Jodhpur Vidyut Vitaran Nigam Limted (Material Management & Contract Circle) New Power House, Industrial Area, Jodhpur-03
Jodhpur Vidyut Vitaran Nigam Limted (Material Management & Contract Circle) New Power House, Industrial Area, Jodhpur-03
Jodhpur Vidyut Vitaran Nigam Limted (Material Management & Contract Circle) New Power House, Industrial Area, Jodhpur-03
IMPORTANT DATES
INDEX
SECTION – III
TECHNICAL SPECIFICATION AND SCHEDULE OF REQUIREMENT FOR SUPPLY OF
33KV CROSS-LINKED POLYETHYLENE (XLPE) INSULATED POWER
CABLES AGAINST TN-1017
1. SCOPE:
1.1 This section provides for manufacture, testing before dispatch, supply and delivery F.O.R.
destination of ISI Marked 33 KV Aluminium conductor Screened, Cross linked Polyethylene
(XLPE) Insulated Armoured Shielded PVC Sheathed cable of rated voltage 33KV (earthed
system) conforming to IS:7098 (Part-II/1985) with latest amendment. The requirement of 33
KV Power XLPE Armoured Cables shall be as per schedule of requirement Annexed with
this section at Schedule-I. It may be noted that the requirement indicated in the schedule is
tentative & may vary at the time of placement of order.
NOTE:-
The Manufacturer shall manufacture the 33 KV Power Cable with CCV Line Process only
and offer from other type of manufacturing process (Syoplas) shall not be considered.
The bidder must possess valid ISI License for the bid item. The technical bid of the bidder
shall be considered for opening in the absence of non-furnishing of above required ISI License
along with the bid. However, price bid of the responsive bidder shall only be opened if bidder
furnishes above required ISI License upto official working hours of one working day prior to
the scheduled / notified date of opening of price bids, failing which price bid of the bidder
shall not be opened. The firm must possess ISO-9001 or above certification.
2. STANDARDS:
Unless otherwise stipulated in this specification the following standards with latest
amendments shall be applicable. Any departure from the Standards be indicated in Schedule-III.
3. CLIMATIC CONDITIONS:
4. GENERAL REQUIREMENT:
4.1 The 33 KV power cable shall be ISI Marked Aluminium conductor screened
cross linked polyethylene insulated armoured shielded and over all PVC sheathed. The 33
KV XLPE Cable shall conform to IS: 7098 (Part-II)/1985 with latest amendments shall
bear ISI Certification mark. The cable shall be capable of withstanding the normal
stresses associated with transportation, erection, reeling and unreeling operations without
getting deformed.
4.2 The 33KV XLPE Cable shall be suitable for the following conditions of laying:
4.3 The 33 KV XLPE Power Cable shall be suitable for use where combination of
ambient temperature and temperature rise due to load results in conductor temperature
not exceeding 90 degree C. under normal operation and 250 degree C under short circuit
conditions.
Specs/HT/TN-1017/Ju 5
4.4 The cable shall be used on 33 KV earthed system. The cables shall be
suitable for continuous operation at a power frequency voltage 10% higher than rated voltage.
5.0 MATERIAL:
5.1 CONDUCTOR:
5.2 INSULATION:
5.3 SCREENING:
The screening shall consist of one or more of the following:
b) Thermoplastic material.
5.4.3 The Central hole / void, if any, of the cable shall be invariably filled with suitable
filler material so that there is no gap in the centre.
5.5 ARMOURING:
5.5.2. Galvanized steel strips shall comply with the requirements of IS:3975/1979 with
latest amendments.
5.6.1 The outer sheath shall be of Poly Vinyl Chloride (PVC) compound conforming to the
requirement of type ST-2 of IS:5831/1984 with latest amendment.
6. CONSTRUCTION:
6.1 CONDUCTOR:
The conductor screening shall be provided over the conductor by applying non-metallic
semi conducing tape or by extrusion of semi conducting compound or a combination of the two.
6.3 INSULATION:
The Conductor (with screen) shall be provided with cross linked polyethylene (XLPE)
insulation applied by extrusion. The insulation shall be so applied that it fits closely on the
conductor (or conductor screening) and it shall be possible to remove it without damaging the
conductor. The thickness of insulation and tolerance of thickness of insulation shall be as per
Clause No.11 of IS:7098 (Part-II)/1985 with latest amendments.
6.4.1 The insulation screening shall consist of two parts namely metallic and non-metallic.
6.4.2 Non-metallic part shall be applied directly over the insulation of each core and shall
consist of either a semi conducting tape or extruded semi conducting or a combination of
the two or either material with a semi conducting coating.
6.4.3 Metallic part shall consist of either tape or braid or concentric serving of wires or a
sheath should be non-magnetic and shall be applied over the non metallic part.
The core identification shall be done as per Clause-13 of IS:7098 (Part-II)/ 1985 with latest
amendments.
