2 LILO of Mejia-Kalyaneswari at Burnpur S/S D/C 220 37 79 55 0 0 DEC-16 Severe ROW problem in 17 no locations. SE Railway has given in principle
clearance of crossing.
Around 24 no. locations outside the ISP premises are being diverted again due
to severe ROW problem. Contractual issues cropped up due to repeated route
diversion. Presently work is held up.Likely to be dropped.
3 Mejia TPS - Gola D/C 220 342 552 541 509 148 DEC-08 APR-17 Forest: Working clearance obtained on 6.3.13. Contractual issues cropped up
due to delay in obtaining forest clearance as well as theft of materials (100 Ckm)
from erected line. Rectification work of the theft portion of the line has been
completed. 54 KM (i.e 108 CKM) of line has been charged at 220 KV from MTPS
end on 09.9.15.Line checking & assessment for rectification work is under
progress.Restringing started at theft portion.
4 Raghunathpur TPS -Ranchi (PG) D/C 400 311 439 439 439 306 AUG-10 MAR-17 Forest:Working clearance obtained in Jan'13.
PTCC Clearance:PTCC issued on 18.2.2014. Aviation clearance :
Obtained
Slow progress due to non-availability of working gang due to fund crunch of
Contractor (M/s Jyoti Structures). Approval has been arranged for payment to
the sub-vendor directly to solve above fund crisis of M/s
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 1 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 2 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 3 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
6 Aurangabad - Boisar line D/C 400 654 860 803 757 416 JUL-14 JUN-17 Stage-I Forest clearance (138ha.) received in Aug'15.Permission to work
received in Oct'15. Severe ROW problem (involvement grape garden).Critical
20 Chittorgarh - Ajmer line D/C 765 418 577 565 525 51 APR-18 APR-18 Work under progress.
21 Cudappah - Madhugiri D/C 400 709 42 18 APR-19 FEB-19 work under progress.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 4 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
24 Dehradun - Abdullapur D/C 400 178 247 246 242 141 NOV-14 MAY-17 5.0 Kms of stringing at Saharanpur Distt. under severe ROW.
Delay in tree cutting by forest deptt. in Uttrakhand affected stringing.
25 Dehradun - Bagpat D/C 400 330 443 443 443 323 NOV-11 JAN-17 Work progress affected due to ROW problem in western UP.
26 Dharmapuri (Salem New) - Somanahalli D/C 400 244 336 323 276 171 AUG-14 JUN-17 Severe ROW problem faced in Karnataka. Corridor compensation survey under
progress.
27 Dulhasti - Kishenpur D/C 400 115 340 335 328 104 NOV-14 MAR-17 Severe ROW on Doda Distt. 02 loc. under court stay.
28 Durgapur-Jamshedpur (Balance Portion) D/C 400 314 434 434 434 314 JUL-13 Aportion of line (279 Ckm) commissioned in April'12. balance portion under hold
due to ECL.
29 Edamon (KSEB) - Muvattupuzha (PG) D/C 400 297 438 159 105 29 NOV-08 JUN-18 Recently GO issued on 30.07.15 in which compensation is to be done on land
value, to be finalised by concerned DCwith suport of State Govt. Balance survey
resumed on 27.07.16. Package being re-tendered for award of balance work.
30 Essar Gujarat TPS - Bachau (Tripal) D/C 400 446 606 606 606 446 FEB-14 SEP-16 Ready for Commissioning 09/16. (Due to delay in Essar Generation Project &
non finalization of gentry 6 ckm work is pending balance 446 ckm has been test
charged.
31 Extn. Kudankulam APP - Tirunveli (Q) D/C 400 133 185 112 72 5 MAY-18 Work under progress.
32 Farakka - Baharampur (Twin HTLS) D/C 400 160 243 51 2 0 APR-18 Work under progress.
33 Farakka - Malda D/C 400 86 0 86 NOV-16 MAR-16 Line charged in Mar'16.
34 Gadarwara - Jabalpor Pool line D/C 765 203 278 185 132 45 NOV-17 MAY-17 Work under progress.
35 Gadarwara - Warora Pooling Station D/C 765 638 871 366 220 NOV-17 NOV-17 Work under progress.
36 Gaya - Varanasi S/C 765 273 738 738 738 273 AUG-14 APR-16 Commissioned 04/16.
37 Gola - Ranchi line D/C 220 112
38 Jabalpur PS - Orai D/C 765 720 969 868 783 214 APR-18 APR-18 Efforts are being made to complete earlier.
39 Jaipur (RVPNL) - Bhiwani (IInd Ckt) line S/C 765 277 751 751 751 277 MAR-16 SEP-16 Ready for commissioning 09/16.
40 Jameling - Alipurdauar line (Q) (India Side) D/C 400 397 496 72 1 JAN-18 Work under progress.Forest proposal submitted.
41 Jharkhand Pool (Chandwa) - Gaya (Quad) line D/C 400 234 332 332 332 234 NOV-13 JUN-16 Commissioning 06/16.
42 Jharsuguda - Dharamjaygarh line D/C 765 300 407 327 275 68 DEC-15 JUN-17 Huge forest involvement. Clearance awaited. Critical.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 5 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
45 Kameng - Balipara D/C 400 110 149 146 133 44 AUG-13 APR-17 ATS slowed-down to the extent possible to match Gen. (ant. by Oct'17).
46 Kanpur (new) - Kanpur (exit) D/C 400 41 62 62 62 41 OCT-14 JUN-16 Ready for Commissioning 06/16.
47 Kanpur - Jhatikara S/C 765 466 1269 1269 1269 466 OCT-14 JUN-16 Ready for Commissioning 06/16.
48 Khandwa - Indore line D/C 400 344 479 479 479 344 MAY-16 AUG-16 Ready for Commissioning 08/16.
49 Khargone TPP-Indore D/C 400
50 Kishanganga - Amargarh D/C 220 78 150 90 35 JUL-17 JUL-17 Work affected due to disturbance in Kashmir since Jul'16 & slow process to
resolve compensation issue. State/MoP help required. All efforts shall be made
to complete line matching with Generation.
51 Kishanganga - Wagoora D/C 220 228 248 68 6 MAR-18 MAR-18 Work affected due to disturbance in Kashmir since Jul'16 & slow progress. To
resolve compensation issue. State/MOP help required.
52 Kishenpur - New Wanpoh line (132 KM D/C + 7 KM MC+D/ 400 278 399 396 395 274 JUL-13 MAR-17 Due to distrubance in Kashmir since Jul'16. site work affected. 03 locs. in
Multi Ckt) C Ramban under severe ROW problem. State/MoP help required.
53 Kishenpur - Ratle, (Dulhasti- Kishenpur Second Ckt S/C 400
stringing extending up to Ratle HP)
54 Kota - Jaipur (South) D/C 400 356 529 326 299 NOV-17 NOV-17 Work under progress.
55 Kurukshetra - Jind line (Q) D/C 400 190 270 253 234 33 MAR-18 MAR-18 Efforts are being made to complete the line earlier. Work under progress.
56 LIIO of Both ckt of Rourkela - Raigarh (2nd line) at D/C 400 136 200 33 16 0 APR-19 Work under progress.
Jharsaguda (Sundargarh)
57 LILO IN of Both Ckt Teesta-III - Kishanganj at MC+D/ 400 21 36 36 36 21 NOV-13 JUL-16 Commissioned 03/16..(Late Reported).
Rangpo C
58 LILO of Meerut - Kaithal at Bagpat (Ckt-II) D/C 400 61 177 177 177 61 MAY-16 Commissioned 05/16.
59 LILO of One Ckt Parbati Pooling Station - Amritsar at D/C 400 17 49 49 49 34 JUL-17 JUL-17 Testing under progress. Efforts are being made to complete by Jan'17.
Jalandhar
60 LILO of 400 kV D/C Baripada - Mendhasal at Pindiabil 2xD/C 400 112 107 107 107 112 JUN-16 Ready for Commissioning 06/16.
61 LILO of Abdullapur - Karchan wangtoo at Kala Amb D/C 400 2 6 JUL-17 JUL-17 Award placed. Engg. in progress.
62 LILO of Agra - Bharatpur at Agra S/C 220 108 173 151 134 44 JUL-17 JUL-17 Work under progress. Severe ROW problem at Agra end.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 6 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 7 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
84 LILO of Kanpur - Jhatikara at Aligarh D/C 765 11 33 16 2 APR-18 APR-18 Efforts are being made to complete earlier.
85 LILO of Kurnool - Thirvualam line at Cuddapah D/C 765 194 282 33 16 0 JUL-18 Work under progress.
86 LILO of Loktak - Imphal at Imphal (New) line D/C 132 1 5 5 5 1 DEC-12 MAR-13 Commissioned 03/13.
87 LILO of Lonikhand (MSETCL)- Kalwa at Navi Mumbai D/C 400 16 25 25 25 16 SEP-10 MAR-17 Balance portion (02 Kms) of line being executed using under ground cable. Work
affected due to water logging. Severe ROW being encountered.
88 LILO of Neelamangla - Hoddy line and LILO of D/C 400 34 25 25 25 10 JUL-12 JUN-17 During the meeting with DC on 08,09,16. Raitha Sangha Requested to discuss
Somanhally - Hoddy at Yelahanka high compensation issue with energy minister. After support from State Govt.,
compensation survey by Revenue deptt. is in progress.
89 LILO of One Ckt of Bamnauli - Jhattikara at Dwarka-I D/C 400 45 57 MAY-17 MAY-17 Award placed, Engg. in progress.Commissioning matching with Sub station.
Delay in land acqurisation (land acquired in Aug'16).
90 LILO of One ckt RAPP - Kankroli at Chittorgarh D/C 400 28 54 54 54 28 JUN-16 SEP-16 Ready for Commissioning 9/16.
91 LILO of One ckt of 400 kV Bhadla (RVPN) - Bikaner D/C 400 120 202 MAY-19 Award placed in Dec'16.
(RVPN) line at Bikaner (New)
92 LILO of Pune - Aurangabad at Pune (GIS) 2xD/C 400 58 67 67 67 58 OCT-14 APR-16 Commissioned 04/16.
93 LILO of Ranganadi - Nirjuli at Pare HEP S/C 132 1 FEB-17
94 LILO of Sagardighi - Subhasgram line at Jeerat S/C 400 2 5 0 0 0 APR-18 Award placed in Apr'16. Engg. in progress.
95 LILO of Simhadri - Vijayawada line at Vimagiri-I (AP) D/C 400 55 63 0 0 0 JUL-18 Award placed in Mar'16. Engg. & survey under progress.
