This document is a checklist for permission to commence brick work on a construction project. It outlines 13 points that must be checked, including cleaning the work area, proper placement of openings, and availability of necessary materials. The contractor, technical assistant, and architect engineer must all sign off to grant final permission to proceed with the brick work.

Uploaded by

Anonymous Of0C4d
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
120 views2 pages

Brick Work CP

This document is a checklist for permission to commence brick work on a construction project. It outlines 13 points that must be checked, including cleaning the work area, proper placement of openings, and availability of necessary materials. The contractor, technical assistant, and architect engineer must all sign off to grant final permission to proceed with the brick work.

Uploaded by

Anonymous Of0C4d
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Name of the Work:

date:
BRICK WORK COMMENCEMENT PERMISSION
FLOOR Drawing No.

Location
Sr. No. Check points

1 Entire floor cleaned including chipping out morter along the line of masonary
Yes / No
2 Hacking to RCC coloumns & beam bottom where masonary is butting
Yes / No
3 Entire floor area 1st layer of brick / block masonary laid
Yes / No
4 Room dimension as per drawing
Yes / No
if not descrepancies ( size as per drawing/actual)------------------

5 Brick,sand,cement test results received & sand is screened


Yes / No
6 Morter tray & (double scaffolding)
Yes / No
7 As per specification measurment box (farma) available
Yes / No
8 Half bag mixer available for morter mixing
Yes / No
9 Openings for door, window provided properly
Yes / No
Door frames & windows( steel ) are available with necessary hold fast & are approved
10 by engineer incharge Yes / No
11 Wetting arrangment of bricks before use
Yes / No
12 Curing arrangment made
Yes / No
13 Following points are brought to the notice of contractors engineer
Yes / No
a) Brick size
Yes / No
b) Mix proporation
Yes / No
c) Patli arrangment & its Location
Yes / No
d) construction Ht. per day
Yes / No
e) Thickness of joint & racking
Yes / No
f) Lintel & Sill level
Yes / No
g) Plumb side of masonary
Yes / No
h) For verticality & right angle plumb bob & masons square must
Yes / No
i) No gap between beam bottom & brick work
Yes / No
j) Masonary as per elevation
Yes / No
k) Location , position of door/window & other openings
Yes / No
14 permission granted to proceed with work
Yes / No
if not reason to be specified -----------------------------------------

Sign of Contractor Sign of T.A. Sign of A.E.

You might also like