The laid up core shall be provided with inner sheath applied either by extrusion or by
wrapping. However, application of inner sheath by EXTRUSION shall be preferred. It shall be
ensured that the shape is as circular as possible. The inner sheath shall be so applied that it fits
closely on the laid up cores and it shall be possible to remove it without damage to the
insulation. The thickness of inner sheath shall be as per Clause No.15.3 of IS: 7098 (Part-II)/ 1985
(with latest amendments).
6.8 ARMOURING:
The armouring shall be applied over the inner sheath. The Galvanized Steel Armoured
strips shall be applied as closely as practicable. The direction of lay of the Armour shall be left
hand. A binder tape may be applied on the armouring. The dimensions of the galvanized steel
strips shall be as specified in Table-4 of IS:7098 (Part-II)/1985 with latest amendments. The joints
in Armour strips if any shall be made by brazing or welding and the surface irregularities
shall be removed. A joint in any strip shall be at least 300 mm. from the nearest joint in any other
armour strips in the completed cable.
6.9.1 The outer sheath shall be applied by extrusion over the armouring. The colour of outer
sheath shall be black.
6.9.2 The thickness of the outer sheath shall be as per Clause No.17.3 of IS: 7098 (Part-
II)/1985 with latest amendments.
7. TYPE TESTS:
7.1 The material offered, shall be fully type tested as per relevant standard of specification
of IS:7098 (Part-II/1985) amended up to date. The bidder must furnish type test reports of
similar rating & design of tendered material along with bid as detailed at Schedule-IIIA “Pre-
Qualification Requirement”. The following shall constitute type tests:
a) Tests of Conductor:
m) Flammability test.
7.2 However, the purchaser reserves the right to demand repetition of same or all the type
tests in presence of purchaser’s representative.
7.3 The bidder must also clearly indicate various testing facilities available at their
works for testing the material as per relevant standards. In case of otherwise particulars of
the place where such testing is proposed to be conducted during the course of inspection shall
be indicated with the offer.
8.1 The inspection may be carried out by the purchaser at any stage of manufacturer. The
Inspection & Testing shall be governed by Clause No. 1.27 of Section-II (General
Conditions Of Contract). Acceptance of any equipment / material under this
specification by the purchaser shall not relieve the supplier of his obligation of
furnishing equipment in accordance with the specification and shall not prevent
subsequent rejection if the equipment/material is found to be defective. The following
Acceptance tests as per Clause No.18.2 of IS:7098(Part-II)/1985 shall be conducted in
presence of the purchaser's authorized representative /agency on each lot of offered cables:
i) Tensile Test.
ii) Wrapping Test.
iii) Conductor Resistance Test.
iv) Test for thickness of insulation & sheath.
v) Hot Set Test for insulation.
vi) Tensile strength & elongation at break test for insulation and sheath.
vii) Partial Discharge Test (for screened cables only).
viii) High voltage test and
Specs/HT/TN-1017/Ju 9
Cold impact test for outer sheath (IS:5831/1984) shall constitute the optional
test and shall be conducted on first lot of the offered cables of each size as per
Clause No.18.4 of IS:7098(Part-II)/1985 with latest amendments.
8.3 The bidder shall furnish Packing list mentioning serial Nos. of Drums, length in
each drum, gross weight of drum without lagging alongwith inspection offer duly signed by
the authorized representative of the firm. The purchaser reserves the rights to insist for
witnessing the acceptance / routine tests of the bought out items.
8.4 At least 5% of total numbers of drums subject to minimum of two (2) in the lot put up
for inspection shall be selected at random to ascertain the length of cable by the following method.
“At the works of manufacturer of the cable shall be transferred from one drum to another for
checking any manufacturing defects in the cable, at the same time measuring its length with the help
of the graduated pulley and cyclometer. The difference in average length thus obtained from the
declared length by the supplier in the packing list shall be applied to all the drums if the cable is
found short during checking the sample lot (s).”
8.5 The supplier shall present the latest Calibration Certificate(s) of testing instruments /
equipments to be used for the testing of the material covered in the Purchase Order to the
authorized inspecting officer/ inspecting agency of the purchaser. The testing instruments/
meters/ apparatus etc. should be got calibrated by the supplier from time to time from Govt.
Laboratory or any independent test laboratory/house having valid accreditation from National
Accreditation Board for Testing and Calibrating Laboratories for the testing equipments /
original manufacturer having trace ability to NABL/NPL or equivalent.
8.6 The calibration certificate(s) should not in any case be older than one year at the time
of presenting the same to the inspecting officer/ inspecting agency of the purchaser.
The testing instruments/ equipments should be duly sealed by the Calibrating Agency
and mention thereof shall be indicated in the calibration certificate(s).
The first offered lot shall not be less than 10% of ordered quantity of each size of HT
Power Cable or minimum quantity of 1 Km. of each size of HT Power Cable whichever is
higher.
If the bidder has already got conducted the requisite type test from the 1ST lot of material
received in Nigam’s Store against any previous / earlier tender of JdVVNL and such Type Test
reports are valid i.e. not older than 3 Years on the date of opening of Techno-Commercial Bids,
then the requirement of conducting Mandatory Type Test on the sample selected from 1st lot of
supply received in Nigam’s Store is RELAXED. For this purpose date of conducting type test will
be considered.
