Laporan Kegiatan Harian: (Daily Activity)

The document is a daily activity report for a road and bridge improvement program in Penajam, Indonesia. It details the work conducted on a road improvement project, including equipment and materials used. Workers leveled the road base and installed drainage pipes from 7 AM to 1 PM under clear skies, and worked overtime from 1-5 PM due to rain. The report was reviewed by the site supervisor and engineering consultant.

Uploaded by

icalgitu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
780 views4 pages

Laporan Kegiatan Harian: (Daily Activity)

The document is a daily activity report for a road and bridge improvement program in Penajam, Indonesia. It details the work conducted on a road improvement project, including equipment and materials used. Workers leveled the road base and installed drainage pipes from 7 AM to 1 PM under clear skies, and worked overtime from 1-5 PM due to rain. The report was reviewed by the site supervisor and engineering consultant.

Uploaded by

icalgitu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

LAPORAN KEGIATAN HARIAN

(Daily Activity)

PROGRAM : PENINGKATAN JALAN DAN JEMBATAN

PEKERJAAN : PENINGKATAN JALAN MELON - GIRIPURWA (BANKEU-2017) Kontraktor Pel

LOKASI : KECAMATAN PENAJAM Konsultan Sup

NO. KONTRAK : 625/394/DPU-PR/BM/2017

TGL KONTRAK : 18 Juli 2017

NILAI KONTRAK : ###

I. PEKERJAAN YANG DILAKSANAKAN HARI INI :

NO JENIS PEKERJAAN SATUAN

1 M3

II. PERALATAN III. TENAGA K

NO NAMA PERALATAN SAT. JUMLAH NO

1 Rool Meter Bh 1 1
2 Parang Bh 1 2
3 Gerobak Bh 3 3
4 Cangkul Bh 4 4
5 Sekop Bh 3 5
6 Palu Bh 2 6
7 Dump Truck Bh 1 7
8 Pick Up Bh 8
9 Alat Berat Unit 1 9
10 Alat bantu lainnya Set 10
IV. MATERIAL YANG DIGUNAKAN V. KONDISI CU

NO. JENIS MATERIAL SAT. JUMLAH JAM KER

1 BATU GUNUNG M3 07.°° - 1


2 PORTLAND CEMENT Kg 13.°° - 1
3 PASIR M3 Jam Lem
4 PIPA M'
5 COR BETON M3 -
6 BESI Kg -
7 KAYU GALAM M'

UNSUR PROYEK NAMA PARAF

DISETUJUI OLEH
PENGAWAS LAPANGAN
DPU-PR KAB. PENAJAM

DIPERIKSA OLEH,
KONSULTAN SUPERVISI
CV. NURMULIA

DIBUAT OLEH
KONTRAKTOR PELAKSANA
CV. WIDYA TAMA INDAH
KEGIATAN HARIAN
aily Activity)

Kontraktor Pelaksana :

Konsultan Supervisi :

VOLUME
KET.
S/D S/D
HARI INI
KEMARIN HARI INI

III. TENAGA KERJA

JUMLAH

PENGAWAS LAPANGAN
SITE ENGINEER 2 Org
INSPECTOR
SITE MANAGER 1 Org
PELAKSANA LAPANGAN 1 Org
MANDOR
TUKANG 1 Org
PEKERJA 1 Org
SOPIR 1 Org
OPERATOR 2 Org
V. KONDISI CUACA
CUACA
JAM KERJA
CERAH MENDUNG HUJAN
07.°° - 12.°°
13.°° - 17.°° √
Jam Lembur √
HARI/TANGGAL PELAKSANAAN