96 LILO of Simhadri - Vijayawada line at Vimagiri-II D/C 400 30 45 3 0 0 JUL-18 Work under progress.
97 LILO of Somanhally - Hoddy line at Yelahanka D/C 400 25 25 25 25 10 DEC-15 JUN-17 During the meeting with DC on 08,09,16. Raitha Sangha Requested to discuss
high compensation issue with energy minister. After support from State Govt.,
compensation survey by Revenue deptt. is in progress.
98 LILO of Subhashgram - Jeerat at Rajarhat S/C 400 8 16 16 16 8 APR-16 FEB-17 Work almost completed. Commissioning expected by Feb'17.
99 LILO of Tilaiya - Balia line at Gaya D/C 765
100 LILO of Vindhyachal - Jabalpur line (Q) (II Ckt.) at D/C 400 118 170 86 53 MAR-17 Work under progress.
Rewa PS
101 LILO of Vishnu Prayag - Muzaffarnagar at Tapovan D/C 400
Vishnugarh HEP
102 LILO of Wardha - Parli at Warora PS (Q) 2xD/C 400 186 246 107 66 NOV-17 NOV-17 Work under progress.
103 LILO of one circuit of Dulhasti - Kishenpur at D/C 400
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 8 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
112 Lucknow - Kanpur D/C 400 320 449 408 392 113 JUN-16 MAY-17 ROW in Lucknow end.
113 Madhugiri - Yelhanka D/C 400 132 178 131 101 JUN-14 DEC-17 Severe ROW in Karnataka. Efforts being made to resolve with the help of State
Govt.
114 Mauda-II - Betul (Quad) line D/C 400 386 551 520 513 308 MAY-16 MAR-17 Work under progress. Severe ROW problem being faced.
115 Meja - Allahabad line D/C 400 56 81 81 81 56 JUL-15 AUG-16 Ready for Commissioning 08/16.
116 Melriat (New) - Sihmui line D/C 132 12 23 0 0 0 DEC-12 JUN-17 Stage-I forest clearance awaited.Package re-awarded in Jun'16.
117 Mohindergarh - Bhiwani line D/C 400 120 150 AUG-18 Award placed in Aug'16. Engg. in progress.
118 Mokokchung (PG) - Mokokchung (Nagaland) line D/C 132 2 11 11 11 2 DEC-12 JUL-15 Line commissioned in Jul'15.
119 Mundra UMPP - Bhuj Pool line D/C 400 190 257 DEC-18 Award placed in Aug'16. Engg. in progress.
120 NLC - Karaikal line D/C 220 312 4 NOV-17 Award placed in Aug'16. Work under progress.
121 Nabinagar-II - Gaya (Q) D/C 400 204 289 51 9 0 JUN-19 Work under progress.
122 Nabinagar-II - Patna (Q) D/C 400 278 390 64 32 0 JUN-19 Work under progress.
123 Nagapattinam Pooling Station - Salem (NMTCL) D/C 765 406 543 543 543 406 MAR-15 OCT-16 Commissioned 10/2016.
124 Navsari - Boisor line (Balance portion ) D/C 400 161 567 567 567 161 OCT-12 DEC-16 Commissioned 12/2016. (Remaining portion was taken as commissioned as
Vapi-Navsari line in Mar'13)
125 Neyveli TS-II - Neyveli TS-I D/C 400 14 JUL-15 NOV-15
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 9 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
140 Ranchi - Jharkhand Pool line (Chandwa) D/C 400 138 195 195 195 138 NOV-13 JUN-16 Ready for Commissioning 06/16.
141 Roing - Tezu line S/C on 132 73 244 244 235 61 APR-12 MAR-17 Progress affecetd due to ROW problem & geogrephical condition. Due to non-
D/C availibility of downstream line, line shall not be utilized.
142 Roorkee - Saharanpur line (Ckt-II) D/C 400 37 104 104 104 73 JUN-16 Commissioned 06/16.
143 Roorkee - Saharanpur line (Quad) (Ckt-I) D/C 400 37 104 104 104 37 APR-13 MAY-16 Commissioned 05/16.
144 Salem - Madhugiri S/C 765 219 574 500 441 56 DEC-15 MAR-17 Severe ROW problem being faced.
145 Salem Pooling Station - Madhugiri Pooling Station line S/C 765 245 644 639 633 150 SEP-14 MAR-17 Severe ROW in Karnataka. Progress is slow due to severe ROW problem and
police protection is being sought for work on site.
146 Sasaram - Allahabad line (1 ckt shifted from NR D/C 400 6 12 12 12 6 MAY-15 AUG-16 Commissioned 08/16.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 10 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
151 Silchar - Melriat (New) line (charged at 132KV) D/C 400 286 456 373 243 112 DEC-12 SEP-17 Major portion of line is in forest. severe ROW in vicinity of Aizwal town due to stiff
resistance from influential local owner. package re-awarded in Jun'16. Work
under progress.
152 Siliguri - Purnea D/C 400 SEP-13 SEP-16
153 Singrauli - Allahabad line D/C 400 150 436 274 227 42 JUN-16 JUN-17 Work under progress. ROW at Singrauli end.
154 Solapur STPP - Solapur line - II (Q) D/C 400 25 40 29 28 9 MAR-17 Work under progress.Severe ROW problem.
155 Srikakulam - Garividi D/C 400 286 391 31 APR-19 FEB-19 Work under progress.
156 Srikakulam PP - Vemagiri - II Pooling Station (Vizag D/C 765 668 877 877 877 668 AUG-16 SEP-16 Ready for Commissioning 09/16.
TL)
157 Srikakulam Pooling Station - Angul line D/C 765 552 730 730 730 552 JUN-15 DEC-16 Ready for Commissioning 12/1016.
158 Tapovan Vishnugadh - Kunwari Pass D/C 400
159 Tehri Gen. - Tehri Pooling Station (Q) D/C 400 14 50 25 11 NOV-17 OCT-17 Generation project delayed expected by Sep'19. Efforts are being made to slow
down the work matching with Genration.
160 Tehri Pooling Station - Meerut D/C 765 4 15 NOV-17 OCT-17 Gen. project delayed (ant. by Sep'19). Work on the ATS are being slowed-down
to match Generation.
161 Tezu - Namsai line. S/C on 132 96 332 320 286 61 DEC-12 JUN-17 Progress affecetd due to ROW problem & geogrephical condition. Due to non-
D/C availibility of downstream line, line shall not be utilized.
162 Tirunelveli PS - Tuitcorin PS (Quad) line-1 D/C 400 114 33 0 0 0 APR-17 APR-17 Due to delay in Generation. Work has been slowed-down to match with
Generation.
163 Tirunelveli PS - Tuitcorin PS (Quad) line-2 D/C 400 116 34 0 0 0 APR-17 APR-17 Due to delay in Gen. Work has been slowed-down to match with Generation.
164 Tumkur (Pavagada) Pool - Hiriyur D/C 400 218 322 94 25 DEC-18 Work under progress.
165 Tuticorin Pooling Station - Salem Pooling Station D/C 765 731 1000 1000 1000 731 SEP-14 NOV-16 Commissioned 11/2016.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 11 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
167 Vapi (PG) - Kala - Kudus D/C 400 234 239 179 156 150 MAY-17 Severe ROW problem. Permission to work obtained in Dec'15. Kudue S/stn.
being implementated by MSETCL. Critical.
168 Varanasi - Kanpur D/C 765 652 885 885 885 652 OCT-14 JUN-16 Ready for Commissioning 06/16.
169 Varanasi - Sarnath (Q) D/C 400 213 306 306 306 213 OCT-16 Commissioned 10/2016.
170 Vemagiri - Chilkaluripeta D/C 765 580 746 137 APR-19 APR-19 Work under progress.
171 Vindhyachal - Jabalpur D/C 765 760 1036 335 63 JUN-18 JUN-18 Work under progress.
172 Wardha - Aurangabad (on 1200 kV) D/C 1200 696 961 927 844 450 OCT-12 JUN-17 Contract terminated 01 out of 02 nos due to unsatisfactory performance and
fresh tender being taken up.The pkg. has been bifurcated into two pkgs. 01 pkg.
awarded in Dec'14 & 2nd pkg. awarded in Feb'15. Remaining 01 pkg. also
terminated in Aug'15 due to poor performance. However contract was revived in
Feb'16. Severe ROW problem being encountered.
173 Wardha - Hyderabad line D/C 765 1072 1449 1259 1180 655 MAY-18 MAY-18 Work under progress. Wardha - Nizamabad link being expedited and efforts
being made for early completion by Mar'17.
174 Warora Pooling Station - Parli D/C 765 698 919 303 170 NOV-17 JAN-18 Work under progress.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 12 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
14 (Arunachal Pradesh) LILO of Daporijo - Along 132 KV S/C on 132 Yet to be awarded.
S/C at Basar D/C
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 13 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
19 (Arunachal Pradesh) Niglok - Pasighat New (Napit) S/C on 132 Yet to be awarded.
D/C
22 (Arunachal Pradesh) Pasighat Old - Mariyang line S/C on 132 Yet to be awarded.
D/C
25 (Arunachal Pradesh) Roing (PG) - Anini line S/C on 132 Yet to be awarded.
D/C
26 (Arunachal Pradesh) Roing (PG) - Dambuk line S/C on 132 Yet to be awarded.
D/C
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 14 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
30 (Arunachal Pradesh) Tezu (PG) - Halaipani line S/C on 132 Yet to be awarded.
D/C
32 (Arunachal Pradesh) Ziro (PG) - Palin line S/C on 132 Yet to be awarded.
D/C
33 (Arunachal Pradesh) Ziro (PG) - Ziro New line S/C on 132 Yet to be awarded.
D/C
39 (Assam) LILO of Jorhat (Gormur) - Nazira at Teok. S/C on 132 Yet to be awarded.
D/C
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 15 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
55 (Manipur) Kakching - Kongba (2nd Ckt) line D/C 132 Yet to be awarded.
