Pablo Solorzano Guerra is a Peruvian civil engineer with over 35 years of experience implementing and monitoring transmission lines and substations. He has worked on numerous projects in Peru, the Democratic Republic of Congo, Mozambique, and Syria managing construction of transmission lines between 132-500 kV and substations between 60-500 kV. His roles have included engineering, management, and supervision of civil works.

Uploaded by

Joshue
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
155 views12 pages

CV Lineas de Transmisión

Pablo Solorzano Guerra is a Peruvian civil engineer with over 35 years of experience implementing and monitoring transmission lines and substations. He has worked on numerous projects in Peru, the Democratic Republic of Congo, Mozambique, and Syria managing construction of transmission lines between 132-500 kV and substations between 60-500 kV. His roles have included engineering, management, and supervision of civil works.

Uploaded by

Joshue
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

CURRICULUM VITAE

PABLO SOLORZANO GUERRA


AN ENGINEER
SUBSTATION AND TRANSMISSION LINES

Name : Pablo Roberto Solórzano Guerra

Nacionality : Peruvian

ID : 08072200

Passport : 4331406

Adress : Los Petroleros Nº 145 Los Álamos de Monterrico


Surco - Lima

Phone : 00-511- 3451982


00-511-2791870

Cell Phone : 00-511 -980420962 - RPC 980420962


054-957834303 - RPM *595259

Academic Degree : Civil Engineer

Registration CIP : 12978 Tuition, Mayo 1974

University: Universidad Nacional de Ingeniería - Lima - Perú

Título Universitario : Civil Engineer Date: 02/07/1974


Actions Fields - Implementation and Monitoring Specialist Lines
High transmission Tensión.35 years of experience.
Civil works - Mounting Pavement Torres and Driver
- Construction of Transmission Lines High Voltage
500 KV 400 KV 220 KV-132 KV 60 KV.
- Construction of Power Substations. 60 KV - 138 KV
220 KV 400 KV - 500 KV. Civil works
- Structural Design Foundations of Torres and Equipment Bases
SS.EE.
- Geotechnical studies at all levels of the project.

Languages

Espanish.
Basic English, working level
French, Italian and Portuguese, work level
PROFESSIONAL EXPERIENCE
I
1. Nombre de la Obra : LT 220 KV SUBESTACIÓN LA NIÑA

País : PERÚ

Ciudad : BAYOBAR - PIURA

2. Contratista : DELCROSA

3. Propietario : FOSFATOS PERÚ

4. Cargo : ING. RESIDENTE CIVIL

5. Duración, Periodo de tiempos: 3 MESES


Inicio : 1 Junio del 2015
Final : 30 Agosto del 2015

6. Monto de Contrato : U$$ 43’ 210,000

Note: The work was contracted in the form of turnkey, being the First Phase
Structural Design Foundations for LT 220 KV, Wooden poles 60 KV and substation
equipment between June 1, 2015 until August 30, 2015 and the second phase would be
implemented from July 2016 after acquisition of imported supplies.
II
2. Nombre de la Obra : GERENCIAMIENTO DE PROYECTOS, A
NIVEL NACIONAL, REFERIDOS AL SECTOR ELECTRICO Y CONSTRUCCION
EN GENERAL.

País : PERÚ

Ciudad : LIMA-CHICLAYO –PIURA –AREQUIPA

5. Contratista : MD SERVICIOS S.R.L

6. Propietario : ELECTRO PERU-ISA-TRANSMANTARO.

7. Cargo : GERENTE DE OBRAS.

5. Duración, Periodo de tiempos.


JULIO 2011 a JULIO2013
NOVIEMBRE 2008 a DICIEMBRE 2009
MAYO 2005 a SETIEMBRE 2008
MARZO 2001 a NOVIEMBRE 2003

6. Montos de subcontratos gerenciados ,aprox : U$$ 7,000,000


III

1. Nombre de la Obra : " CONSTRUCCION, MONTAJE, PRUEBAS Y


PUESTA EN SERVICIO DE LA SEGUNDA TERNA DE LA LINEA DE
TRANSMISION CHICLAYO – PIURA 220 KV Y REPOTENCIACION DE LA LINEA
EXISTENTE"

País : PERÚ

Ciudad : CHICLAYO –PIURA

2. Contratista : MD SERVICIOS S.R.L

EM –ELECTRICA DE MEDELLIN.