ALTERNATIVELY
In case the bidder do not meet the above requirement then One sample of 15 Mtr. Length from the 1st
Lot of each size of HT POWER Cable as received in purchaser's store shall be selected and sealed in the
presence of representative of supplier for getting it Type Tested at Govt. / Govt. approved / Govt.
Recognized / NABL accrediated Laboratory / ILAC Accrediated Laboratory.”
However, suppliers own lab shall not be considered for the purpose of type test reports. The
selected and sealed sample for type test shall be identified by providing Polycarbonate Seals
on both ends of cable and two stickers seals provided along the length of the cable. The
transportation charges of sample from store to test house shall be borne by NIGAM, whereas the
charges incurred towards type test of the material at test house shall be borne by the Supplier. The
testing charges should be remitted through D.D. in favour of Test House. The name of the
Test House shall be intimated separately.
a) Supplier shall have to replace the full quantity of the respective inspected lot
supplied to various stores and lying unused at stores.
b) For the quantity already utilized against the order in field a deduction of @ 30% (Thirty
Percent) of f.o.r. destination price of the material supplied shall be made.
c) Sample from next lot shall be selected again for type test. All test charges incurred
towards type test of the material for second time shall be borne by the Supplier.
d) The supplier shall have to pay the type test charges again for testing of fresh sample for
which the testing charges should be remitted through D.D. in favour of Test House.
b) For the quantity already utilized against the order in field a deduction of @ 30%
(Thirty Percent) of F.O.R. destination price of the material supplied shall be made.
“At the option of purchaser, the material received in the stores may be utilized in the field
after receipt of successful test report from CTL, Jodhpur for the mandatory test checking on
the samples selected from the material received at stores against first lot and subsequent lot(s)
in anticipation of successful type test report(s).”
NOTE:
1. The 70% payment shall be released after receipt of successful Test reports from CTL,
Jodhpur for the mandatory test checking on the samples selected from the material received
at stores against first lot and subsequent lot(s) in anticipation of successful type test reports.
2. The balance 30% payment shall be released after receipt of successful type test reports on
the samples selected from the material received in the stores.
i) Sample drums from the material received at stores shall be selected for testing at CTL
as per sampling plan given hereunder in presence of firm’s representative. The selected
sample drum / drums shall be transported to CTL by concern S.S. / ACOS of Nigam.
ii) The selected sample drum for CTL testing shall be identified by the seals provided by
Inspecting Officer / Inspecting Agency during pre-dispatch inspection at firms works and
these sealing details shall be invariably mentioned in the selection Memo by the nominated
officers of Nigam.
iii) The tests in the Nigam Testing laboratory (CTL) shall be conducted in the presence of
representative of supplier for which a 7 days notice shall be issued through Fax / Speed Post stating
Date & Time to the firm, so that supplier can depute their representative to witness the test . In case
the supplier or his representative does not turn up the testing shall be proceeded & completed. The
payment shall be released only after receipt of successful test reports for the samples selected
at purchaser’s stores for mandatory test checking on the samples to be selected from material
received at Nigam’s stores by officers to be nominated by Circle SE’s for testing at CTL.
iv) SAMPLING:
One number Drum out of each lot / sub-lot of 25 Nos. Drums or part thereof for the
material received in Stores of Nigam.
v) TESTS: The following tests shall be carried out as per relevant clause of latest IS on each
selected drum by drawing sample of 10 Mtr. at CTL from random distance during re-winding:
In addition to above tests remaining acceptance tests as per relevant IS shall also be
conducted at CTL provided the testing facility is available at CTL for these tests time to time.
Only those tests shall be conducted for which testing facilities are available in NIGAM’s Lab.
a) If the measured conductor resistance of the sample(s) exceeds beyond 2% as per the
resistance specified in the contract, the material shall be rejected and the same shall have to be
replaced by the supplier.
c) If the sample(s) fails in any other test, the material shall be rejected and shall
have to be replaced by the supplier.
d) If the contractor / supplier fails to lift the material declared rejected or any part
thereof from the consignee within a period of 15 days from the date of dispatch of information from
the purchaser, the purchaser shall be entitled to effect recovery along with other actions as per
Clause No. 1.62 of Section-II (General Condition of Contract).
e) The results of measurement of length test shall be made applicable to all drums
contained in each lot / sub lot by making deduction of less length of cable in a Sample Drum.
All test charges incurred towards test checking of the material received in our stores
shall be borne by the NIGAM.
The other manufacturer can also request challenge testing for any test based on
specification. The challenger would request for testing with testing fee. The challenge test
fee are proposed at least three time cost of testing. This is likely to deter un-necessary
challenges. The challenger would have the opportunity to select the sample from the store and
any such challenge should be made within the guarantee period. The party challenged, the
challenger & the utility could witness the challenge testing. The challenged testing would
cover all the type tests as per relevant IS.
pay the challenge fee and challenger would get the fee refunded. However, as a redressal
system the challenger would be asked for fresh selection of two more samples from the stores
and the same be tested in a NABL Laboratory (which shall be other than previously selected
NABL Accredited Lab) at the cost of supplier in presence of party challenged, challenger and
the utility. If any one or both samples does not confirmed the tests then the product is said to
have failed the tests. In such cases, the manufacturer will be declared as unsuccessful
manufacturer for the said product and balance supply shall not be availed and the order shall
be cancelled with levy of maximum penalty.
