Time: 3 Hours Maximum Marks: 100 (Weightage 75%) Note: Question No. 1 Is Compulsory. Attempt Any Three Questions From The Rest

The document is an exam for a software engineering course consisting of 4 compulsory questions and 5 optional questions covering various topics in software engineering. Question 1 has 4 parts asking about the CMM levels, data dictionaries, project metrics, and software risk identification. The other questions cover issues in web project management, prototyping, testing techniques, project estimation, risk management, version control vs change control, web application team organization, and software configuration management.

Uploaded by

riten mitra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views2 pages

Time: 3 Hours Maximum Marks: 100 (Weightage 75%) Note: Question No. 1 Is Compulsory. Attempt Any Three Questions From The Rest

The document is an exam for a software engineering course consisting of 4 compulsory questions and 5 optional questions covering various topics in software engineering. Question 1 has 4 parts asking about the CMM levels, data dictionaries, project metrics, and software risk identification. The other questions cover issues in web project management, prototyping, testing techniques, project estimation, risk management, version control vs change control, web application team organization, and software configuration management.

Uploaded by

riten mitra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

No.

of Printed Pages : 2 MCS-034


MCA (Revised)
Term-End Examination
o{51̀1 December, 2014

MCS-034 : SOFTWARE ENGINEERING

Time : 3 hours Maximum Marks : 100


(Weightage 75%)

Note : Question no. 1 is compulsory. Attempt any three


questions from the rest.

1. (a) With a neat diagram, explain the different


levels of CMM in detail. 10

(b) What is data dictionary ? Explain with an


example. 10

(c) What are project metrics ? Explain


different types of project metrics with an
example for each. 10

(d) How are software risks identified ? 10

2. (a) Explain the issues associated with the


management of web based projects. 10

(b) What is prototyping ? Explain the


problems and advantages of prototyping in
detail. 10
MCS-034 1 P.T.O.
3. (a) Explain various testing techniques. 10

(b) What are the steps involved in software


project estimation ? Explain. 10

4. (a) Write a note on management of risks. 10

(b) Compare and contrast version control with


change control. 10

5. (a) Explain organisation of web application


teams. 10

(b) How is software configuration


management done in software
development process ? Explain. 10

MCS-034 2 11, 000