56 (Manipur) LILO of Yurembam (Imphal-State) - Karong S/C 132 Yet to be awarded.
line at Gamphajol
57 (Manipur) LILO of one circuit of Kongba - Kakching D/C 132 Yet to be awarded.
line at Thoubal S/S
58 (Manipur) Rengpang - Tamenlong line S/C on 132 Yet to be awarded.
D/C
59 (Manipur) Yaingangpokpi - Kongba (2nd Ckt) line D/C 132 Yet to be awarded.
60 (Manipur) Yuremum - Karong - Mao (Manipur - S/C 132 Yet to be awarded.
Nagaland border) section of Yuremum-Karong-Kohima
line
61 (Mizoram) Chawngte - S. Bungtlang line S/C 132 Yet to be awarded.
62 (Mizoram) Lungsen - Chawngte line S/C 132 Yet to be awarded.
63 (Mizoram) W. Phaileng - Marpara line S/C on 132 Yet to be awarded.
D/C
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 16 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 17 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 18 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
2 BTPS - Kokrajhar line S/C on 132 10 39 37 28 5 DEC-13 JAN-16 Frequent Bandhs in BTAD area, forest clearance received, RoW at Loc 21,22 in
D/C forest area etc. are making the project slipped.
3 Bongaigaon TPS - Rangia (Salakati) D/C 220 327 517 494 452 77 JAN-13 MAR-17 1. Delay due to re alignment of line such as proposed airport at BTAD area, 800
kV line of PGCIL, ROW, Local Problem etc. are attributing to the delay. Now
there is almost settlement of RoW and compensation related issues, the Erection
work is going on smoothly. How ever in Mushalpur areas (Baksa) District there
has been serious law and order issues and construction work is carried out by
deploying Security personnel.
4 Kokrajhar - Bilashipara - Gauripur S/C on 132 63 203 199 121 22 SEP-13 FEB-16 Work in progress. Clearance and RoW
D/C
5 Kukurmara - Azara line S/C on 132 5 24 0 0 DEC-11 MAR-16 Check survey done. Profile drawing approved.
D/C
6 LILO of Jorhat - Bokakhat at Jorhat (West) S/S D/C 132 10 9 9 9 3 NOV-13 AUG-15 Completed on 06.07.2015.
7 LILO of Namrup - Tinsukia at Bordubi S/S D/C 132 4 9 9 8 5 NOV-13 MAY-15 completed 13.07.2015.
8 LILO of both ckt of Depota - Gohapur at Sonabil S/S 2xD/C 132 5 6 6 6 1 NOV-13 JUN-16 in progress.
9 LILO of one ckt Samaguri - Sarusajai line at Sonapur D/C 220 55 41 31 0 0 DEC-13 JAN-17 RoW & Water logging problems adversely affected erection work.
S/S
10 LILO of one ckt of Tinsukia - Margherita at Rupai D/C 132 59 109 109 109 59 JAN-13 JUL-15 commissioned on July 2015.
(Doomdooma) S/S
11 Nazira - Mariani (Garmur) line S/C 132 34 237 237 137 69 APR-13 completed.
12 Samaguri - Lanka line (2nd Ckt) S/C 132 61 205 205 205 61 NOV-13 JUN-16 Completed/ Charged on 04.12.2015.
13 Samaguri - Nagaon line S/C on 132 42 142 142 142 42 JAN-13 DEC-13 completed in Dec' 2013.
D/C
14 Sonapur - Chandrapur line D/C 132 28 51 39 11 0 NOV-13 JUN-16 In progress Railway crossing/ ROW/ compensation issue..
15 Sonapur - Jagirod line D/C 132 52 86 40 25 0 NOV-13 JUN-16 In progress (compensation issue)..
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 19 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
9 Darbhanga - Supaul/Lokhi D/C 220 178 327 322 320 156 JUN-16 JAN-17
10 Gaurichak - Bihta (New) D/C 220 86 143 117 107 22 DEC-16
11 Gaya (PG) - Sonenagar (New) D/C 220 183 299 299 299 183 JAN-16 JUL-16 Commissioned 06/16. (Late Reported).
12 Kishanganj (New) - Madhepura D/C 220 141 510 430 237 16 JUN-16 DEC-16
13 Kishanganj (PG) - Kishanganj (New) 2xD/C 220 16 42 42 42 16 FEB-15 OCT-16 Commissioned 10/2016.
14 LILO of 2nd ckt Pusouli (PG) - Ara (PG) at Pusouli D/C 220 5 19 19 19 5 MAY-15 Completed.
(New).
15 LILO of Begusarai - Kanti at Samastipur 2xD/C 220 24 53 53 53 24 JAN-16 OCT-16 Commissioned 10/2016.
16 LILO of Both Ckt of Purnea - Begusarai at BTPS Extn D/C 220 work yet to be awarded
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 20 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 21 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 22 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 23 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 24 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 25 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 26 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
3 BECL (Padva) - Botad line D/C 220 188 292 169 115 0 MAR-17 W I P / Severe RoW problems
4 Bechraji - Maruti Suzuki line D/C 220 6 12 9 3 0 SEP-16 SEP-16 A/T given on 03.08.2016
5 Bhachau - Radhanpur D/C 220 340 0 0 0 MAR-17 Yet to award.
6 Bhachunda - Varsana line (Twin AL-59) D/C 400
7 Bhatia - Bhogat line (AL-59) D/C 220
8 Bhatiya-Kalwad line D/C 220 238 373 101 59 0 DEC-16 W I P / Severe RoW problems
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 27 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
28 Hazaira (GSEC) - Mota D/C 220 111 182 107 94 20 AUG-17 Tender to be invited at risk purchase
29 Interconnection of one ckt of Jhanor - Navsari line with D/C 400 1 1 APR-16 Commissioned 04/16.
one ckt of Ukai - Kosamba line
30 Jamnagar - Hadala D/C 220 139 257 226 221 107 MAR-17 WIP
31 Jasdan - Gondal D/C 220 100 0 0 0 MAR-17 Yet to award
32 Kalawad-Kangasiyali D/C 220 112 191 158 138 59 MAR-17 W I P / Severe RoW problems
33 Kasor - Herang (DFCC) line D/C 220 39 73 73 73 39 JAN-15 AUG-16 Commissioned 08/16.
34 Keshod - Keshod D/C 220 10 0 0 0 MAR-17 Yet to award
35 Keshod - Timbdi D/C 220 140 0 0 0 MAR-16 Yet to award
36 Keshod - Visavadar D/C 220 120 0 0 0 MAR-17 Yet toaward
37 Kheralu - Dharewada (DFCC) line D/C 220 53 97 64 36 0 NOV-15 DEC-16 Work in progress.
38 Kosamba- Achhalia D/C 400 140 0 0 0 0 MAR-17 Yet to award
39 LILO of Haldarwa - Zaghadia line D/C 220 14 26 18 16 0 NOV-15 MAR-17 Work in progress.
40 LILO of SSP- Asoj & SSP -Kasor lines at Achhalia D/C 400 80 0 0 0 MAR-17 Yet to award
S/S
41 LILO of Amreli - dhasa line at Botad S/s D/C 220 100 186 112 33 0 MAY-15 DEC-16 Work in progress.
42 LILO of Bhatia - Kalav ad - Kangasiyali at Khambhalia D/C 220 40 0 0 0 SEP-16 Yet to award
43 LILO of Both ckt of Jamanvada - Varsana at 2xD/C 220 83 83 JUN-16 Commissioned 06/16.
Bhachunda (AL-59) M/C
44 LILO of Both ckt of Tebhda - Nyara line at Moti Gop D/C 220
S/S (M/C line AL-59)
45 LILO of Chorania - Gondal at Rajkot-II D/C 220 50 0 0 0 MAR-17 Yet to award
46 LILO of Chorania - Gondal at Shapar D/C 220 40 0 0 0 MAR-17 Yet to award
47 LILO of Essar-Hadala line at Kalavad S/S D/C 400 100 26 22 16 3 DEC-16 WIP
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 28 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 29 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
81 LILO of one ckt of 400 kV D/C Kosamba - Choraina D/C 400 90 MAY-16
line at 400 kv Sanand-II GIDC S/s
82 LILO of one ckt of 400 kV D/C Kosamba - Chorania D/C 400 46 FEB-17
line at 400 kV Pachchham S/s
83 LILO of one ckt of Akrimota - Nakhatrana line at D/C 220
Bhachunda
84 LILO of one ckt of Wanakbori - Asoj at Vyankatpura D/C 220 28
(Jarod)
85 LILO on one circuit of 220 kV D/C Achhaliya - D/C 220 168 304 63 20 0 OCT-18 LOI given on 12.04.2016 and work under progress.
Vyankatpur line at 220 kV Kawant S/S
86 LLO of 220 kv Vadavi - Chhatral line at Santej S/s D/C 220 43 74 47 29 0 MAR-14 MAR-17
87 Mitha - Becharji D/C 220 58 103 83 63 0 MAR-16 DEC-16 Work in progress.
88 Mundra (Adani) - Zerda line 1 D/C 400 666 997 453 275 0 MAR-17 Severe RoW issue
89 Nanikhakhar - Varsana - Chitrod D/C 220 290 0 0 0 MAR-17 Yet to award
90 Palanpur - Amarigadh (DFCC) line D/C 220 80 144 41 0 0 MAY-16 MAR-17 Work in progress.
91 Palitana - Talaja D/C 220 90 0 0 0 MAR-17 yet to award
92 Pipavav-Amreli D/C 400 150 0 0 0 MAR-17 Yet to award
93 Pirana (PG) - Gatrad D/C 220 50 0 0 0 MAR-17 Yet to award
94 Pooling station -Sankhari D/C 400 218 275 217 192 53 MAR-17 WIP
95 Prantij - Agiyol D/C 220 60 0 0 0 MAR-17 Yet to award
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 30 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 31 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
12 LILO of Naggal (PGCIL) - Baddi Line at Pinjore D/C 120 6 46 46 46 6 SEP-17 Work of line has been completed on 20.10.2014 only termination pending at 220
kV sub station Pinjore, which is yet to be constructed.
13 LILO of Narwana - Mund at Khatkar (Jind) 2xD/C 220 44 0 0 0 0 JAN-18 Work awarded to Inabensa Bharat Ltd. Contractual problem.Arbitration case.
Work re-awarded to M/s Isolux.
