Tariff Schedule For2017-18
Tariff Schedule For2017-18
Tariff Schedule For2017-18
Tariff Order
For
GENERAL
1. The tariff figures indicated in this tariff schedule are the tariff rates payable by the consumers
of Distribution Licensees viz. DGVCL, MGVCL, PGVCL and UGVCL.
2. These tariffs are exclusive of Electricity Duty, tax on sale of electricity, taxes and other charges
levied by the Government or other competent authorities from time to time which are payable
by the consumers, in addition to the charges levied as per the tariff.
3. All these tariffs for power supply are applicable to only one point of supply.
4. The charges specified are on monthly basis. Distribution Licensee may decide the period of
billing and adjust the tariff rate accordingly.
5. Except in cases where the supply is used for purposes for which a lower tariff is provided in
the tariff schedule, the power supplied to any consumer shall be utilized only for the purpose
for which supply is taken and as provided for in the tariff.
6. Meter charges shall be applicable as
Expenditure incurred in providing supply and other Miscellaneous Charges) Regulations,
2005 as in force from time to time.
7. rred in
providing supply and other miscellaneous charges) Regulations will continue to apply.
8. Conversion of Ratings of electrical appliances and equipments from kilowatt to B.H.P. or vice
versa will be done, when necessary, at the rate of 0.746 kilowatt equal to 1 B.H.P.
9. The billing of fixed charges based on contracted load or maximum demand shall be done in
multiples of 0.5 (one half) Horse Power or kilo watt (HP or kW) as the case may be. The
fraction of less than 0.5 shall be rounded off to next 0.5. The billing of energy charges will be
done on complete one kilo-watt-hour (kWh).
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
10. The Connected Load for the purpose of billing will be taken as the maximum load connected
during the billing period.
11. The Fixed charges, minimum charges, demand charges, meter rent and the slabs of
consumption of energy for energy charges mentioned shall not be subject to any adjustment
on account of existence of any broken period within billing period arising from consumer
supply being connected or disconnected any time within the duration of billing period for any
reason.
12. Prompt payment discount on the total bill excluding all types of levies, duties or taxes levied
by the Government or any other competent authorities and meter rent but including fixed
charges, energy charges and minimum charge may be allowed at the 1% rate for all tariff
categories provided that the payment is made within 7 days of presentation of bill and that no
previous amount is outstanding as on the date of the bill.
13. Contract Demand shall mean the maximum kW / kVA for the supply of which licensee
undertakes to provide facilities to the consumer from time to time.
14. Fuel Cost and Power Purchase Adjustment Charges shall be applicable in accordance with
the Formula approved by the Gujarat Electricity Regulatory Commission from time to time.
15. Payment of penal charges for usage in excess of contract demand / load for any billing period
does not entitle the consumer to draw in excess of contract demand / load as a matter of right.
16. The payment of power factor penalty does not exempt the consumer from taking steps to
improve the power factor to the levels specified in the Regulations notified under the Electricity
Act, 2003 and licensee shall be entitled to take any other action deemed necessary and
authorized under the Act.
17. Delayed payment charges for all consumers:
No delayed payment charges shall be levied if the bill is paid within ten days from the date
of billing (excluding date of billing).
Delayed payment charges will be levied at the rate of 15% per annum in case of all
consumers except Agricultural category for the period from the due date till the date of
payment if the bill is paid after due date. Delayed payment charges will be levied at the
rate of 12% per annum for the consumer governed under Rate AG from the due date till
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
PART - I
SCHEDULE OF TARIFF FOR SUPPLY OF ELECTRICITY
AT LOW AND MEDIUM VOLTAGE
1. RATE: RGP
This tariff is applicable to all services in the residential premises which are not covered under
PLUS
1.2 ENERGY CHARGES: FOR THE TOTAL MONTHLY CONSUMPTION:
(OTHER THAN BPL CONSUMERS)
(a) First 50 units 305 Paise per Unit
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
**The consumer who wants to avail the benefit of the above tariff has to produce a copy of the
Card issued by the authority concerned at the sub-division office of the Distribution Licensee. The
concessional tariff is only for 30 units per month.
