Guidelines For B.Tech Project Work
Guidelines For B.Tech Project Work
2. Each group should keep a project diary which will be a record of progress in the
work. The guide may give instructions regarding the work in the diary itself.
Students should obtain the signature of the guide in the diary every week during
project period. The project diary will be evaluated at the time of final
presentation.
3. Each project group should submit a project proposal comprising the following
information.
• Project title
• List of students and the assigned roles of each student
• Objective of the project
• Expected final outcome
• Facilities required
• Expected expenditure
• Project schedule in the specified format (example given below)
5. Prepare for a mid-term presentation and submission of interim report by the end
of S7.
HOD