3. Propietario : ISA

4.Cargo : INGENIERO RESIDENTE ,OBRAS CIVILES


MONTAJE DE POSTES DE MADERA Y TENDIDO DE CONDUCTOR.

5. Duración : 5 MESES
Inicio : FEBRERO 2011
Termino : JUNIO 2011

6. Monto del Contrato : U$$ 1,806,000.


(No Incluye Suministros)
IV
1. Nombre de la Obra : EJECUCIÓN DE LA LINEA DE TRANSMISIÓN
500 KV CHILCA – LA PLANICIE
LONGITUD 45 Km.

País : PERÚ

Ciudad : LIMA

2. Contratista : FIANSA

3. Propietario : ISA

Cargo : INGENIERO RESIDENTE CIVIL

5. Duración
Inicio : Enero 2010
Termino : Febrero 2011

6. Monto del Contrato : U$$ 8,651,032


(No Incluye Suministros)
V
1. Nombre de la Obra : EJECUCIÓN DE LA LINEA DE TRANSMISIÓN
400 KV INGA - MATADI
LONGITUD 75 Km.

País : REPÚBLICA DEMOCRÁTICA DEL CONGO


ÁFRICA

Ciudad : MATADI - R. D. CONGO.

8. Contratista : MONTREAL

9. Propietario : SNEL Sociedad Nacional de Electricidad de


R.D. CONGO

10.Cargo : SITE MANAGER PROYECTO MATADI


Ejecución de Obras Civiles, Montaje de
Torres y Tendido de Conductor.

5. Duración : 9 Meses.
Inicio : Febrero 2008
Termino : Octubre 2008

6. Monto del Contrato : U$$ 9,800,000


VI
1. Nombre de la Obra :
• Línea de Transmisión 400 kv
CALLIA - MARROMEU
LONGITUD 90 Km.

• AMPLIACIÓN S.E. CHIMUARA 400 KV


/220 KV / 60 KV – OBRAS CIVILES

• CONSTRUCCIÓN S.E. MARROMEU 400


KV / 220 KV /l 10 KV/110 KV – OBRAS
CIVILES

País : MOZAMBIQUE (ÁFRICA SUR ESTE)


Ciudad Distrito : MOPEIA. Provincia: QUELIMANE

2. Contratista : ISOWAT MOZAMBIQUE L.T.D.A.


3. Propietario : Electricidad Mozambique
4. Cargo : Ingeniero Residente (SITE MANAGER)
5. Duración : 13 meses
Inicio : Diciembre 2006
Término : Diciembre 2007
6. Monto del Contrato : US$ 13'200.00
(Obras Civiles y Montaje Electromecánico)

VII

1. Nombre de la Obra : Sub Estación ALEPPO 400 KV/220 KV/


138 KV, 60 KV – OBRAS CIVILES
País : SIRIA
2. Contratista : Grupo Isolux Corsan
3. Propietario de la Obra : Electro Syria
4. Cargo : Ingeniero Jefe Supervisor de Obras Civiles.
5. Duración : 12 meses
Inicio : Diciembre 2005
Término : Diciembre 2006
6. Monto del Contrato : 30 Millones de Dólares
(Incluye: Proyecto, Suministros, Obras
Civiles, Suministro Electromecánico).
VIII
1. Nombre de la Obra : Sub - Estación Nueva Virú 1
138KV/60KV/34.5KV Trujillo - Perú
Sub-Estación Virú 138 KV / 60KV / 34.5
KV Virú - La Libertad – Perú
2. Contratista : Cobra Perú S.A.
3. Propietario de la Obra : Hidrandina
4. Cargo : Ingeniero Residente Civil.
5. Duración : 16 meses
Inicio : 01-01-2004
Término : 30-04-2005
6. Monto del Contrato : US$765,190