14 LILO of Pehowa - Kaul at Bhadson D/C 220 74 151 0 0 0 Route survey under progress
15 LILO of both Ckt of Cheeka - Durala at Sonta s/s D/C 220 78 128 128 128 78 JUL-13 DEC-16 Commissioned 12/2016
16 LILO of gurgaon Sec -72 - Sector 52 (A) at Sector 57 D/C 220 1 MAR-17 Work yet to be award.
17 Palwal (Meghpur) - Meerpur Kurali D/C 220 53 106 106 106 53 AUG-16 Ready for Commissioning 08/16.
18 Panchgaon 400 kV - Panchgaon 220 kV D/C 220 1 0 0 0 0 OCT-17 Work has been re-awarded to M/s Isolux . Work yet to be start.
19 Panchkula (PGCIL)- Panchkula Sector 32 D/C 220 40 44 29 4 0 FEB-17 Work has been re-awarded with schedule completion period of one year.Partial
route approved. Work in progress.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 32 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 33 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 34 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 35 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
3 Chatra - Latehar D/C 220 208 327 323 305 74 FEB-17 FEB-17 Forest clearance pending.
4 Chatra - PBCMP (Barkagaon) D/C 220 114 171 54 21 0 FEB-17 FEB-17 Forest clearance pending.
5 Daltonganj - Garhwa D/C 220 66 113 57 34 0 FEB-17 FEB-17
6 Dumka - Jasidih D/C 220 148 JAN-18 JAN-18 Detail survey going on.
7 Essar (Latehar) - Latehar D/C 400 81 118 102 88 22 MAR-17 Line is passing through 81.843 Ha of forest area in Latehar division, which
involves ten location (7.67 Km Stringing). Forest proposal submitted in May 2013
and fresh application submitted for issue of NOC of FRA based on CS map in
Sep 2016. Total 22 villages are affected. Gram Sabha meeting for 20 villages
completed, balance two are remained for Dhurva and Bhajkum village. District
administration has to organized Gram Sabha meeting of issue of NOC.
8 Giridih - Jamua D/C 220 160 MAY-18 MAY-18 LOI issued on 08.11.2016.
9 Giridih - Jasidih D/C 220 160 MAY-18 MAY-18 LOI issued on 08.11.2016.
10 Godda - Lalmatia D/C 220 100 MAY-18 MAY-18 LOI issued on 08.11.2016.
11 Govindpur - Dumka D/C 220 203 332 331 330 203 MAR-17 Line is passing through 12.24 Ha in Dumka division, 12.1 Ha in Devghar division,
0.388 Ha in Dhanbad division and 6.2169 Ha in Jamtara division, which involves
one location (16.14km stringing). Project proposal has been submitted to DFO,
Dhanbad and Jamtara in Dec 16 and for Dumka, Deoghar division it will be
submitted in Jan 17.
12 Hatia - Namkum (PGCIL) D/C 220 65 127 67 53 0 MAR-17 Line is passing through 13.221 Ha of forest area in Ranchi division which
involves sixteen location (2.06km stringing). The proposal uploaded in Jun 15.
RMOEF raised queries in Nov 16 regarding details of forest line, tree
enumeration and possibility of alternate route. DFO, Ranchi submitted reply in
Dec 16.
13 LILO of Patratu - Hatia at PTPS by MC Tower D/C 220 Survey held up due to non-finalisation of PTPS substation layout.
14 LILO of one ckt TTPS - Govindpur at Phase-III D/C 220 70 SEP-16
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 36 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
18 TTPS - Govindpur D/C 220 181 295 229 202 36 MAR-17 Line is passing through forest area 103.621 Ha in Bokaro division and 1.275 in
Hazaribagh division, which involves 67 location (47km stringing). Proposal
submitted to MOEF. Gram Sabha proceeding of total eleven villages of Bokaro
district have been received. NOC and FRA are yet to be issued by district
administration.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 37 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
2 Bellary (PS) - C.N. Hally D/C 400 124 APR-17 This work is included in (BPS-New Madhugiri Near Tumakuru)work
3 Bellary (PS) - New Madhugiri (near Tumakur) D/C 400 437 647 645 636 398 DEC-16 APR-17 Work under progress.
4 Bellary (TPS) - Bellary (PS) D/C 400 5 AUG-16 This work is not in planned works.
5 Bidadi (PGCIL) - Magadi S/S D/C 220 64 63 13 0 0 JUL-14 NOV-16 Work under progress.
6 Bidadi - Kothipura (Channapatna) D/C 220 174 82 63 2 FEB-08 MAR-17 220-66 kV MC line from 220 kV Kothipura to Bidadi S/s:
(1) ROW problems pending in DC Court Ramanagar for Loc 15 since 2012.
(2) ROW problems to be solved locally at 8 locations 2,3,4,4A,5, 6,33,77.
Final Notice issued to M/s ABB & M/s Deepak cables for termination of the
contract on 14.12.2015 by CEE, Tz. The contract is terminated on 25.01.2016.
The Joint inventory along with M/s ABB & M/s Deepak Cable completed.
Tendered on 10.05.2016 for balance work.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 38 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
19 LILO of RTPS - Lingasugur S/C line at Mallat (Manvi) D/C 220 6 13 12 12 6 AUG-14 DEC-16 Work under progress.
20 LILO of Shimoga - Mysore at Dandiganahally D/C 220 35 68 65 61 22 FEB-08 FEB-17 Work under progress.
21 LILO of Somanahalli - Malur at Vikas Tech Park D/C 220 9 32 27 26 3 JUN-11 MAR-17 Work under progress. (1) Local ROW problems at locations: (i)9,10,14A,16,-
being pursued.
(2) DC COURT:
For corridor 8-9 & 10-11: Case filed in DC court on 27.05.2013. Being pursued.
(ii) Loc 16: Case filed at DC Court on 26.11.2014. Being pursued.
22 Madhugiri - Pavagada D/C 220 120 212 210 199 34 JUL-14 NOV-16 Work under progress.
23 Shanthigrama - B4 line ( near Hedanahalli limits) D/C 220 15 34 34 32 9 SEP-09 DEC-16 Work terminated on 12.05.2016. Balance works to be retendered.
24 Somanahalli - Malur - Kolar D/C 220 180 272 267 267 140 MAR-08 MAR-17 Malur-Kolar line charged (42 Ckm). The line from Malur end upto Loc 137
charged (68.98 Ckm).The line from Somanahalli end upto Loc 55 charged (23.64
Ckm). Total line charged 134.62 Ckm.Balance works to be retendered.
Case pending in High Court:
(i)Loc 84,85,86,88 & 89: Case filed by KPTCL in DC Court on 27.01.2014. Being
pursued.
(ii) Loc 84,85,86,88 & 89 : Case filed by party in Court of Junior Civil Judge ,
Bangalore Rural district on 11.02.2014. Being pursued.
(iii) Loc 135,135A,135B, 135C & 136 : case filed in High Court by party (India
International School) on 19.06.2013. Being pursued.
(iv)At Loc 59 (for stub concreting): Case pending in High court since
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 39 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
25 Somananahalli Malur I & II lines - Jigani D/C 220 23 34 6 4 0 OCT-08 MAR-17 Line work short closed vide OM No CEE/TZB/SEE(O)/AE-3/15-16/925-31 dated:
12.08.2015.
final Notice issued to M/s ABB & M/s Deepak cables for termination of the
contract on 14.12.2015 by CEE, Tz. The contract is terminated on 25.01.2016.
The Joint inventory along with M/s ABB & M/s Deepak Cable completed.
Tendered on 10.05.2016 for balance work.
29 Vajamangala - Kadakola D/C 220 39 55 49 45 0 MAR-11 MAR-17 Work terminated on 19-Sep-15. Balance works to be retendered.
30 Vasanthanarasapura - Antharasanahally D/C 220 38 97 96 95 34 JAN-16 NOV-16 Work under progress.
Terminal Bay: Concreting of foundations: CT 6/6, CVT: 5/6, LA's: 5/6, Isolator:
7/8, breaker: 2/2 completed. Cable duct completed. Breaker erected. Mounting
structure erected and 2 Circuit Breakers erected.
31 Vasanthanarasapura - Madhugiri D/C 220 89 209 190 164 56 JUL-16 NOV-16 Work under progress.
32 Yermarus TPS - Bellary Pooling Station D/C 400 284 398 290 232 0 AUG-17 AUG-17 Work under progress.
33 Yermarus TPS - Gulbarga D/C 400 DEC-16 Detailed survey completed.
Estimate is being prepared.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 40 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 41 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 42 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
40 LILO of one Ckt of Ashta- Dewas line at 220 kV S/S D/C 220 66 104 18 APR-17 APR-17 Work Stopped.
Chapda S/S
41 LILO of one ckt of Bina - Gwalior at Datia D/C 220 10
42 LILO of one ckt Indore-II- Indore(400kV) at Indore D/C 220 35 21 20 4 FEB-17
(N/Z)
43 LILO of one ckt of 220kV Bhopal - Ashta line at D/C 220 52 89 89 89 52 JUN-16 Commissioned 06/16.
Mungaliyachhap s/s
44 LILO of one ckt of Bansagar (Tons) - Satna at Sirmour D/C 220 2
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 43 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
53 LILO pf 2nd Ckt. of Bansagar - Satna line at Kotar D/C 220 11 19 8 MAR-17 MAR-17 Work in progress.
220kV S/s.
54 Maheshwar (HEP) - Rajgarh (Dhar) D/C 220 230
55 Mandsaur - Marut Shakti Pool D/C 220
56 Moondi Pooling Point - Handia D/C 400 240
57 Morena (400kV S/s CWRTL Adani Group) - Sabalgarh D/C 220 115 173 42 JUN-17 JUN-17 Work in progress.
DCDS line
58 Morena - Malapur D/C 220 80
59 Nagda - Mandsaur D/C 400
60 Nagda - Ujjain line D/C 400 150
61 Neemuch - Ratangarh line D/C 220
62 Nigri TPP - Satna D/C 400
63 Pithampur - Badnawar DCDS D/C 400 150
64 Pithampur - Gandhinagar D/C 220 60
65 Pithampur - Moondi Pooling Point D/C 400 280
66 Pithampur -Depalpur D/C 220 71 129 120 63 JUN-17 JUN-17 Work stopped.
67 REVA TPP - Moondi Pooling Point D/C 400 70
68 Ratangarh(400 )- Ratangarh(132) D/C 132
69 Sailana - Ratlam D/C 220
70 Sailana(400) - Sailana(132) D/C 132
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 44 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 45 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
5 Balapur - Malegaon line D/C 220 140 228 96 40 0 MAR-17 Work in progress.
ROW Case Filed Order Awaited [9].
