Purpose : This procedure is used as work instruction for Boiler operator , Desk Engineer ,
Shift Incharge.
Scope : This procedure explains the lineup , startup , shutdown , isolation of PA Fans
Procedure:
LINE UP PROCEDURE
1. No permit is pending.
2. All manholes in primary air duct are closed.
3. DMCW booster pump is in service.
4. Lineup cooling water to lube oil cooler. ( DMCW supply, return valves are open )
5. Check for adequate oil level in lube oil tank.
6. All instruments are lineup.
7. Instrument air to blade pitch operating power cylinder is open.
8. Fan discharge damper is closed.
9. Breaker is in service and in Remote.
10. Motor protection relay is healthy.
11. Both lube oil pumps modules are ON and in remote.
START UP
SHUTDOWN
Page 1 of 2
Desk Engineer Deptt.Head Head – Operation & Maintenance
Prepared By Reviewed by Approved By
HINDALCO MAHAN, 6X150 MW
ISOLATION PROCEDURE
RECORDS : Nil
Page 2 of 2
Desk Engineer Deptt.Head Head – Operation & Maintenance
Prepared By Reviewed by Approved By