This tariff is applicable to all services for residential premises located in areas within Gram
Panchayat as defined in the Gujarat Panchayats Act.
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
PLUS
2.2 ENERGY CHARGES: FOR THE TOTAL MONTHLY CONSUMPTION:
**The consumer who wants to avail the benefit of the above tariff has to produce a copy of the
Card issued by the authority concerned at the sub-division office of the Distribution Licensee. The
concessional tariff is only for 30 units per month.
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
Note: If the part of the residential premises is used for non-residential (commercial) purposes by
3. RATE: GLP
This tariff is applicable to the educational institutes and other institutions registered with the
Charity Commissioner and research and development laboratories.
4. RATE: NON-RGP
This tariff is applicable to the services for the premises those are not covered in any other tariff
categories and having aggregate load up to and including 40 kW.
PLUS
4.2 ENERGY CHARGES:
(b) For installation having contracted load exceeding 10 kW: for entire
465 Paise per Unit
consumption during the month
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
amount of short-fall payable towards the annual minimum bill as specified under sub-
clause (c) above.
5. RATE: LTMD
This tariff is applicable to the services for the premises those are not covered in any other tariff
categories and having aggregate load above 40 kW and up to 100 kW.
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
(i) For first 40 kW of billing demand Rs. 90/- per kW per month
(a) (ii) Next 20 kW of billing demand Rs. 130/- per kW per month
PLUS
5.2 ENERGY CHARGES:
For the entire consumption during the month 460 Paise per Unit
PLUS
For all the reactive units (KVARH) drawn during the month 10 paise per KVARH
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
This tariff is applicable for aggregate load up to 40 kW and using electricity exclusively during
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
night hours from 10:00 PM to 06:00 AM next day. (The supply hours shall be regulated through
time switch to be provided by the consumer at his cost.)
PLUS
6.2 ENERGY CHARGES:
For entire consumption during the month 260 Paise per Unit
NOTE:
1. 15% of the contracted demand can be availed beyond the night hours prescribed as per para
6 above.
2. 10% of total units consumed during the billing period can be availed beyond the night hours
prescribed as per para 6 above.
3. In case the consumer failed to observe condition no. 1 above during any of the billing month,
then demand charge during the relevant billing month shall be billed as per Non-RGP category
demand charge rates given in para 4.1 of this schedule.
4. In case the consumer failed to observe condition no. 2 above during any of the billing month,
then entire energy consumption during the relevant billing month shall be billed as per Non-
RGP category energy charge rates given in para 4.2 of this schedule.
5. In case the consumer failed to observe above condition no. 1 and 2 both during any of the
billing month, then demand charge and entire energy consumption during the relevant billing
month shall be billed as per Non-RGP category demand charge and energy charge rates given
in para 4.1 and 4.2 respectively, of this schedule.
6. This tariff shall be applicable if the consumer so opts to be charged in place of Non-RGP tariff
by using electricity exclusively during night hours as above.
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
7. The option can be exercised to switch over from Non-RGP tariff to Non-RGP Night tariff and
This tariff is applicable for aggregate load above 40 kW and using electricity exclusively during
night hours from 10.00 PM to 06.00 AM next day. (The supply hours shall be regulated through
time switch to be provided by the consumer at his cost.)
PLUS
7.2 ENERGY CHARGES:
For entire consumption during the month 260 Paise per Unit
PLUS
For all reactive units (KVARH) drawn during the month 10 Paise per KVARH
NOTE:
1. 15% of the contracted demand can be availed beyond the night hours prescribed as per para
7 above.
2. 10% of total units consumed during the billing period can be availed beyond the night hours
prescribed as per para 7 above.
3. In case the consumer failed to observe condition no. 1 above during any of the billing month,
then demand charge during the relevant billing month shall be billed as per LTMD category
demand charge rates given in para 5.1 of this schedule.