10 IDENTIFICATION:
10.1 The manufacturer shall be identified throughout the length of cable as per Clause
No.20.1 of IS:7098(Part-II)/ 1985 with latest amendment .
10.2 The cable code employed shall be as per Clause No.20.3 of IS:7098 (Part-II) /1985
with latest amendment.
10.3 EMBOSSING:
The cable shall also be required to be embossed with the word `Name of manufacturer
or Trade name, ELECTRIC/ Voltage Grade/ NAME OF DISCOM/ TN-1017 cable code, size
of cable & year of manufacture at every meter length for which no extra charges shall be paid.
The cable should be ISI marked & same should be embossed on the outer sheath of every
meter length of HT Cable.
11. MARKING:
The progressive length of cable in meter shall be marked on the outer sheath of every
meter length of HT Cable.
12.1 The cable shall be wound on a non returnable wooden drum conforming to IS:
10418/1982 of suitable size. The ends of cables shall be sealed by means of non-hygroscopic
material. Only one cable length shall be supplied on a drum. The cable can also be supplied on M-
Steel Drums as per relevant ISS as applicable.
12.2 The cable drums shall carry the following information either stenciled or painted.
i) Manufacturer's name, Brand or trade mark.
ii) Type of cable and voltage grade.
iii) Number of cores.
iv) Nominal cross-sectional area of the Conductor.
v) Cable Code.
vi) Length of cable on the drum.
vii) Direction of rotation of drum (by means of an
arrow).
viii) Gross mass.
ix) Year of manufacture.
x) ISI Certification mark.
xi) Purchase order/bid No. and
Specs/HT/TN-1017/Ju 14
The cable shall be supplied in standard length of 250 Mtrs in one Drum for size 33 KV,
3CX300 Sq.mm.
14. QUANTITY:
a) The quantities as mentioned in the schedule of requirement are tentative & these may
increase/decrease as per the requirement of the Nigam (Schedule-I).
The ordered quantity of the cable(s) can be supplied with quantity tolerance of (+/-) 2%
in each size.
The details of past orders executed by the bidder may be indicated in the
relevant Schedule- VII & VII A . The bid must furnish the documentary evidence like copy of
purchase order placed for detailing of past supplies.
The bidder shall furnish guaranteed technical particulars in the relevant Schedule
VA & VB. Any departure from the G.T.P be indicated in Schedule-V.
The bidder is required to furnish the detailed constructional drawing of cable clearly
showing shape of core, type, size of fillers/ interstices along with Center Filler etc. The
calculations of weights of different components of the cable along with weight of armouring
and calculation of number of armour strips indicating Lay Ratio & Lay Factor shall also be
furnished. In absence of this, the bids are likely to be ignored. The drawing of drums shall
also be furnished as per relevant applicable ISS.
The bidder is required to quote monthly delivery in Schedule-VIII. The delivery of quoted
quantity should be as under:
In case of ordered quantity is different than the quoted quantity, then monthly delivery shall be
adjusted proportionately. Bids of bidders in which monthly delivery rate is not quoted shall be
considered as Non-Responsive.
20. PRICES :
SCHEDULE- I
SCHEDULE OF REQUIREMENT
NOTE: The quantities as mentioned in the schedule of requirements are tentative and may
increase/decrease as per the requirement of the Nigam.
Specs/HT/TN-1017/Ju 17
SCHEDULE-II
PRICE VARIATION FORMULA FOR 33KV XLPE ARMOURED CABLE
Alo = Price per MT of EC grade Aluminium rods ( properzi rods). This price is as on 01.09.2013
(Base Date).
Al = Price per MT of EC grade Aluminium rods ( properzi rods). This price is applicable on first
working day of month, one month prior to date of delivery.
CCFAI = Variation factor for PVC compound / polymer for Aluminium Conductor cable.
Cc = Price of PVC compound. This price is applicable on first working day of month, one month
prior to date of delivery.
Fe = Price of Steel Strip. This price is applicable on first working day of month, one month prior
to date of delivery.
The date of delivery (i.e. date of readiness of material) is to be considered as per Clause
No. 1.10 of Section-I (Instruction to Bidders).
NOTE: 1. IEEMA prices will be exclusive of excise duty and other taxes.
2. No variation shall be allowed on labour, packing, forwarding, freight and insurance
charges.
3. Any statutory variation on ED and CST / VAT on the finished Cable shall be
payable according to Clause No.1.09.15 of section-I ‘Instructions to Bidder’
______________________________________________________________________
Certified that we agree to all the aforesaid technical specification except at S.No…….
for which our technical specification shall be as under:
_______________________________________________________________________
S.No. Technical specification Name of IS/other Other particulars
to which material/equipment/ standard specification if any.