6 Bhandup - Borivali line on M/C tower (from loc. no. 20 S/C on 220 9 9 OCT-16 Commissioned 10/2016.
to 48) M/C
7 Boisar (PG)-Wada S/C on 220 53 211 173 165 28 MAR-07 DEC-17 The work stopped due to
D/C 1) Severe RoW
2) Forest ssue.
The existing contract closure proposal is approved by C.O.
The balance work shall be executed by placed new contract.
8 Boisar II-Borivali M/C 220 331 261 261 261 331 DEC-11 AUG-16 Ready for Commissioning 08/16.
9 Chandrapur II - Tadali (MIDC) D/C 220 81 89 74 70 34 DEC-16 Work in progress.
10 Chandrapur MIDC - Ballarshah (Ckt- I ) D/C 220 21 66 66 66 21 SEP-16 Commissioned 09/16.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 46 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
16 Kalwa - Borivali line M/C tower (from loc no. 20 to 48) S/C on 220 9 9 OCT-16 Commissioned 10/2016.
M/C
17 Kalwa-Borivali M/C 220 63 52 50 46 47 DEC-16 Forest permission received on 14.01.2013 for SGNP(81.42 Hec) and on
17.09.2012 for teritorial forest(117.28 Hec). ROW Problem:
Balance foundation Loc. No. 22, 17 (Police protection required for Loc. No. 22)
Balance ercetion - Loc. No. 11,12,17,18,19,22.
Outage will be availed in Sept-16 to carry out the balance work.
18 Kandalgaon - Dasturi SCDC line S/C on 220 75 236 92 0 0 JUN-17 Severe ROW problem. Slow progress by agency.
D/C
19 Kopargaon tap - Babhaleshwar M/C 220 144 117 90 2 0 APR-17 Work in progress.
ROW cases filed, order awaited [7].
20 Koradi II - Butibori D/C on 220 106 189 133 117 22 MAR-11 APR-17 Forest Involved: 10.36 Ha Received FRA certificate.
M/C GOI Nagpur informed queries to GOM, MSETCL & Nodal Nagpur on 07.06.16
National Highway (NH-69) crossing: Reminder letter given to NHAI
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 47 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
28 LILO of Bhugaon - Pusad at Wardha (PG) D/C 220 14 33 33 33 14 AUG-16 Commissioned 08/16.
29 LILO of Chandrapur - Parli ckt-I at Nanded D/C 400 80 113 113 113 63 DEC-16 Stringing work is balance due to non-availability of disc insulators.
(Khumbhargaon)
30 LILO of Kolhapur - Solapur at Elkud D/C 400 25 37 37 37 23 DEC-16 Work is in progress.
31 LILO of Pandharpur - Malinagar at Bhalwani S/S D/C 220 39 64 43 0 0 MAR-17 Work in progress.
32 LILO of Tarapur-Borivli at Boisar II D/C 220 16 15 15 12 11 MAR-07 MAR-17 The work is stopped due to
1) Severe ROW
2) Forest issue
33 LILO on 220 KV Pandharpur - Malinagar line for D/C 220 2 NOV-16 Commissioned 09/2016 (Late reported)
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 48 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
37 LILO on Both circuits of Waluj - Jalna at Taptitanda S/s M/C 220 32 39 33 27 0 APR-17 Work is in progress.
39 Malegaon - Kalwan D/C 220 97 179 167 149 36 MAR-17 Work in progress.
46 Tap on Babhaleshwar - Chalisgaon for Kopergaon S/S D/C 220 11 11 MAY-16 Commissioned 05/16.
(Ckt-II)
47 Uppalwadi - Mankapur M/C 220 32 28 1 0 0 DEC-17 ROW Locs. [16]
1. Case Filled Order
Awaited [16] : 2, 6, 9, 10,
11, 12, 13, 14, 15, 16, 17,
18, 19A, 19B, 26, 27
2. Order Received [0] :
Forest Locs. [3]
1. Forest Proposal
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 49 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 50 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
2 LILO of Agia - Nangal at Mendipathar D/C 132 5 9 9 9 5 JAN-14 Work completed and line charged on 28.01.2014.Line was commissioned with
the connected sub-station on 22.12.2015.
3 LILO of Mawlai - Cherra at Mawngap. D/C 132 10 16 15 15 5 MAR-17 No issue on forest clearance and no court cases.Work held up due to ROW
problem. The PHED,GOMe has complained and filed an FIR against Loc No. 3
to 8. Overall status is 90% completed.
4 LILO of NEHU - Khliehriat line at Mustem D/C 132 1 4 4 4 1 NOV-15 Work completed & commissioned on 20.11.2015.
5 LILO of NEIGRIHMS - Khliehriat at Lad Nongkrem D/C 132 6 7 6 6 0 MAR-17 No issues on forest clearance. Detail survey & check survey (1.6 km) for the 132
kV LILO is completed. Stub setting at 6/ 7 locations and erection of towers at 6 /
7 locations have been completed.
6 LILO of Rongkhon - Ampati at Praharinagar D/C 132 20 30 0 0 0 SEP-18 Survey works for 132 kV LILO is completed.
7 Mawngap - Sumer D/C 132 66 102 102 102 66 DEC-11 The line was completed and commissioned on 21.12.2011.
8 Nangalbibra - Agia S/C 132 92 316 316 316 92 AUG-13 Work Completed and line charged on 06.08.2013.
9 New Umtru - Umtru HEP S/C 132 1 3 1 0 0 MAR-17 As in Serial 3 below for New Umtru - EPIP-II line.
10 New Umtru HEP - Norbong (EPIP-II) D/C 132 2 8 8 8 2 MAR-17 No issues of forest clearance. The 132 kV line works have been completed
except for the terminal equipments at Umtru HEP (to be done by MePGCL) and
at EPIP-II sub-station.Tower erected is 8/8 locations. Stringing completed -
1.71ckm. The project is expected to be completed by March 2017.
11 Rongkhon S/S - Ampati D/C 132 33 102 101 98 19 MAR-17 No issues on forest clearance and no court cases. Work is presently under
progress.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 51 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
15 LILO of Rengali - Tarkera at Bonai D/C 220 6 17 17 17 6 DEC-16 Ready for Commissioning 12/2016.
16 LILO of one ckt of Indravati - Thervali line at Jaypatna D/C 220 32 66 0 0 0 FEB-18 FEB-18 Ongoing works
17 LILO of one ckt of Rengali - Tarkera at Deogarh D/C 220 60 JUN-13 My be deleted as the project is yet to be awarded
18 Malkangiri - Kalimela S/C 220 67 120 0 0 0 FEB-18 The CKM may be indicated as 67.254 CKM
19 Pandiabili PGCIL - Pratapasan line D/C 220 58 107 25 0 MAR-17 The CKM may be indicated 58.30 CKM
20 Restoration of IB - Lapanga line D/C 400 38 62 56 54 SEP-16 MAR-17 The line CKM may be corrected as 38 CKMs.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 52 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 53 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
6 Kuwari Pass (Pipalkoti)-Karanprayag -Srinagar D/C 400 184 0 0 0 0 DEC-16 Retendering is under Process.
7 LILO of Muzaffarnagar - Vishnu Prayag at Kuwari D/C 400 2 6 0 0 0 AUG-16 Contract has been awarded on 06.05.11 to M/s TATA Project Ltd. contract
Pass (Pipalkoti) effective date is 03.09.11 and will be taken after award of 400 KV Pipalkoti S/s.
Total Progress 11%.
8 LILO of Baramwari - Srinagar at Singoli Bhatwari D/C 220 5 0 0 0 0 OCT-16 Construction of line as per Schedule of construction of Singoli HEP and to be
constructed by L&T.
9 LILO of Kashipur - Pantnagar line at Jaffarpur D/C 220 12 MAR-17 Tendering is under process.
10 LILO of Loharinagpala - Koteshwar at Pala - Maneri D/C 400 10 0 0 0 0 The work at Pala Maneri HEP stopped as per GOI order.
11 LILO of Mori - Dehradun line at Nogaon D/C 220 10 MAR-18 Construction of line as per connectivity schedule of generatiors in Yamuna Valley
12 LILO of Nandprayag -Karanprayag at Langrasu D/C 220 16 0 0 0 0 NOV-17 Construction of line as per Schedule of construction of Langrasu.
13 LILO of Rishikesh-Dehradun at Harrawala D/C 220 1 0 0 0 0 AUG-16 Tendering is under process.
14 LILO of Roshanabad - Puhana line at Imlekhera D/C 220 10 MAR-17
(Pirankaliyar)
15 LILO of Roshnabad -Puhana at Pirankaliyar S/S D/C 220 10 0 0 0 0 MAR-17 LoA is to be issued.
16 LILO of Vyasi HEP - Dehradun at Dehradun (PG) D/C 220 70 0 0 0 0 MAR-17 Tender has been floated.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 54 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
23 Twin Zebra - Dehradun (PGCIL) D/C 220 12 21 20 19 9 JUL-16 Tower foundation-20/21 and Tower erection-19/21.Total progress-90%
24 Vishnugad - Kuwari Pass (Pipalkoti) D/C 400 40 62 0 0 0 DEC-16 Contract has been awarded on 06.05.11 to M/s TATA Project Ltd. contract
effective date is 03.09.11 Forest case prepared for 43.694 Hect. and submitted
to DFO Joshimath/ DM Chamoli. NOC from 04 Nos. village panchyat Naurakh
Agthalla, Tangri Talli and Tangri Malli is pending. Matter is being pursued
GOU/District Administration.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 55 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
11 LILO of one ckt. 220KV Nakodar - Rehanajattan line at D/C 220 52 94 90 44 DEC-16 MAY-17 Forest case pending.Railway case approved.
