0% found this document useful (0 votes)
154 views10 pages

LSMW For Uploading BOM: Purpose

This document discusses using LSMW to upload a bill of materials using the direct input method. It involves 13 steps: 1) maintaining object attributes, 2) maintaining source structures, 3) maintaining source fields, 4) maintaining structure relations, 5) maintaining field mapping and conversion rules, 6) preparing an Excel file with header and item data, 7) specifying the files, 8) assigning the files, 9) reading the data, 10) displaying the read data, 11) converting the data, 12) displaying the converted data, and 13) creating a batch input session. The process uploads the BOM for a material.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
154 views10 pages

LSMW For Uploading BOM: Purpose

This document discusses using LSMW to upload a bill of materials using the direct input method. It involves 13 steps: 1) maintaining object attributes, 2) maintaining source structures, 3) maintaining source fields, 4) maintaining structure relations, 5) maintaining field mapping and conversion rules, 6) preparing an Excel file with header and item data, 7) specifying the files, 8) assigning the files, 9) reading the data, 10) displaying the read data, 11) converting the data, 12) displaying the converted data, and 13) creating a batch input session. The process uploads the BOM for a material.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

LSMW for uploading BOM

Purpose
This document will briefly discuss LSMW for uploading Bill of Material using Direct Input Method.

Prepare LSMW

Project : As name describes, I mention the name of the project.

Subproject : I usually maintain the module for which we are preparing.


Object : It is the business object, in this case I mention as BOM

Here I mention LSMW as

One advantage of this kind of naming is, we can see all objects created under one project - under one
subproject.

Generated by Jive on 2014-12-18+01:00


1
LSMW for uploading BOM

Procedure

Step 1 : Maintain Object Attributes

Generated by Jive on 2014-12-18+01:00


2
LSMW for uploading BOM

Step 2 : Maintain Source Structures

Create two structures, second structure as lower level.

Generated by Jive on 2014-12-18+01:00


3
LSMW for uploading BOM

Step 3 : Maintain Source Fields

Here we maintain two structures - one for header level data and second one for item data. Header Material
number (MATNR) is the common field connecting these two structures.

Generated by Jive on 2014-12-18+01:00


4
LSMW for uploading BOM

Step 4 : Maintain Structure Relations

Generated by Jive on 2014-12-18+01:00


5
LSMW for uploading BOM

Step 5 : Maintain Field Mapping and Conversion Rules


Maintain fields for both the two structures.

Step 6 : Prepare Excel File.


Prepare both header and item file separately.

Generated by Jive on 2014-12-18+01:00


6
LSMW for uploading BOM

Step 7 : Specify Files


Item file should be created under the Header file.

Generated by Jive on 2014-12-18+01:00


7
LSMW for uploading BOM

Logical File path must be created in transaction FILE.

Step 8: Assign Files

Step 9 : Read Data

Generated by Jive on 2014-12-18+01:00


8
LSMW for uploading BOM

Step 10 : Display Read Data


Step 11 : Convert Data
Step 12 : Display Converted Data
Step 13 : Create Batch Input Session

Click Display Errors Only

Following screen appears .

Generated by Jive on 2014-12-18+01:00


9
LSMW for uploading BOM

Now the BOM is created for material.

*&-------------------------------------------------------------------------------------------------------------------------------------------------------------------
&*

Generated by Jive on 2014-12-18+01:00


10

You might also like