Generator: P16C / BBR84, Bandar Bukit Raja, Klang, Selangor. 4. Generator

The document identifies hazards, assesses risks, and determines control measures for work related to a generator at a construction project. Four main hazards are identified: falling objects causing injury; noise exposure impacting hearing; chemical exposure like carbon monoxide poisoning; and lightning exposure potentially causing serious injury. The risk level of each hazard is determined based on the probability and severity of potential consequences. Current and recommended control measures are provided to reduce risks, including proper work platforms, PPE, ventilation, training, and restricting work during storms. Personnel responsibilities for ensuring the control measures are also assigned.

Uploaded by

Rafee Pie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
1K views

Generator: P16C / BBR84, Bandar Bukit Raja, Klang, Selangor. 4. Generator

The document identifies hazards, assesses risks, and determines control measures for work related to a generator at a construction project. Four main hazards are identified: falling objects causing injury; noise exposure impacting hearing; chemical exposure like carbon monoxide poisoning; and lightning exposure potentially causing serious injury. The risk level of each hazard is determined based on the probability and severity of potential consequences. Current and recommended control measures are provided to reduce risks, including proper work platforms, PPE, ventilation, training, and restricting work during storms. Personnel responsibilities for ensuring the control measures are also assigned.

Uploaded by

Rafee Pie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.

HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL


Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
P16C / BBR84, Bandar Bukit Raja, 4. Generator
Klang, Selangor. Date: Date:

4. Generator
HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

(4) Provide proper working platform for workers.


Unsecure objects Serious injury / fatality - Provide safety access to work area.
2 5 10 Project Manager
- Falling objects -Damage to property - Barricade / cordon the activity area to warn public.
(6) To provide appropriate PPE. Site Manager
Site Agent
Site Engineer
-Minor injury Site Supervisor
(5) Work carry out by skill workers.
Noise exposure (long term can impair 2 3 6 (6) To provide appropriate PPE. SHO / SSS
workers hearing)
EO
Scaffolder
1 Generator
-Minor injury (4) Good / open ventilation at working area. Work Leader
Chemical exposure
(Poisoned) 1 3 3 (5) Take a 2-3 minutes rest after every 2 ( two ) hours. Machinery opr/
- carbon monoxide (6) To provide appropriate PPE.
Driver
Signalman
(5) Training & Briefing.
Banksman
Lightning exposure -Serious injury / fatality 2 5 10 (5) Stop work during thunderstorm.
(6) To provide appropriate PPE. Rigger
Welder
(5) Training & Briefing. Workers
Rain / storm / wind exposure -Minor injury 2 2 4 (5) Stop work during thunderstorm.
(6) To provide appropriate PPE.

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Generator (Cont’d)
HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

--Heat stress (4) Good / open ventilation at working area. Project Manager
- To provide shelter/ rest area & drinking facilities
Hot weather (low productivity) 2 3 6 (5) Take a 2-3 minutes rest after every 2 ( two ) hours. Site Manager
- Skin burn (6) To provide appropriate PPE. Site Agent
Site Engineer
-Minor injury Site Supervisor
Dust exposure 2 3 6 (6) To provide appropriate PPE.
(lung-impaction)
SHO / SSS
(4) Electrical wire shall hang-up and not obstruct EO
walkway. Scaffolder
1 Generator Electrical wiring exposure -Serious injury 2 4 8 (5) To ensure genset in good condition before used.
- Machine inspection before work commences. Work Leader
(6) To provide appropriate PPE. Machinery opr/
Driver
(5) Working area must be free from any flammable
material. Signalman
- Work to be done by experience Workers or trained by Banksman
-Minor injury experience supervisor.
Fire exposure 2 3 6 Rigger
-Damage to property - To ensure machine in good condition before used.
- Machine inspection before work commences. Welder
(6) To provide appropriate PPE.
- To provide fire extinguisher at activity area Workers

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)