220KV Hoshiarpur
12 LILO of one ckt. of 220KV Humbran - Ferozpur Road D/C 220 25 41 34 24 15 DEC-16 MAY-17 Work in progress. Forest case pending
(Ludhiana) at 220KV Ladowal
13 Ludhiana - Doraha D/C 220 28 95 95 84 18 MAY-17 Work is in progress.Committee formulated for sale of trees
14 Makhu - Algaon D/C 220 101 159 142 113 30 MAY-17 Work is in progress. Forest & Railway cases pending. Initially line length in RFD
taken as 60 Ckm. Now the line length is 101 Ckm.
15 Makhu - Rashiana D/C 220 92 146 131 113 55 MAY-17 Work is in progress.
16 Malout - Abohar D/C 220 30 95 67 25 JUN-17 Work is in progress. Forest pending and Railway case cleared.
17 Moga - Mehal Kalan D/C 220 105 170 163 161 74 MAR-17 Work in progress. Forest case of Ludhiana and Sangrur In Principal approval
received. Ferozepur case pending with DFO.
18 Mukatsar - Kotkapura D/C 220 76 129 118 115 12 MAR-17 Forest cases pending with DFO Ferozepur. Railway case approved.
19 Mukatsar - Malout D/C 220 47 83 81 79 1 MAR-17 Work is in progress.
20 Nabha -Bhawanigarh S/C on 220 21 80 76 76 15 DEC-16 Work is in progress.Forest case - Patiala case approved. Sangrur case pending
D/C with PCCF Mohali.
21 Nakodar - Ladhowal D/C 220 67 122 118 109 18 MAY-17 Work is in Progress.Forest case- Ludhiana case approved. Phillaur case pending
.Railway case - one case approved and one case pending.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 56 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 57 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
3 Akal (1)- Jaisalmer -2 D/C 400 50 MAR-17 KFW funded scheme. Tech feasibility of line is being reviewed.
4 Akal -Jodhpur (New) D/C 400 480 618 592 549 260 JUL-17 W.O awarded to M/S TATA Project Ltd.
5 Anta -Kota (PG) (Extension) D/C 400 45 135 116 115 31 MAR-17 W.O. awarded to M/s Unique Structures & Towers Ltd., Bhilai (W.O from M/S
Trans Era withdrawn.) Forest involved. Permission awaited.
8 Bhadla-Bikaner D/C 400 379 511 509 500 268 MAR-17 W.O. awarded to M/S Unitech. Forest involved . Permission to work received on
10.11.16.
11 Bhinmal - Sayla line D/C 220 78 132 132 132 78 JAN-12 JUL-16 Commissioned 06/16. (Late Reported).
12 Bikaner -Sikar (PG) D/C 400 420 448 284 185 MAR-17 PPP mode. W.O. awarded to M/S KEC BKNR SKR Tr.Ltd.
13 Chatrail-Ramgarh D/C 220 90 146 146 146 90 AUG-16 Ready for Commissioning 08/16.
14 Chittorgarh - Sawa D/C 220 51 91 91 91 53 AUG-16 Ready for Commissioning 08/16.
15 Chittorgarh-Bhilwara D/C 400 99 134 134 131 813752 MAR-17 "W.O. awarded to M/s SPML Infra.ROW problem at loc no. 2&3.
"
18 Extension of Bikaner- Barsinghsar at Barsinghsar TPS S/C 220 3 10 10 10 3 APR-09 DEC-16 Ready for commissioning 12/2016.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 58 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
20 Indira Gandhi Nagar -Sitapur (Upgradation) D/C 220 17 29 29 29 17 DEC-16 Ckt-I from 220 kV GSS I.G. Nagar-132 kV GSS Sitapura-220 kV GSS Sitapura
already charged on 132 KV level and will remain charged on 132 KV Voltage
level as per the scheme.
Ckt.-II 220 KV GSS I.G. Nagar-220 KV GSS Sitapura work almost completed.
Permission of shutdown of PGCIL lines at I.G. Nagar end awaited which is
required for line crossing. Ckt. II is expected to be completed and charged on
220 KV voltage level upto Jan'17
21 Jaipur North (400 kV GSS) - Manoharpur (Turnkey) D/C 220 80 141 137 134 74 JAN-13 MAR-17 Forest involved . Clearance awaited.
22 Jaisalmer -2 -Barmer D/C 400 260 MAR-17 KFW funded scheme. W.O. awaded to M/s TATA Project Ltd.
26 Jodhpur (New) - Barli (TK) D/C 220 90 158 158 158 89 APR-10 JAN-17 Work order awarded to M/s R.S. Infra Noida.
27 Jodhpur (New) - Jhalamand (TK) D/C 220 40 64 64 63 35 APR-10 Work order awarded to M/s R.S. Infra Noida.ROW problem at Loc no. 8/0
28 Jodhpur - NPH Jodhpur D/C 220 12 Severe ROW problem. Revised proposal for OH line and cable under approval.
29 Jodhpur CHB - Soorsagar D/C 220 16 31 19 0 0 JAN-17 W.O. awarded to M/s Classic Coal, work stopped due to ROW problem.
30 Kalisindh TPS - Bhawanimandi S/C 220 34 108 108 106 7 JAN-17 W.O awarded to M/s Kay Cee Energy & Infra Private Limited.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 59 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
38 LILO of Chandan- Pokaran at Pokaran D/C 220 20 MAR-17 KFW funded scheme. W.O. Is to be awarded .
39 LILO of Jodhpur (GSS) - Jodhpur at Barli D/C 220 1 6 6 6 1 APR-16 Commissioned 04/16.
40 LILO of Jodhpur - Merta line at Jodhpur (New) D/C 400 99 140 140 140 99 AUG-09 JUN-16 Commissioned 06/16.
41 LILO of Jodhpur -Merta at Pooling station Badla D/C 400 390 547 522 452 114 MAR-17 ADB funded scheme. W.O. awarded to M/s TATA Project.
42 LILO of Kankroli (PG) -Debari at Amberi D/C 220 30 60 60 60 30 AUG-16 Ready for Commissioning 08/16.
43 LILO of Kota (PG) -Bhilwara at Mandalgarh D/C 220 40 76 76 76 40 APR-16 Commissioned 04/16.
44 LILO of PS 1- Bajju at PS 1/Bajju D/C 220 20 MAR-17 under KFW
45 LILO of VKIA - Kukas at Jaipur (North) (Turnkey) D/C 220
46 LILO of both ckts Ramgarh GTPS -Dechu at Ramgarh D/C 220 1 1 1 1 1 DEC-16 Ready for commissioning 12/2016.
47 LILO of both ckts Ramgarh GTPP -Dechu line at D/C 220 20 MAR-17 w.o. is to be awarded
Pokaran
48 LILO of one ckt Jaipur (South) to Chaksu at Goner D/C 220 58 101 101 101 58 OCT-16 Commissioned 10/2016
49 LILO of one ckt Raj west -Jodhpur at Jodhpur (New) D/C 400 102 138 138 138 102 APR-16 Commissioned 04/16.
50 LILO of one ckt of Ramgarh GTPS - Dechu at D/C 220 33 60 60 60 33 MAR-17 Work under progress expected to be commissioned upto Mar'17
Amarasagar
51 Mansarovar - Chambal (Cable System) D/C 220 5
52 Modak - Bhawanimandi S/C 220 35 123 123 123 40 JAN-17 W.O awarded to M/s Kay Cee Energy & Infra Private Limited.
53 PS 1 /Bajju -Bhadla D/C 220 66 107 107 107 66 AUG-16 W.O. awarded to M/s RS Infra. Line charged on 33 KV on dt 30.06.16
54 Phagi GSS (Jaipur) - Heerpura line D/C 400 104 126 126 126 104 SEP-12 DEC-16 Commissioned 11/2016 (Reported Late)
55 Phagi(Jaipur south-765 kV)-Ajmer line D/C 400 210 283 276 252 31 SEP-12 MAR-17 W.O awarded to M/s Varsana Ispat.(W.O. withdrawn from M/s. GET) .
Two nos. of NHAI crossing awaited.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 60 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
57 Ramgarh (Jaisalmer)-Akal (Jaisalmer ) D/C 400 200 278 273 264 120 MAY-17 ADB funded scheme. W.O awarded to M/S TATA Project Ltd.
58 Ramgarh -Bhadla D/C 400 320 446 416 321 120 MAR-17 W/O awarded to M/s SEW Hyderabad
59 Sirohi-Pindwara S/C 220 25 106 64 MAR-17 W/O awarded to M/S Moji Construction , Jpr. Forest involved . Clearance
awaited.
60 Sitapura- Sitapura (Existing) (Upgradation) D/C 220 1 3 3 3 1 DEC-16 commissioned 07/2015 (Late Reported)
61 Soorpora - Banar line D/C 220 21 35 35 27 12 AUG-11 JAN-17
62 Suratgarh TPS - Babai ( Jhunjhunu) D/C 400 480 676 611 572 288 JAN-13 JAN-17 Work order awarded to M/s Aster Chennai.Case for diverting route due to air
force approved, work under progress.
63 Suratgarh TPS- Bikaner D/C 400 340 MAR-17 PPP mode. Work order awarded to M/s Adani Trans Raj Ltd.
64 Undoo - Pokaran D/C 220 140 KFW funded scheme . W.O. is to be awarded.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 61 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 62 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
12 Karaikudi - Kamudhi D/C 400 220 319 319 319 220 DEC-16 Ready for commissioning 12/2016.
13 Karaikudi - Sembatty S/C 220 137 559 558 548 132 DEC-11 MAR-17 One. no. ROW issue at Loc.249. Letter addressed to District Collector/Madurai
for Police Protection and for enter upon permission.
14 Karamadai - Common Point S/C 220 21 80 80 80 21 AUG-15 DEC-16 Commissioned 07/2016 (Late Reported
15 Karamadai - Pushep D/C 220 4 load flow analysis is under process.This may be deleted.
16 Kavanoor - Karaikudi (Existing) D/C 220 170 327 325 322 100 MAR-15 MAR-17 Work under progress. Railway crossing involved at 2 locations.
17 Kayathar - Thennampatty D/C 400 112 MAR-18 Retender floated with due date for tender opening on 07.01.17
18 Kayathar - Tuticorin S/S D/C 220 130 228 201 174 57 DEC-16 MAR-17 Work under progress
19 Kilpauk - CMRL Central Jail S/C 220 10 To be retenderd since M/s.EPIL was black listed. There is a case in the court
vide MP.No:1 of 2015 and WP No:21319 of 2015. Stay vacation Petition filed
vide MP.No: 2 of 15.