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
4. In case the consumer failed to observe condition no. 2 above during any of the billing month,
then entire energy consumption during the relevant billing month shall be billed as per LTMD
category energy charge rates given in para 5.2 of this schedule.
5. In case the consumer failed to observe above condition no. 1 and 2 both during any of the
billing month, then demand charge and entire energy consumption during the relevant billing
month shall be billed as per LTMD category demand charge and energy charge rates given
in para 5.1 and 5.2 respectively, of this schedule.
6. This tariff shall be applicable if the consumer so opts to be charged in place of LTMD tariff by
using electricity exclusively during night hours as above.
7. The option can be exercised to switch over from LTMD tariff to LTMD Night tariff and vice
Applicable for supply of electricity to Low Tension Agricultural consumers contracting load up to
125 HP requiring continuous (twenty-four hours) power supply for lifting water from surface water
sources such as canal, river, & dam and supplying water directly to the fields of farmers for
agricultural irrigation only.
PLUS
Energy charges
(b) 180 Paise per Unit
For entire consumption during the month
9. RATE: WWSP
This tariff shall be applicable to services used for water works and sewerage pumping purposes.
9.1 Type I Water works and sewerage pumps operated by other than local authority:
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
PLUS
9.2 Type II Water works and sewerage pumps operated by local authority such as Municipal
Corporation, Gujarat Water Supply & Sewerage Board located outside Gram Panchayat
Area will also attract this tariff:
PLUS
9.3 Type III Water works and sewerage pumps operated by Municipalities / Nagarpalikas
and Gram Panchayats or Gujarat Water Supply & Sewerage Board for its installations
located in Gram Panchayats:
Applicable to all the water works consumers having connected load of 50 HP and above for the
energy consumption during the Off-Peak Load Hours of the Day.
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
10. RATE: AG
This tariff is applicable to services used for irrigation purposes only excluding installations covered
under LTP- Lift Irrigation category.
ALTERNATIVELY
10.1.2 METERED TARIFF:
Energy Charges: For entire consumption 60 Paise per Unit per month
Energy Charges: For entire consumption 80 Paise per Unit per month
NOTE: The consumers under Tatkal Scheme shall be eligible for normal metered tariff as above,
on completion of five years period from the date of commencement of supply.
10.2 No machinery other than pump water for irrigation (and a single bulb or CFL up to 40
watts) will be permitted under this tariff. Any other machinery connected in the installation
governed under this tariff shall be charged separately at appropriate tariff for which
consumers shall have to take separate connection.
10.3 Agricultural consumers who desire to supply water to brick manufacturing units shall have
to pay Rs. 100/HP per annum subject to minimum of Rs. 2000/- per year for each brick
Mfg. Unit to which water is supplied in addition to existing rate of HP based / metered
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
agricultural tariff.
10.4 Such Agricultural consumers shall have to pay the above charges for a full financial year
irrespective of whether they supply water to the brick manufacturing unit for full or part of
the Financial Year.
Agricultural consumers shall have to declare their intention for supply of the water to such
brick manufacturing units in advance and pay charges accordingly before commencement
of the financial year (i.e. in March every year).
11. RATE: SL
11.1 Tariff for Street Light for Local Authorities and Industrial Estates:
This tariff includes the provision of maintenance, operation and control of the street lighting
system.
For all the units consumed during the month: 405 Paise per Unit
For all the kVAh units consumed during the month: 305 Paise per Unit
The consumer shall arrange for renewal, maintenance and replacement of lamp, associated
Fixture, connecting wire, disconnecting device, switch including time switch etc. at his cost by
person authorised by him in this behalf under Rule-3 of the Indian Electricity Rules, 1956 / Rules
issued by CEA under the Electricity Act, 2003.
Maintenance of the street lighting conductor provided on pole to connect the street light shall be
carried out by Distribution Licensee.
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
11.2 Tariff for power supply for street lighting purposes to consumers other than the
local authorities and industrial estates:
For all units consumed during the month 405 Paise per kWh
The consumer shall arrange for renewal, maintenance and replacement of lamp, associated
Fixture, connecting wire, disconnecting device, switch including time switch etc. at his cost by
person authorised by him in this behalf under Rule-3 of the Indian Electricity Rules, 1956 / Rules
issued by CEA under the Electricity Act, 2003.