IX

1. Nombre de la Obra : L.T. 138 KV Olmos -


Túnel Trasandino. Longitud 21 Km.
Sub-Estación Eléctrica 138 KV/ 60 KV / 34.5
KV Olmos –Lambayeque – Perú
2. Contratista : VCHI S.A. Ingenieros Consultores
3. Propietario de la Obra : Proyecto Especial Olmos - Tinajones
DEPOLTI
INADE
4. Cargo : Ingeniero Civil.
Supervisor
5. Duración : 16 meses
Inicio : 01-SETIEMBRE-2000
Término : 30-ENERO-2001
6. Monto del Contrato : US$ 2'201,000

1. Nombre de la Obra : L.T. 220 KV Mantaro-Socabaya Long.615 Km.


Dpto. Huancavelica -Ayacucho-Arequipa.
2. Contratista : S.E.B.J. - Canadá.
3. Propietario de la Obra : Consorcio TRANSMANTARO
4. Cargo : Ing. Residente de Tramo 5-Andagua
Long. 100 km.
5. Duración : 13 meses
Inicio : Agosto 1999
Término : Agosto 2000
6. Monto del Contrato : US$ 31'000,000 (Incluye suministros)
XI

1. Nombre de la Obra : LÍNEA TRANSMISIÓN 60 KV


1. LT. Piura - Chulucanas. Longitud 50 Km.
2. S.S.E.E. Chulucanas 60/ 22.9 KV.
3. Ampliación SS.E.E. Piura Oeste 220/KV
/138KV
Provincia : Piura - Chulucanas
Dpto. : Piura
2. Contratista : O.C.P. Construcciones S.A. (Cobra S.A.)
3. Propietario de la Obra : Ministerio de Energía y Minas
4. Cargo : Ing. Residente de Obras Civiles y Montaje
de Estructuras de Postes de madera
5. Duración : 07 meses
Inicio : Diciembre 1996
Término : Junio 1997
6. Monto del Contrato : US$ 2'466,000

XII
1. Nombre de la Obra : L.T. 60 KV Abancay Chuquibambilla Long. 65 Km
Sub Estación de Chuquibambilla 60/22.9 KV
Provincia : Abancay - Grau
Dpto. : Apurímac
2. Contratista : Consorcio ICE Perú - JJC-ICE Bolivia
3. Propietario de la Obra : ELECTRO SUR ESTE S.A.
4. Cargo : Ing. Residente de Obras Civiles.
5. Duración : 08 meses
Inicio : Abril 1996
Término : Noviembre 1996
6. Monto del Contrato : US$ 2'050,000.00

XIII
1. Nombre de la Obra : 1. Línea de Transmisión 60 KV Abancay
Andahuaylas Long. 55 Km.
2. Sub-Estación Andahuaylas 60/22.9 KV.
Provincia : Abancay - Andahuaylas
Dpto. : Apurímac
2. Contratista : ICE Ingenieros Consultores y Ejecutores S.A.
3. Propietario de la Obra : ELECTRO SUR ESTE S.A.
4. Cargo : Residente de Obras Civiles
5. Duración : 11 meses
Inicio : Enero 1995
Término : Noviembre 1995
6. Monto del Contrato : US$ 1'705,000.00
XIV
1. Nombre de la Obra : 1. Línea de Transmisión 138 KV
Cachimayo - Abancay Long. 102 Km.
2. Sub-Estación Abancay 138 KV/60/60 KV. / 22.9
KV - Abancay.
3. Ampliación Sub Estación Cachimayo 138 KV
/60KV Cuzco.
Provincia : Cuzco - Abancay
Dpto. : Cuzco - Apurímac
2. Contratista : ICE Ingenieros Consultores y Ejecutores SA
3. Propietario de la Obra : ELECTRO SURESTE S.A.
4. Cargo : Ing. Residente de Obras Civiles
5. Duración : 09 meses
Inicio : Abril 1994
Término : Diciembre 1994
6. Monto del Contrato : US$ 3'250,000.00

XV

1. Nombre de la Obra : Ejecución de la Obra Central Térmica de


Ventanilla 200 MV
: Ampliación S.S.E.E. Chavarría
220KV/138KV
Provincia : Lima
Dpto. : Lima
2. Contratista : ICE Ingenieros Consultores y Ejecutores S.A.
3. Propietario de la Obra : ELECTROPERU - ETEVENSA
4. Cargo : Ing. Residente de Obras Civiles
5. Duración : 16 meses
Inicio : Setiembre 1992
Término : Diciembre 1993
6. Monto del Contrato : US$ 5'200.000.00