Machinery/ T&P shall confirm to which material should
___________________________ _________ confirm __ _________________________
_______________________________________________________________________
(Signature)
Name & Designation
with seal of the bidder.
Specs/HT/TN-1017/Ju - 19
-
SCHEDULE-III-A
The bidder should fulfill following qualifying requirements for successful participation
in the tender along with relevant documentary evidence supporting each qualifying requirement
without which the offer shall be considered non-responsive & rejected.
a) The bidder should be a Manufacturer of offered items. The offers from sole selling agent/
authorized dealers shall not be entertained.
b) Old/ New suppliers:- Any bidder located within or outside the state of Rajasthan has
participated for the first time in a particular Discom & meeting minimum qualification
requirement and has supplied the tendered material/or of higher rating in other utility shall
be treated as an old supplier. Rajasthan’s firms although supplied in past but not meeting
minimum quantity supplied criterion including altogether new units which have not
supplied any quantity but having adequate & required manufacturing and testing facility
and technical know-how of the tendered material shall be considered as new firms and
would be eligible for trial order only. In case of supply made to the licensed power utility
outside India, the C.A. certificate furnished by firm shall be considered.
Note:-The material supplied and accepted for same/higher rating for Turnkey projects to a
licensed power utility/Govt. shall be considered for the purpose of evaluating criteria. The
certificate given by C.A. shall indicate above quantity separately.
The bidder shall meet both past supply and performance criteria as detailed below for
opening of tenders:-
2.01.1 The bidder is required to quote for minimum 10% of tendered quantity failing which
their offer may be considered Non-Responsive.
2.01.2 The bidder should have designed, manufactured / fabricated, tested and supplied to
utility / Discoms / Govt. Departments at least 2 X QQ (QQ being the quoted quantity) of
similar item / higher rating of tendered material / equipment in last 3 financial years
from the date of opening of technical-commercial bid.
Note:-The material supplied and accepted for same/higher rating for Turnkey
projects to a licensed power utility/Govt. shall be considered for the purpose of
evaluating criteria. The certificate given by C.A. shall indicate above quantity
separately.
2.02.1 i) If a bidder has supplied up to 50% of ordered quantity in previous tender up to date of
opening of subsequent tender and scheduled delivery period expired, the bid of such
bidder will not be opened in the Discom for that item.
ii) However, if the supplies have been completed for a quantity more than 50% but not
completed up to date of opening of subsequent tender and scheduled delivery period
expired, the quantity equal to the quantity pending in previous tender for that item shall
be reduced from the subsequent tender quantity to be allocated to the bidder.
3.0.1 The bidder shall furnish valid and authenticated type test certificate from a Govt.
approved/ a Govt. recognized/ NABL accredited laboratory/ ILAC i.e. International
Laboratory Accredited laboratory / ILAC i.e International Laboratory Accrediation
Corporation ( In case of foreign laboratory) of similar rating and design of tendered
material.
The bid of the bidders be also considered for meeting the Type Test criterion
if the bidder have the requisite type test conducted successfully on the samples
selected from the 1st Lot (If Applicable) supplied to JdVVNL against previous
tenders and its report are available with the Nigam & furnish certified copy of such
Type Test Reports with the bid or reference of order / tender be mentioned in Bid
document for verification purpose . Such type test certificates should not be older
than three years as on the date of bid opening. For this purpose date of conducting
type tests will be considered.
The type test certificates by in house laboratory of biding firm even if it is a
Govt approved/ Govt recognized/ NABL accredited Laboratory / ILAC accredited,
shall not be accepted, in case of their own bid. This will not apply if biding firm is
Govt. Company/ Public Sector Undertaking.
3.0.2 The bidder should furnish documentary evidence in support of the laboratory whose
type test have been furnished, that the said laboratory is a Govt/ a Govt. approved/ a
Govt. recognized/ NABL accredited laboratory/ ILAC accredited ( in case of foreign
laboratory)
3.0.3 The type test certificates shall be furnished either in original or duly attested by
notary.
Specs/HT/TN-1017/Ju - 21
-
3.0.4 The bids of only those bidders shall be considered to be meeting the type test criteria
who furnishes complete type test certificates with the bid as per above provision.