20 Koladi - PH Road (Alamathy - Koyembedu) D/C 220 28 69 69 69 25 APR-12 MAR-17 Works are under progress. Koladi - PH Road: OH Line work under
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 63 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
21 LILO in 2nd Ckt of MTPS -III - Thiruvalam at D/C 400 1 OCT-16 Line work completed. Linking with the terminal tower will be taken up with the
Dharmapuri commissioning of Dharmapuri 400 kV SS.
22 LILO in Ist Ckt of MTPS - III - Thiruvalam at D/C 400 1 OCT-16 Line work completed. Linking with the terminal tower will be taken up with the
Dharmapuri commissioning of Dharmapuri 400 kV SS.
23 LILO of 230 kV Chekkanurani - TTPS (feeder-I) at 230 D/C 220 1 5 5 5 1 JUL-16 SEP-16 Commissioned 09/16.
kV Kinnimangalam
24 LILO of Arasur - Karamadi at Shenbagapudur S/S D/C 220 90 126 120 115 28 AUG-15 MAR-17 tub setting and tower erection is under progress. ROW issues involved at
Locations 33-35. Enter upon permission awaited from District
Collector/Coimbatore and from District Collector/Erode for Loc.106. Further in
some locations land owners objection involved and is being solved.
25 LILO of Arasur - Palladam at Tiruppur D/C 220 24 45 40 36 7 AUG-15 MAR-17 Work under progress. 13 nos. Mono pole tower involved.
26 LILO of Chekkanurani - Kayather at Kinnimangalam D/C 220 12 5 5 5 JUL-16 MAR-17 Work under progress
27 LILO of Deviakurichy - Pudhansanthai at Valayapatty D/C 220 52 96 96 96 52 JUN-16 Ready for Commissioning 06/16.
28 LILO of Existing Ingur - Palladam at Kurukathi S/S D/C 220 62 128 128 128 62 DEC-16 Ready for commissioning 12/2016.
29 LILO of Existing Paramathi - Alundur at Valayapatty D/C 220 60 116 112 99 5 FEB-17 Work under progress
30 LILO of Existing SP Koil - Thiruvalam at Kanchipuram D/C 220 1 3 3 3 1 JUN-16 Ready for Commissioning 06/16.
S/S
31 LILO of Existing Sunguvarchatram - Arni at D/C 220 16 40 40 40 16 JUN-16 Ready for Commissioning 06/16.
Kanchipuram S/S
32 LILO of Existing Trichy - Perambalur at D/C 220 54 102 102 102 54 DEC-16 Ready for commissioning 12/2016.
Jambunathapuram S/S
33 LILO of Gummidipoondi - M/s Michelin Tyres line at D/C 220 2 2 Commissioned 04/16.
Thervoykandigai 400 kV S/S
34 LILO of Kalpakkam - Arani at Purisai D/C 220 24 49 49 49 24 APR-16 JUN-16 Ready for Commissioning 06/16.
35 LILO of Karaikudi - Pugalur feeder-I at Vellalaviduthi D/C 400 190 APR-17 Estimate is under scrutiny for floating tender
36 LILO of Kayathar - Karaikudi line at 400 kV D/C 400 223 223 SEP-16 Commissioned 09/16.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 64 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
39 LILO of Mylapore - Taramani at RA puram S/s D/C 220 7 Cable Laying and Jointing work completed
40 LILO of Myvady - Pugalur at Kurukathi D/C 220 62 124 98 61 5 MAR-17 Work under progress. Objection encounted at sevaral locations.
Enter upon permission obtained from District Collector/Tiruppur and work under
progress. Action is being taken for getting entry permission from District
Collector/Karur.
41 LILO of Paramathi - Alandur at Valaypatty D/C 220 60 116 112 99 5 FEB-17 work under progress
42 LILO of Pugalur - Kalivanthapattu line at Ariyalur 765 2xD/C 400 80 28 APR-17 APR-17 Work awarded to M/s Gammond India on 24.09.2016. Tower design is under
KV s/s process.
43 LILO of Siruseri - Taramani (Kids park) line at 400 kV D/C 220 5 5 JUN-16 Ready for Commissioning 06/16.
Ottiyambakkam S/S
44 LILO of Siruseri - Tharamani at Sholinganallur D/C 220 5 16 16 16 5 DEC-16 Ready for commissioning 12/2016
45 LILO of Sriperumbadur- Arni at Sunguvarchatram D/C 220 12 28 10 3 0 DEC-10 MAR-17 Due to long penging Court case, revised route is under study.
46 LILO of Sriperumbudur - Koyambedu at Guindy (UG S/C 220 18 0 0 0 0 MAR-17 Work already awarded to M/s.CCI and yet to be commenced. Based on the
Cable) revised approval, route approval and estimate is under preparation.
47 LILO of Sunguvarchatram - Alamathy at Vellavedu D/C 400 16 OCT-17 LOA is under perusal.
(Guindy)
48 LILO of Thatchankurichi - Eachangadu at Poiyur D/C 220 20 52 47 42 6 APR-14 MAR-17 Work awarded on 03.09.15.Stup setting work is under progress.Railway crossing
approval to be obtained for 2 location.
49 LILO of Thiruvarur - Kadalangudi at Kumbakkonam D/C 220 40 92 67 42 MAR-17 Work awarded and under progress
50 LILO of Tonidapet - Mylapore at TNEB HQ (UG Cable) D/C 220 1 0 0 0 0 DEC-17 Cable already laid. Termination to be done
51 LILO of Tuticorin Sipcot - Checkanurani line at D/C 220 13 13 JUN-16 Ready for Commissioning 06/16.
Savasapuram S/s
52 LILO of both ckt of MTPS stage III - Arasur (PGCIL) at M/C 400 124 95 95 95 124 APR-16 AUG-16 Commissioned 08/16.
Karamadai
53 LILO of existing Othakalmandapam feeder-I at D/C 220 2 MAR-17 Stringing will be taken up on commisisoning of Aaikadavu 400 kV SS.
sanctioned Anaikadavu 400 kV S/S
54 LILO of one ckt Thppagundu - Anaikadavu at D/C 400 30 Tender opened on 08.12.16 and under process
Udumalpet
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 65 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
58 MTPS St.III - Singarpet D/C 400 200 0 0 0 0 JUN-16 Dharmapuri 400 KV SS has been sanctioned. Hence, work will be taken up
according to that BP.
59 Manali - Korattur D/C 400 11 20 14 13 2 APR-14 JAN-16 Work under progress
60 Manali - Pulianthoppe D/C 400 9 APR-17 Note being put up to BOARD for specification approval and to call for tender
61 Manali - Pulianthoppe S/S S/C 400 40 APR-17 Note being put up to BOARD for specification approval and to call for tender
62 Manjakuppam - Korattur D/C 400 22 APR-17 Draft specification under preparation for obtaining Concurrence from JICA.
63 Muthuramlingapuram - Kavanoor (Kamudhi) D/C 220 130 229 229 229 123 MAR-17 Works are nearing completion.One ckt radially energised from Kavanoor end.
64 Mylapore - Tharamani (UG Cable) D/C 220 25 0 0 0 0 APR-14 MAR-17 Work under progress. Cable laying work completed in 26/26 sections and
136/150 Joints. 18/24 nos. Termination at Mylapore end completed.
Balance terminations work under progress.
65 Neyveli - Eachengadu S/S S/C 220 34 149 149 149 34 APR-14 DEC-16 Commissioned 12/2016 (Loc. 15 to Loc. 130)
66 North Chennai 765 KV PS - Ariyalur 765 KV s/s D/C 765 380 APR-19 APR-18 Estimate is under scrutiny.
67 Ottiyambakkam - Kits S/s D/C 220 24 50 47 44 21 MAR-17 Work under progress.Reserve Forest clearance involved in 4 locations and
proposal forwarded.
68 Ottiyambakkam - Omega D/C 220 70 150 141 141 32 APR-14 MAR-17 works are under progress. 6 Locations under ROW issue.
69 PH Road - Koyambedu (UG Cable) D/C 220 1 0 0 0 0 APR-12 DEC-16 Laying and Jointing work completed
70 Palladam - Ingur S/C on 220 62 249 239 209 34 APR-13 MAR-17 Tower loc bet 160-190 court case WP NO 21202/2015 at High
D/C court,Chennai.Erode collector enquiry conducted on 27.06.16. Orders to
executed the work in original route has been received. Work will be taken up.
71 Pulianthope - Pulianthoppe D/C 400 11 APR-17 Note being put up to BOARD for specification approval and to call for tender
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 66 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 67 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 68 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
21 LILO of Pendurthy - Garividi at Garividi D/C 220 140 202 29 0 0 Works are under progress
22 LILO of Podili - Nellore at Atmakur D/C 220 80
23 LILO of Shadnagar - Yeddumailaram at D/C 220 12 19 19 19 12 MAR-14 Shadnagar - Yeddumailaram line commissioned on 07.03.2014
Yeddumailaram
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 69 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
28 N P Kunta PS - 400 kV N P Kunta (PGCIL) S/S D/C 220 4 4 APR-16 Commissioned 04/16.
29 Narketpally_Suryapet S/C on 220 60 DEC-16
D/C
30 Narnoor s/s - Gani S/S D/C 400 32 50 50 50 32 NOV-16 JAN-17 All the works are completed except 0.11 Ckm of stringing of the line