XVI
1. Nombre de la Obra : L.T. 200 KV Mantaro - Lima Proyecto Mantaro
: 3era. Etapa. Sector: Huanza - Lima
Long. 86 Km.
2. Contratista : COSAPI S.A. ICE Ingenieros Consultores y
Ejecutores
3. Propietario de la Obra : ELECTROPERU
4. Cargo : Ing. Residente, Tramo Huanza - Lima
5. Duración : 36 meses
Inicio : Febrero 1989
Término : Febrero 1992
6. Monto del Contrato : US$ 4'018,000.00, No incluye suministros
XVII
1. Nombre de la Obra : Ejecución de la Obra LT 60KV Guadalupe
- Pacasmayo. Long. 37 Kms. – Postes de
concreto
Provincia : Pacasmayo
Dpto. : La Libertad
2. Contratista : ICE Ingenieros Consultores y Ejecutores S.A.
Ejecutores
3. Propietario de la Obra : Cemento Pacasmayo S.A.
4. Cargo : Ing. Residente
5. Duración : 06 meses
Inicio : Julio 1987
Término : Diciembre 1987
6. Monto del Contrato : US$ 1’017,000.00.
7. Principales Características
Postes de Concreto Armado
No Incluye Suministros

XVIII
1. Nombre de la Obra : 1. L.T. 138 KV Cerro de Pasco - Huánuco -
Tingo María. Long. 186 Km.
2. Sub Estación Paragsha (Cerro de Pasco)
138/60/22.9 KV.
3. Ampliación Subestación Huanuco
138/60/22.9 KV
4. Subestación Tingo María
138/60/22.9 KV
2. Contratista : ICE Ingenieros Consultores y Ejecutores S.A.
3. Propietario de la Obra : ELECTROPERU S.A.
4. Cargo : Ing. Residente de Obras Civiles
5. Duración : 28 meses
Inicio : Julio 1984
Término : Octubre 1986
6. Monto del Contrato : US$ 6'108,000.00.

XIX
1. Nombre de la Obra : 1. L.T. 220 KV Lima - Pisco
Long. 215 Km.
: 2.Ampliación S.E. San Juan - Lima 220 KV
138 KV.
: 3.Ampliación de S.E. Independencia
220 KV-Pisco
Dpto. : Lima
2. Contratista : ICE Ingenieros Consultores y Ejecutores S.A.
3. Propietario de la Obra : ELECTROPERU S.A. – Mantaro II Etapa
4. Cargo : Ing. Residente de Obras Civiles
5. Duración : 30 meses
Inicio : Julio 1981
Término : Diciembre 1983
6. Monto del Contrato : US$ 8’157.000.00
XX
1. Nombre de la Obra : L.T. 220 KV TIARET - MOSTAGANEN
Long. 110 Km.
2. País : Argelia (África del Norte)
3. Contratista : SADELMI COGEPI (ITALIA)
4. Propietario de la Obra : SONELGAZ
Sociedad Argeliana del Gas
5. Cargo : Ingeniero Residente (Capo Cantieri)
6. Duración : 24 meses
Inicio : 01 /02/1977
Término : 30/01/1979
6. Monto del Contrato : US$ 17',500.000.00

XXI

1. Nombre de la Obra : L.T. 220 KV Mantaro - Pisco, Proyecto


Mantaro I Long. 300 Km.
Provincia : Huancavelica
Dpto. : Huancavelica
2. Contratista : ICE Ingenieros Consultores y Ejecutores S.A.
3. Propietario de la Obra : ELECTRO PERÚ - Corporación del Mantaro
(CORMAN)
4. Cargo : Ingeniero Asistente de Residente
5. Duración : 30 meses
Inicio : Febrero 1971
Término : Junio 1973
6. Monto del Contrato : US$ 18 000.000.00

SUMMARY: ARE EXECUTED WORKS 21.

Pablo Roberto Solórzano Guerra


Ing. Civil Execution Specialist
Transmission Lines and Substations.