3.0.5 However, in following cases the the bid of the bidder may be considered meeting the
type test criteria if the bidder furnishes an undertaking stating that valid type test
certificate from a Govt. approved / Govt. recognized / NABL Accredited laboratory /
ILAC Accredited laboratory shall be furnished from first lot received in Nigam store
(without asking any delivery extension) along with bank guarantee with the technical
bid from a Nationalized / Scheduled Bank in prescribed proforma at Schedule-III C
or DD / Pay Order amounting to value as detailed below. The initial validity of bank
guarantee shall be nine months with claim period of three months in addition
The bidder who has been black listed in any of the state Discom or with whom business
relations have been severed in Jodhpur Discom shall not be considered. Severment of
business relations will be done in case of following circumstances for the period and
with the recovery mentioned against each:
After having given Show Cause Notice of 30 days, and having established & cogent
reasons for blacklisting of the firm as given below, the firm should immediately be
blacklisted for a period of 5 years indicating reasons of doing so, in the letter itself, and
a copy of such blacklisting should be given to the firm, with the approval of CLPC:-
(i) There are sufficient and strong reasons to believe that the supplier or his employee has
been guilty of malpractices such as manhandling/misbehavior with Government official
by supplier or his partner/employee, bribery, corruption or abatement of such a offence
in a position where he could corrupt Nigam’s official, fraud, vitiating fair tender process
Specs/HT/TN-1017/Ju - 22
-
including substitution of or interpolation in tender, mis-representation, pilfer-aging or
unauthorized use or disposal of Nigam’s material issued for specific work etc.
(ii) Where a supplier or his partner or his representative has been convicted by a court of
Law for offences involving moral turpitude in relation to the business dealing or where
security considerations including suspected disloyalty to the Nigam/state so warrant the
blacklisting.
(iii) If the State Bureau of Investigation or any other authorized investigating agency
recommends for blacklisting after completing the investigation.
Note:1 If a supplier after having tendered for a supply or after negotiations gives application
voluntarily vitiating the fair tendering process, it shall also tantamount to malpractice.
Note:2 A register containing the reasons for blacklisting the supplier as also the names of all the
partner of the suppliers and the allied concerns coming within the effective influence of
the blacklisted supplier will be maintained.
Note:3 A register of black listed supplier will be maintained which will not only include
suppliers enlisted with the Enlisting Authority but also black listed suppliers in Nigam.
Note.4 A Black listed supplier (i) shall not be entitled for registration in any of the Discom (ii)
shall not be awarded any supply order in future in any Discom during the notified
period.(iii) his registration if any shall stand cancelled immediately and his registration
security /EMD/S.D. shall stand forfeited. (iv) In case of blacklisting of the firm by any
one of Discom for the cogent prescribed reason(s) as stipulated above, the same shall be
applicable to all the three Discoms and as a consequence of blacklisting, all the pending
orders to that firm, will be cancelled in all three (3) Discoms with immediate effect.
However in respect of completed/executed contract G.P. obligations as well as other
liabilities shall be fulfilled by the supplier.
(a) After having given Show Cause Notice of 30 days, and having established & cogent
reasons for Severment of business relation as given below, the firm should immediately
be severed the business relations for a period of 2 to 3 years indicating reasons of doing
so, in the letter itself, and a copy of such severment should be given to the firm, with the
approval of CLPC:-
(i) The supplier continuously refuses to pay Nigam dues without showing adequate reasons
and where the purchasing authority is satisfied that no reasonable dispute attracting
reference to Settlement Committee or Court of Law exists for the supplier’s action of
non-supply.
(ii) When vendor does not accept LOI/detailed purchase order awarded on its accepted
prices and terms & conditions or does not comply with the contractual formalities.
(iii) When vendor/supplier who otherwise completed contractual formalities but does not
commence supplies on the date of opening of technical bid of the fresh
tender/completion of schedule delivery period whichever is later.
Note.1 In case supplier does not deposit outstanding dues towards Nigam, even after
completion of severment period, the period of severment will continue.
Note.2 Severment done purely/ mainly on account of non-deposition of dues against the
supplier/vendor/contractor could be lifted by CLPC, if the dues are deposited prior to the
expiry of such severment period.
Specs/HT/TN-1017/Ju - 23
-
Note 3 Severment done by one Discom for non-supply of material and /or corresponding non-
recovery of dues will not be effective in other Discoms except in respect of common
purchase cases of three Discom.
Note 4 On severment of business, the EMD/SD/vendor registration security will be forfeited.
Note 5 The orders in execution satisfactorily will not be cancelled other than the order on which
severment have been done.
(C) Debarment
(i) The competent authority may debar the supplier on account of his performance or other
disabilities, if it is no longer considered fit to remain under vendor registration as per his
obligation under vendor registration.
(ii) If at any subsequent stage of inspection of firms after award of contract, it is found that
firm does not have sufficient tech. staff or required/necessary technical equipments, the
purchasing authority can debar the firm for one year or next tenders whichever is later.
The debarment will be lifted only on re-inspection of firm’s works; the defects noticed
earlier are fully rectified to the satisfaction of Nigam.
(iii) When contract agreement executed and supplies commenced but could supply only up
to 50% of ordered quantity and scheduled delivery period expired, then the firm can be
debarred for one year or next tender whichever is later in that Discom only for that
particular item/rating/ capacity/size etc.
(iv) The suppliers who have been awarded contract for supply of material is not adhering to
the periodic delivery schedule, the contract awarding authority reserve the right to
terminate the contract and may debar the firm in participating in tender for a period of 2
to 3 years.
Note.2 If the firm is debarred in one Discom for any reasons then the same should not be
applicable in other Discom subject to exception that in case of common Discoms
purchases such debarment of a firm would be applicable to all three Discoms for that
particular item and rating/capacity/size etc.