Maintenance of the street lighting conductor provided on pole to connect the street light shall be
carried out by Distribution Licensee.
This tariff is applicable to services of electricity supply for temporary period at the low voltage. A
consumer not taking supply on regular basis under a proper agreement shall be deemed to be
taking supply for temporary period.
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
Note: Payment of bills is to be made within seven days from the date of issue of the bill. Supply
would be disconnected for non-
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
PART - II
TARIFFS FOR SUPPLY OF ELECTRICITY AT HIGH TENSION
(3.3 KV AND ABOVE, 3-PHASE 50 HERTZ), AND EXTRA HIGH TENSION
The following tariffs are available for supply at high tension for large power services for contract
demand not less than 100 kVA
This tariff will be applicable for supply of electricity to HT consumers contracted for 100 kVA and
above for regular power supply and requiring the power supply for the purposes not specified in
any other HT Categories.
(a) For first 500 kVA of billing demand Rs. 150/- per kVA per month
(b) For next 500 kVA of billing demand Rs. 260/- per kVA per month
(c) For billing demand in excess of 1000 kVA Rs. 475/- per kVA per month
For billing demand in excess over the contract demand Rs. 555 per kVA per month
PLUS
13.2 ENERGY CHARGES
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
(b) For billing demand above 500 kVA and up to 2500 kVA 420 Paise per Unit
(c) For billing demand above 2500 kVA 430 Paise per Unit
PLUS
13.3 TIME OF USE CHARGES:
(b) For Billing Demand above 500 kVA 85 Paise per Unit
using tariff as per para 13.2 of this schedule, for every 1% drop or part thereof in the
average power factor during the month below 90% up to 85%.
(b) In addition to the above clause, for every 1% drop or part thereof in average power
factor during the month below 85% at the rate of 2% on the total amount of electricity
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
be entitled to a rebate at the rate of 0.5% (half percent) in excess of 95% power factor on the total
a
per para 13.2 of this schedule, for every 1% rise or part thereof in the average power factor during
the month above 95%.
The maximum demand in kW or kVA, as the case may be, shall mean an average kW / kVA
supplied during consecutive 30/15 minutes or if consumer is having parallel operation with the
grid and has opted for 3 minutes, period of maximum use where such meter with the features of
reading the maximum demand in KW/KVA directly, have been provided.
The contract demand shall mean the maximum KW/KVA for the supply, of which the supplier
undertakes to provide facilities from time to time.
13.9 REBATE FOR SUPPLY AT EHV:
For the consumer eligible for using supply at any time during 24 hours, entire consumption shall
be billed at the energy charges specified above. However, the energy consumed during night
hours of 10.00 PM to 06.00 AM next morning shall be eligible for concession at the rate of 40
Paise per unit.
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
Applicability: This tariff shall be applicable for supply of energy to HT consumers contracting for
100 kVA and above, requiring power supply for Water Works and Sewerage pumping stations run
by Local Authorities and GW & SB. GIDC Water Works.
(a) For first 500 kVA of billing demand Rs. 115/- per kVA per month
(b) For next 500 kVA of billing demand Rs. 225/- per kVA per month
(c) For billing demand in excess of 1000 kVA Rs. 290/- per kVA per month
For billing demand in excess of contract demand Rs. 360 per kVA per month
PLUS
14.2 ENERGY CHARGES:
(c) For billing demand above 500 kVA and up to 2500 kVA 455 Paise per Unit
(d) For billing demand above 2500 kVA 465 Paise per Unit
PLUS
14.3 TIME OF USE CHARGES:
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
(b) For Billing Demand above 500 kVA 85 Paise per Unit
using tariff as per para 14.2 of this schedule, for every 1% drop or part thereof in the
average power factor during the month below 90% up to 85%.
