FREE AIR DELIVERY (FAD) CALCULATION
Sr. No. Description Unit Value Value
1 Altitude of site, above mean sea level m 6 6
2 Maximum ambient temperature Deg. C 45 45
3 Maximum relative humidity % 87 87
4 Barometer pressure corresponding to the altitude KPa 101.26 101.26
5 Blast furnace air requirement, Vn Nm3/min 100.00 60.00
Nm3/hr 6000 3600
6 Free Air delivery of the compressor (FAD) m3/hr 6991.77 4195.06
liters/min 116529.53 69917.72
7 Air density at maximum ambient temperature Kg/m3 1.2 1.2
8 Air Mass Flow Kg/hr 8390.13 5034.08
Remarks
From site data
From site data
From site data
From Psychrometric
Chart
From client
Calculated
From Psychrometric
Chart
Calculated
Sr. No. Description Unit Value
HOT FLUID CROSS FLOW HEAT EXCHANGER
1 Mass flow of hot fluid, mh Kg/hr 8390 (FLUIDS UNMIXED)
2 Specific heat of hot fluid, cph KJ/KgC 1.013
3 Inlet temperature of hot fluid, th1 Deg.C 115 115
4 Outlet temperature of hot fluid, th2 Deg.C Unknown 98
5 Hot fluid capacity rate, Ch, mh*cph KJ/hrC 8499.07
COLD FLUID
6 Mass flow of cold fluid, mc Kg/hr 5035 84
7 Specific heat of cold fluid, cpc KJ/KgC 1.006
8 Inlet temperature of cold fluid, tc1 Deg.C 45 45
9 Outlet temperature of cold fluid, tc2 Deg.C Unknown
10 Cold fluid capacity rate, Cc, mc*cpc KJ/hr.C 5065.21
EFFECTIVENES & NTU
11 Maximum fluid capacity rate, Cmax KJ/hr.C 8499.07
12 Minimum fluid capacity rate, Cmin KJ/hr.C 5065.21
13 Maximum Heat transfer (possible), Qmax 354565
kW 98
14 Fluid capacity rate ratio, Cmin/Cmax 0.60
15 Effectiveness (assumed), e 0.75
16 Actual heat transfer, Qact 265924
kW 74
17 Outlet temperature of hot fluid, th2 Deg.C 84
18 Outlet temperature of cold fluid, tc2 Deg.C 98
19 No. of Heat Transfer Units (NTU) 2.25