Appeal against the order of blacklisting, severment and debarment can be filed before
BOD within a period of 3 months from the date of intimation. The letter of appeal will
be addressed to the order placing authority. Who will process the case for placing the
matter in B.O.D. with in a period 60 days. The BOD may reduce or waive the penalty, if
sufficient reasons/supporting documents are furnished by the supplier.
I) The bidder shall clearly indicate the deviations such as `Technical Deviation &
Commercial Deviations’ in the prescribed proforma only. The deviations
indicated elsewhere in the bid shall not be accepted.
II) The bidder must clearly fill up each and every particular of guaranteed technical
particulars annexed with Technical Specifications otherwise he will be responsible
for Technical Non-responsiveness.
Specs/HT/TN-1017/Ju - 24
-
III) All documents required in the prescribed format are to be furnished along with the
bid itself only except an attested copy of BIS license (wherever it is required),
failing which the bid will be summarily rejected.
IV) However, a copy of BIS License may be submitted by the bidder up to the official
working hours of one working day prior to the schedule / notified date of opening
of price bid.
Signature of bidder
With stamp
Dated
Specs/HT/TN-1017/Ju - 25
-
SCHEDULE-III-B
To,
Dear Sir,
Whereas Jodhpur Vidyut Vitaran Nigam Limited, Jodhpur ( hereinafter called the
purchaser) has issued a bid enquiry under TN-1017 for procurement of
……………………………………. ( Name of material)
Whereas M/s …………………………………………….(hereinafter called the bidder )
has furnished a bid for supply of ………….. to The Superintending Engineer (MM&C),
Jodhpur Vidyut Vitaran Nigam Limited, Jodhpur or his Nominated officer (s) .
Whereas in accordance with the provision of the specification of the afore said TN-1017,
the bidder can deposit a bank guarantee in lieu of the requirement of furnishing the type test
certificates.
Whereas M/s ………….. ( the bidder) have requested us (Name of the Bank) to furnish
the bank guarantee in lieu of the type test certificate for an amount equivalent to
Rs……………… ( in words also) only.
Under this Bank Guarantee , we (Name of the Bank) hereby undertake unconditionally
and irrevocably to guarantee as primary obligator and not as Surety merely, the payment to the
purchaser on his first demand without whatsoever right of objection on our part and without his
first claim to the bidder in the amount not exceeding ( amount of guarantee in figures and
words).
Payment pursuant to this undertaking will be demanded by the purchaser from the Bank
and will be met by the Bank without question in the case in which the bidder , on receipt of the
order and / or after the acceptance of this bid, makes default in furnishing the required type test
certificates. Also whether the occasion or ground has arisen for such demand the decision of
The Superintending Engineer (MM&C), Jodhpur Vidyut Vitaran Nigam Limited, Jodhpur,
shall be final.
The undertaking will be determined on but will not withstanding such determination,
continue to be in force till the expiry of 3 months from that date.
No indulgence or grant of time by the purchaser to the bidder without the acknowledgement
of the Bank will discharge the liabilities of the Bank under this guarantee.
Specs/HT/TN-1017/Ju - 26
-
The guarantee herein contained shall not be affected by any change in the constitution of
the bidder.
All disputes arising under the said guarantee between the Bank and the bidder or between
the bidder and the purchaser pertaining to the guarantee shall be subject to the jurisdiction of
Courts only at JODHPUR in Rajasthan.
The bank further undertake not to revoke this guarantee during its currency except with
the previous consent of The Superintending Engineer (MM&C), Jodhpur Vidyut Vitaran
Nigam Limited, Jodhpur
Notwithstanding anything contained herein before, the Bank’s liability under this
guarantee i.e restricted to Rs………………… (Rupees …………..) and the guarantee shall
remain in force upto …………………. Unless demand or claim in writing is presented on the
Bank within three months from that date, the bank shall be released and discharged from all
liabilities there under. However, the validity of the bank guarantee shall be extended as and
when required by the purchaser.
IN WITNESS WHEREOF the bank has executed these presents the day ………….
month……………. and year…………….
Yours faithfully,
( Bankers)
Executants
Witness:
1.
2
Specs/HT/TN-1017/Ju - 27
-
SCHEDULE-IV A
To,
Dear Sir,
1. The offer is valid for a period of 120 days from the next date of opening of Tecno-Commercial
Bid.
2. The prices are variable are in all respect as per specification.
3. It is noted that the quantity as mentioned in the specification are approximate and we agree
to supply any quantity as per your requirement.
4. The delivery shall strictly be in accordance with our delivery schedule as given in Schedule
– VIII of this specification. In case we fail to deliver the materials as indicated in the
clause No.1.23 of GCC (Schedule-II), we are liable to pay recovery for delay in delivery as
per clause No.1.24 of this Schedule-II of this specification. The material shall conform to
your specification No. JD/SE/MM&C/XENIIAII/ TN- 1017 and as per relevant ISS in all
respect.