31 Narsapur-Doultabad S/C 220 15 DEC-16
32 Narsapur-Manoharabad S/C 220 15 DEC-16
33 Nirmal-Nandipeta S/C 220 20 DEC-16
34 Nizamabad-Janakampeta S/C 220 10 DEC-16
35 Numa - Juyarni D/C 400 112 166 165 162 70 JUN-16
36 Oddugudem-Koyagudem D/C 220 20 DEC-16
37 Oglapur(Warangal 400 kV SS)-Warangal 220 kV SS D/C 220 36 DEC-16
38 Peddajanagampalli - Chittoor line D/C 400 213 321 320 313 148 MAY-15 FEB-17
39 RTPP (Muddanur) - Chinakampalli D/C 220 121 121 JUN-16 Commissioned 06/16.
40 Rayalaseema TPP - Peddajamgampalli line D/C 400 216 321 308 299 150 MAY-15 FEB-17
41 Rentachintala - Macherla S/S S/C 132 17 58 58 58 15 MAR-13 Commissioned 27.03.2013
42 Rentachintala - Nagarjuna Sagar Plant S/C 132 16 34 34 34 16 AUG-14 Commissioned 08/14.
43 Sattenapalli - Guntur D/C 220 110
44 Sattenapalli 400kV s/s - Podili s/s D/C 400 220 299 183 126 JUN-17 Works under progress.
45 Somayajulapalli - Gani/Panyam S/S D/C 220 20
46 Tungabhadra river - Yemmiganur D/C 400 43 57 57 57 43 JUL-15 NOV-16 commissioned 11/2016.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 70 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 71 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 72 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
34 Singareni - Nirmal D/C 400 298 174 JUN-17 Work awarded to L&T/KEC in 9/2015 with completion period of 15 months.
35 Suryapet - Nandiwanaparthi line D/C 400 240 343 343 343 240 AUG-16 Ready for Commissioning 08/16.
36 Suryapet - Shankarpalli D/C 400 462 658 654 647 385 SEP-16 Severe ROW problems
37 Vadarevu - Amangal S/C 765 240 0 0 0 0 AUG-16
38 Veltoor - Thungabhadra River (Q) line D/C 400 147 200 200 200 147 NOV-16 Commissioned 11/2016.
39 Veltur-Thimmajipet D/C 220 80 127 127 122 42 AUG-16
40 Yeddumailram - Pargi D/C 220 135 137 137 137 90 Works are in progress
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 73 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 74 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 75 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 76 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
54 LILO of 220 kV Mainpuri (PG) - Mainpuri line at D/C 220 68 68 SEP-16 Commissioned 09/16.
Sirsaganj
55 LILO of 220 kV Orai - Mainpuri line at Bah S/S D/C 220 157 258 258 258 157 SEP-16 Commissioned 09/16.
56 LILO of 220 kV Parichha - Banda line at Mahoba D/C 220 10 10 JUN-16 Commissioned 06/16.
57 LILO of 400 kV Agra (UP) - Muradnagar 400 kV S/C D/C 400 156 219 219 219 156 AUG-16 SEP-16 Commissioned 09/16.
line at Agra (UP) 765/400 kV S/S
58 LILO of Agra - Muradnagar at Mathura D/C 400 64 88 88 86 20 AUG-16 JAN-17 Foundation work complete, Erection & Stringing work in progress.
59 LILO of Agra - Muradnagar at Kurja D/C 4.4
60 LILO of Aligarh - Sikandarabad D/C 400 258 258 258 188 JAN-17 Almost complete.
61 LILO of Anpara - Mau at Ghazipur D/C 400
62 LILO of Azamgarh - Sultanpur at Tanda D/C 400 120 Work not Started.
63 LILO of Bhauti - Orai at Sikandara D/C 220 90 104 95 31 0 JAN-17 WIP.
64 LILO of Bhognipur - Mbd at Bilhaur D/C 765
65 LILO of Ghatampur - Mbd at Sandila D/C 765
66 LILO of Gorakhpur - Basti at Bansi S/C 220 40 155 151 69 0 JAN-17 04 no Erec gangs working in the meeting on 25.11.2016, Firm assured to
complete line by 15.01.17
67 LILO of Harduaganj - Mainpuri S/C line at Sikandra D/C 220 3 3 JUN-16 Commissioned 06/16.
Rau
68 LILO of Mainpur (765) Aligarh (400) at Jwrpur D/C 400
69 LILO of Mainpur - Etah at Jwrpur D/C 220
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 77 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 78 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 79 of 91
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
12 LILO of Jeerat - KTPS 400 kV S/C at N. Chanditala D/C+S/ 400 12 22 22 22 12 FEB-17 JAN-17 Completed
C
13 LILO of Jeerat - Kasba at Barasat D/C on 200 8 11 5 2 0 FEB-17 APR-17
M/C
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 80 of 91
As on 31-DEC-2016
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 1 of 11
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
5 Malerkotal - Amritsar line D/C 400 298 414 409 405 238 SEP-16 JAN-17 a)Affected Forest Approval (Punjab Portion) due to NGT Order: Stage I approval
granted on 16th Sept 2016, which is subject to final Order of Honble NGT in the
subjudice matter of OA 161 & 162 of 2016, regarding tree cutting in the state.
Even though the Stage I Forest Clearance is received, the tree cutting is not
being allowed due to NGT Order.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 2 of 11
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 3 of 11
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 4 of 11
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
2 LILO of on Ckt of Raigarh - Raipur at Avantha D/C 400 10 22 22 22 10 DEC-13 Interim arrangement.
Bhandar (Korba west ) TPS
KVK ENERGY PVT. LTD. (KVK)
1 LILO of Mendasal - Baripada at Nilanchal TPP D/C 400 16 0 0 0 0 JUN-16 Work yet to Start.
Kudgi Transmission Company Limited (KTCL)
1 Madhugiri - Bidadi D/C 400 185 256 256 256 185 DEC-15 AUG-16 Commissioned 08/16.
2 Narendra (New) - Madhugiri D/C 765 758 867 867 867 758 DEC-15 SEP-16 Ready for Commissioning 09/16.
LANCO ENERGY (P) LTD,. (LEPP)
1 Babandh TPP - Angul Pooling Station D/C 400 48 72 0 0 0 DEC-16 Work yet to start.
2 LILO of Seoni - Wardha at Lanco Vidarbha TPS D/C 765 15 16 MAR-17
3 Lanco Amarkantak - Champa Pooling Station D/C 400 95 158 96 12 0 JUN-16 .
4 Phata HEP-Baramwari (Rudrpur) D/C 220 8 20 0 0 0 DEC-16
5 Routing of one circuit of Jorthong - New Melli via D/C 220 MAR-19 Work in generation project is stopped for since 2013.
Rangit - IV
6 Teesta VI HEP - Rangpo Pooling Station D/C 220 25 Detail survey completed section 164 approval received. Work yet to started.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 5 of 11
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 6 of 11
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 7 of 11
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
11 OPGC - Jharsuguda D/C 400 110 152 36 8 JUL-17 JUL-17 Change In Law-Additional 0.5% Krishi Kalyaan CESS has been included in
Service tax w.e.f 1st June 2016 same has been intimated to all LTTCs. Delay in
getting Section 164. PTCC Clearance pending with CEA (PTCC). Severe RoW
issues in Loc No. between 32/0 33/1 and 58/0 61/0 in Tehsil Jharsuguda and
Lakhanpur in Dist Jharsuguda.
12 Prithala - Kadarpur D/C 400 MAY-19 NOV-17 Transmission Licensee granted by CERC. Tariff Adoption done by CERC.
13 Purulia PSP (WB) - Ranchi (PG) D/C 400 223 301 301 301 223 APR-16 DEC-16 Line Commissioned on 7th Jan 2017.
14 RAPP - Shujalpur line D/C 400 402 521 521 521 402 FEB-16 JUN-16 Ready for Commissioning 06/16. (RTCL).
15 Samba - Amargarh line D/C 400 574 783 658 458 214 OCT-18 JUL-17 Force majeure events due to Bandh, Shutdown, Curfew, Bad Law & Order
Situation in J&K & there has been 58 days execution days lost till date, and
suspension of work due to Armed Conflict & Blockade continued from 08-07-
2016, notices sent to all LTTC's. Wild Life proposal is pending with NBWL.
Change in Law- i. Additional Swachh Bharat [email protected]% has been added in
Service Tax w.e.f 15th Nov.2015 as per Ministry of Finance Govt. of India
Gazette Notification 21/2015-Service Tax & 22/2015-Service Tax dated 06th
Nov. 2015 ii. Additional 0.5% Krishi Kalyaan CESS has been included in service
tax w.e.f 01.06.2016 iii. Increase in J&K [email protected]% to 14.5% dated w.e.f
01.07.2016; same has been intimated to LTTC's.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 8 of 11
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
9 Mainpuri - Bara Ckt-I S/C 765 375 889 613 346 0 MAR-17
10 Mainpuri - Bara Ckt-II S/C 765 377 899 899 899 377 DEC-16 Ready for commissioning 12/2016
11 Mainpuri - Unnao (Quad) S/C 765 188 449 380 274 0 MAY-16
12 Meja - Bara D/C 400 64 83 83 83 64 FEB-16 Completed and commissioned
13 Rewa Road - Karchana D/C 400 58 102 OCT-16 Karchana gantry not defined.
14 Tanda - Gonda line D/C 400 188 241 97 54 0 JUL-16
TALCHER TRANSMISSION CO. LTD. (TTCL)
1 Behrampur - Gazuwaka D/C 400 290 OCT-12 SEP-13
2 Talcher II - Behrampur D/C 400 220 OCT-12 SEP-13
3 Talcher II - Rourkela D/C 400 161 OCT-12 SEP-13
TEESTA URJA LTD. (TUL)
1 Teesta III - Kishanganj D/C 400 430 591 501 458 248 MAY-17 RoW matter of balance stringing of 0.5 km of priority portion up to Rangpo S/S,
the matter has been taken up with the state govt and a committee headed by
District Commissioner is working on resolution of
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 9 of 11
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
2 Teesta III - Rangpo line D/C 400 71 98 98 98 70 NOV-16 One ckt of Teesta-III - Rangpo completed by TVPTL, IInd ckt is expected to be
completed soon. Work at one location is affected due to RoW issue.
TORRENT POWER LTD (TOR. POW. (UNOSUGEN))
1 DGEN - Vadodara D/C 400 Work awarded to M/s Instalaciones. Inabemsa. Spian on May 2014. Route
changed after survey observations.
2 DGEN TPS - Bharuch/Dahej Pooling Station D/C 400 .
3 Navseri - Bhasten D/C 220 Work awarded to M/s Instalaciones. Inabemsa. Spian on May 2014. Route
changed after survey observations.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 10 of 11
Construction progress Status
Ckts Total Target Date
Name of Towers
Sl (S/C) Voltage Lengt
Transmission STC TE STG Revised/ Remark
No & Level h TL
Lines (Nos) (Nos) (cKM) Schedule Anticipate
(D/C) cKM (Nos)
d
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 11 of 11