Nabha Power
Nabha Power
Nabha Power
• Project developed by Larsen & Toubro under Case-2 Tariff based bidding
2
• Fuel Supply Agreement (FSA) for 5.55 MTPA with South Eastern Coalfields Limited
4
3
Nabha Power Limited
Infrastructure for Ash Utilization
88%
1.20 100%
100% 100% 99% 100%
100% 100%
100%
1.00
100%
0.80
100%
0.60
0.40
0.20
0.00
Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18
Fly Ash Generated (LMT) 0.70 1.12 1.12 1.10 1.20 1.00 0.85 1.05 1.06 1.15 1.09
Fly ash disposed (LMT) 0.70 1.12 1.12 1.09 1.07 1.00 0.85 1.05 1.06 1.15 1.09
Nabha Power Limited
Ash Utilization Performance
16
101% 115%
Particulars 2015-16 2016-17 2017-18 15.1 15.11
14.96
14
84%
13.1
12 12.63
6
Bottom Ash Utilization 7% 105% 229%
4
FY 2016-17 FY 2017-18
Road Work
18%
Road work
25%
Others
[PERCENTA
GE]
Brick Plants Cement Others
2% 71% 9% Cement
64%
Brick Plants
2%
• Plant on the top of merit list of Punjab & operates continuously, hence makes reliable source of
1 ash for customers
• Quality of fly ash - very low Unburnt Carbon percentage & higher Blaine
2
• Five spouts in three silos & weighbridges under silos to reduce turnaround time of vehicles
5
• Close co-ordination with customers, transporters & internal O&M team for smooth utilization
6
ACC Barmana
Himachal
Pradesh
Ultratech Bagheri
Ambuja Nalagarh
Asian Concretes
Ambuja Ropar
Punjab
NPLRajpura
Asian Fine Cement,
Rajpura Uttrakhand
Ultratech Bathinda
Everest Industries(Roorkee)
Ultratech
Ambuja (Roorkee)
Ultratech Panipat
Rajasthan
Haryana
Uttar Pradesh
Best Power Plant by Power Magazine North America “Honor Mention” in Hear Rate Category, Peabody Energy, USA