safety showers
design/engineering, as well as demolition
• Install utility stations
plan for removal of existing original loading
• Procure, fabricate, install process piping
platform system. SafeRack manufactured all the
with metering/ valves/instrumentation
platform system and safe access equipment in
• Install access platform system to satellite MCC
their state-of-the-art facility located in South
• Commissioning and startup support
Carolina. All shipping logistics and on-site
Client: Refinery receiving/staging was accomplished using SCS
Location: Salt Lake City, Utah on-site project management. Installation of the
Project: 12 Spot Railcar new rail loading platform, pipe bridge, process
Services: Full Service - Design/Build piping, I&E, and ergonomic/environmentally
friendly loading arms. With the ability to move
Product: Crude Oil
feedstock by rail, the customer has experienced
Status: Completed January 2015
an increase in refined product output at many
Safety: Exemplary - Zero Recordables
out-of-state facilities previously unable to gather
enough raw materials.

Louisiana Project Overview Project Details

Ammonia SafeRack was tapped to supply and install all


anhydrous ammonia loading platform and
• Site preparation & grading

Loading Facility
• Install foundations
safety equipment as part of their $175 million • Structural steel installation
investment in upgrades and infrastructure • Design and construct pipe bridge
to increase production capacity to 800,000 • Canopy system installation
metric tons at an 800 acre, Louisiana • Design and construct mechanical supply
anhydrous ammonia manufacturing complex • Design and construct return system
located on the Mississippi River, Jefferson • Design and construct metering skids
Parish, just outside New Orleans, LA. • Install ammonia prover
SafeRack assisted with design, manufacturing
and specifications for all loading towers,
platforms, pipe bridges and canopy systems.
As well as designing and procuring anhydrous
ammonia metering skids and installing the
anhydrous ammonia proving tower.
Client: Ammonia Supplier
Location: Louisiana
Project: 4 Spot Railcar
Services: Full Service - Design/Construct
Product: Ammonia
Status: Completed June 2015
Safety: Exemplary - Zero Recordables

SAFERACK / ORANGE. SAFETY HAS A NEW COLOR.


SAFETY NEVER TAKES A BREAK

SafeRack Cement and


Sand Loading Systems
For safe, efficient loading of trucks and railcars

page 7
3X5 SAFETY CAGE PLATFORM SYSTEM

TRACKING GANGWAY, ANTWERP, BELGIUM

GANGWAY LOCKING SYSTEM OFFSET SAFETY CAGE

TRACK-MOUNTED GANGWAY SYSTEM


SafeRack Liquid
Loading Systems
For all truck and railcar
loading applications

RAILCAR LIQUID LOADING SOLUTION

BLENDING, METERING AND LOADING SKIDS

page 9
Optional multiple
hatch access

Manual lift control


safety feature
DUAL MAXRACK TRUCK LOADING

AVAILABLE IN TWO POWER OPTIONS


Available
Pneumatic Air Drive multiple Eliminates Patent Pending
Multiple for Both
power Leaky Design safety cage truck and
Electric Drive, Single and 3-Phase options Hydraulics options Railcar
(Explosion and Non-Explosion Proof)

MAXRACK RAILCAR LOADING SOLUTION


Railcar earth berm crossover

5 Main
Components

Universal Platforms Platform Handrails Ladder Units Tower Supports Safety Stairs
Raised work platform for easy Safely crossover conveyor systems, with the ability to reconfigure your
maintenance access ErectaStep modular system should you change, add or remove equipment

5 Main Components • Quick bolt-together assembly

Unlimited for easy installation


• Real time design and estimation
Configurations • Pre-engineered components
Create raised walkways, work platforms • Fully engineered and OSHA
and more without costly engineering compliant with current regulations Let Us Configure
and fabrication. • In-stock and ready-to-ship! Your Solution Today

Customized Industrial Stairs and


Work Platforms for ANY Application

page 12
MP SERIES

• Access when and where you need it


Designed for Work, Built for Safety
• User friendly – easy to roll and steer
Mobile Work • In-stock and ready-to-ship