5. We confirm that we agree to all the terms & conditions as well as the technical stipulation
of your specification No. JD/SE/MM&C/XENIIAII/ TN- 1017 and there are no deviations
other than as specified in the Schedule-VI (A & B).
Yours faithfully,
Statement of guaranteed technical particulars and other performance data for supply of
……………………………………….. (Name of material) against specification
no..………………………..
Certified that we agree to all the aforesaid technical particulars and other performance data
except following:-
(Signature)
Name & Designation
with seal of the bidder.
Specs/HT/TN-1017/Ju - 29
-
SCHEDULE-VA
S. 33 KV XLPE CABLES
PARTICULARS
No. 3CX300 SQ. MM
O M.S. Bushes
a) Numbers
b) Thickness of Sleeve (mm)
c) Dimension of Sleeve (mm)
d) Number of Bolts
e) Diameter of Bolts
Q Numbers
i) Diameter of bolts (mm)
ii) Centre Hole Diameter (mm)
Specs/HT/TN-1017/Ju - 35
-
SCHEDULE – VI (A)
TN-1017
JODHPUR VIDYUT VITARAN NIGAM LIMITED
A Govt. of Rajasthan Undertaking
DEPARTURE/DEVIATION FROM TECHNICAL SPECIFICATION
The bidder shall state under this schedule the departure from the Purchaser’s
specification in respect of technical is as under:-
Certified that we agree to all the technical specification of the NIT except for the deviation to
the extent indicated above.
(Signature)
Name & Designation
with seal of the bidder.
Specs/HT/TN-1017/Ju - 36
-
SCHEDULE – VI (B)
TN-1017
JODHPUR VIDYUT VITARAN NIGAM LIMITED
A Govt. of Rajasthan Undertaking
DEPARTURE FROM COMMERCIAL TERMS & CONDITIONS OF THE
SPECIFICATION
The bidder shall state under this schedule the departure from the Purchaser’s
specification in respect of Commercial terms & conditions:-
Certified that we agree to all the commercial terms & conditions as laid down in General
Conditions of Contract to the specification except for the deviation to the extent indicated
above.
(Signature)
Name & Designation
with seal of the bidder.
Specs/HT/TN-1017/Ju - 37
-
SCHEDULE – VII
TN-1017
JODHPUR VIDYUT VITARAN NIGAM LIMITED
A Govt. of Rajasthan Undertaking
LIST OF PAST SUPPLIES
The bidder shall state under this schedule whether material and equipments, similar to
those offered in the tender have been previously supplied by him. A list shall be given of such
orders executed by him together with information regarding the names of purchasing
organizations, quantities supplied and when the supplies were effected. This list should be in
form given below:-
S.No. Detailed particulars Qty Order No. Name & details Date of
of items supplied & Date of purchasing Completion
authority
1 2 3 4 5 6
Note: Separate schedules are to be furnished by the bidder for past supply to the JDVVNL,
JODHPUR other State Electricity Boards and other Departments /Organisations.
(Signature)
Name & Designation
with seal of the bidder.
Specs/HT/TN-1017/Ju - 38
-
SCHEDULE-VIIA
TN-1017
S. Financial Detailed Name and Order No. Unit Ordered Actual Supplied up Remarks
No year in Particulars particulars of & date to
which of item(s) purchasing against Quantity Value Quantity Value
material supplied authority which (Rs) (Rs)
supplied item(s)
supplied
1 2 3 4 5 6 7 8 9 10 11
DELIVERY SCHEDULE
TN-1017
PART – A
The delivery Schedule of the material by the Purchaser Officer is as mentioned hereunder:-
S.N Particular Of Material Commencement Rate Of Period for
o Period Supply per Completion of
Month delivery of Entire
material
1 33 KV XLPE After 30 Days from In Five Months
INSULATED POWER the date of receipt of thereafter at equal
CABLE detailed Purchase monthly rate of
Order. each size of cable.
Note – In case ordered quantity is different than quoted quantity, then monthly delivery
shall be adjusted proportionately. Bids, in which monthly delivery schedule is not
indicated, shall be ignored.
PART - B
In case bidder deviates from the delivery schedule mentioned by the purchaser in Part-A , then
the delivery Schedule of the material by the bidder shall be indicated / mentioned as under:-
Note: (i) During the commencement period, the process of model assembly and submission of
B.O.M. for approval shall be got completed.
(ii) During the commencement period the contractual formalities shall be got completed.
Signature
Name & Designation
With Seal of the Bidder
Specs/HT/TN-1017/Ju - 40
-
SCHEDULE - IX
TN-1017
JODHPUR VIDYUT VITARAN NIGAM LIMITED
A Govt. of Rajasthan Undertaking
List of Equipments and Technical Hands Available with the Firm
(To be filled in by the bidders & enclosed with the bid)
Manufacturers and / or their authorized agents who are quoting against this bid are
requested to furnish the following information along-with the bid. The Purchaser will have the
discretion to ignore the bid without the under noted particulars and/or ignore the bid particulars.
(Signature)
Name & Designation
with seal of the bidder.