(b) In addition to the above clause, for every 1% drop or part thereof in average power
factor during the month below 85% at the rate of 2% on the total amount of electricity
per para 14.2 of this schedule, for every 1% rise or part thereof in the average power factor during
the month above 95%.
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
This tariff shall be applicable to a consumer taking supply of electricity at high voltage, contracting
for not less than 100 kVA for temporary period. A consumer not taking supply on regular basis
under a proper agreement shall be deemed to be taking supply for temporary period.
For billing demand up to contract demand Rs. 18/- per kVA per day
For billing demand in excess of contract demand Rs. 20/- per kVA per day
PLUS
15.2 ENERGY CHARGES:
PLUS
15.3 TIME OF USE CHARGES:
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
per para 15.2 of this schedule, for every 1% drop or part thereof in the average power
factor during the month below 90% up to 85%.
(b) In addition to the above clause, for every 1% drop or part thereof in average power factor
during the month below 85% at the rate of 2% on the total amount of electricity bill for that
be entitled to a rebate at the rate of 0.5% (half percent) in excess of 95% power factor on the total
amount of electricity bill for that month under th
per para 15.2 of this schedule, for every 1% rise or part thereof in the average power factor during
the month above 95%.
16 RATE: HTP-IV
This tariff shall be applicable for supply of electricity to HT consumers opting to use electricity
exclusively during night hours from 10.00 PM to 06.00 AM next day and contracted for regular
power supply of 100 kVA and above.
PLUS
16.2 ENERGY CHARGES:
For all units consumed during the month 225 Paise per Unit
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
using tariff as per para 16.2 of this schedule, for every 1% drop or part thereof in the
average power factor during the month below 90% up to 85%.
(b) In addition to the above clause, for every 1% drop or part thereof in average power
factor during the month below 85% at the rate of 2% on the total amount of electricity
bill for t
16.2 of this schedule, will be charged.
be entitled to a rebate at the rate of 0.5% (half percent) in excess of 95% power factor on the total
per para 16.2 of this schedule, for every 1% rise or part thereof in the average power factor during
the month above 95%.
NOTE:
1. 15% of the contracted demand can be availed beyond the night hours prescribed as per
para 16 above.
2. 10% of total units consumed during the billing period can be availed beyond the night
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
17 RATE: HTP- V
PLUS
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
For all units consumed during the month 180 Paise per Unit
If
be entitled to a rebate at the rate of 0.5% (half percent) in excess of 95% power factor on the total
per para 17.2 of this schedule, for every 1% rise or part thereof in the average power factor during
the month above 95%.
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
This tariff is applicable for power supply to Railway Traction at 132 kV/66 kV.
(a) For billing demand up to the contract demand Rs. 180 per kVA per month
(b) For billing demand in excess of contract demand Rs. 425 per kVA per month
NOTE: In case of the load transfer for traction supply due to non-availability of power supply at
the contract demand shall be charged at normal rate at appropriate point of supply.
Normal Demand Charges will also apply in case of bunching of trains. However, Discoms shall
charge excess demand charges while raising the bills and Railways have to give convincing
details and documentary proof of bunching of trains if they want to be charged at the normal
demand charges. If satisfactory proof of bunching of trains is provided, Discom shall consider that
occasion for normal demand charges, otherwise excess demand charges will be applicable
specified as above at 18.1 (b).
PLUS
18.2 ENERGY CHARGES:
For all units consumed during the month 500 Paise per Unit
March 2017
Madhya Gujarat Vij Company Limited
Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY
2017-18 to 2020-21 and Determination of Tariff for FY 2017-18
per para 18.2 of this schedule, for every 1% drop or part thereof in the average power
factor during the month below 90% up to 85%.
(b) In addition to the above clause, for every 1% drop or part thereof in average power factor
during the month below 85% at the rate of 2% on the total amount of electricity bill for that
, arrived at using tariff as per para 18.2 of this
schedule, will be charged.
be entitled to a rebate at the rate of 0.5% (half percent) in excess of 95% power factor on the total
per para 18.2 of this schedule, for every 1% rise or part thereof in the average power factor during
the month above 95%.
March 2017