Platforms and Stairs • Easily customized


• Extremely versatile

MP SERIES
TR SERIES C SERIES Mobile Work Platform

Flatbed fall protection


Configurable handrails
Highly mobile

TR SERIES
Tilt and Roll
Work Platform
Ample room to work
Built for safety

G SERIES
Mobile Self Leveling
Stair Work Platform
G SERIES
Adjustable height
Easily mobile
Large work area

C SERIES
Mobile Cantilever
Work Platform
Stability meets mobility
Safe, spacious work area
Optional safety cage

All RollaStep products are Easily Customized


page 13
• Universal mount for easy
Fall Protection installation - no additional

The Most Adjustable parts to order


• Helps meet OSHA regulations
Swing Gate Available • Built to last indoors and out
Durable, safe and adjustable • In-stock and ready-to-ship

UNIVERSAL MOUNT
Mounts to walls, round and square
Is this what tube or angle iron, with a single mount.
your current
safety solution
looks like?

PATENT PENDING

Malbec Tensioner
No spring to fail.

16” [406mm]
36” [914mm]

The Malbec Tensioner eliminates the need for


a swing gate’s most common failure point, the
EASILY spring. The patent pending system provides field
ADJUSTABLE
IN THE FIELD
adjustable tension and maintenance-free closure,
KEEP ALL YOUR
OPENINGS SAFE every time.
– Order a pallet of 10 today

MOUNTING OPTIONS

YellowGate can swing either in or out by simply


relocating two bolts.

Perpendicular

Parallel

The MOST VERSATILE YELLOWGATE SIMPLICITY IN


TRAFFIC BARRICADES and A SAFETY RAILING SYSTEM
CONTROL GATES AVAILABLE
YellowGate protection, Temporary, non-penetrating,
only BIGGER modular roof top railing system
Don’t reinvent the wheel
Pre-Engineered

T-Frame
Pipe rack systems

2 Tier
Pipe racks faster and easier than ever before

U-Frame

3 Tier
ErectaRack eliminates the long engineering
and fabrication process typically involved in
pipe rack design and construction, often taking
several weeks, if not months. ErectaRack’s
modular design is a pre-engineered precision
manufactured system using the latest
technology. This enables pipe rack projects to
be completed fast with efficient construction in a
fraction of the time.

Choose from four ErectaRack modular,


pre-engineered pipe rack models.

THE worlds first The LOGIC controller has been developed for The SmartTech ImpactLog monitor is a
single point top loading operations, providing highly durable impact recorder which can be
Total Vehicle multiple truck and rail car grounding options, configured to monitor critical parameters,

safety Monitoring with enhanced features such as, monitoring


potential overfills, adjusting loading arm
providing an alert when an impact to SafeRack
gangway equipment may have compromised

SYSTEM position, enabling dead-man control and can


log external environmental conditions such as
its integrity, performance, and/or safe
operation. Our monitor identifies incidents after
temperature and humidity, all in one enclosure. installation and before any serious malfunction
occurs. SmartTech’s ImpactLog delivers an
alert that the gangway has encountered an
impact which might affect its performance or
Secure safety, enabling immediate inspection and
Grounding remediation by SafeRack service personnel.

Smart
We utilize smart technologies to bring
Overfill intelligence to the loading terminal.
Protection
Dependable
Our products are rigorously tested and con-
structed with the highest quality materials.
Robust
Analytics Innovative
We apply blue-sky thinking to today’s appli-
cations and develop tomorrow’s products.

Load Arm Made in the USA


Position We are proud to say that all of our products
Monitoring are developed and manufactured in the USA.

page 15
219 Safety Avenue, Andrews, SC 29510 / P 866.761.7225 / F 803.774.7233 / SAFERACK.COM
219 Safety Avenue // Andrews // SC // 29510
P 866.761.7225 // F 803.774.7233 // SAFERACK.COM
© 2017 SixAxis LLC

You might also like