Manufacturing System Flow Analysis: Ron@sie - Arizona.edu

This document summarizes a presentation on manufacturing system flow analysis. It discusses how to analyze flow through cell systems, apply Little's Law to define the relationship between work in process (WIP), production rate, and flow time. It also covers how to analyze the tradeoffs of using transfer batches versus process batches, strategies for cross-training workers, and how to evaluate the performance of both open and closed manufacturing systems. The presentation provides references for further reading on lean production system design and analysis.

Uploaded by

jaga_desh86
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views

Manufacturing System Flow Analysis: Ron@sie - Arizona.edu

This document summarizes a presentation on manufacturing system flow analysis. It discusses how to analyze flow through cell systems, apply Little's Law to define the relationship between work in process (WIP), production rate, and flow time. It also covers how to analyze the tradeoffs of using transfer batches versus process batches, strategies for cross-training workers, and how to evaluate the performance of both open and closed manufacturing systems. The presentation provides references for further reading on lean production system design and analysis.

Uploaded by

jaga_desh86
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 30

Manufacturing System

Flow Analysis
Ronald G. Askin
Systems & Industrial Engineering
The University of Arizona
Tucson, AZ 85721
[email protected]

October 12, 2005


How Many IEs Does It Take to
Change a Light Bulb?
n?
• One to Work Sample to Detect Burned out Bulbs
• One to Flowchart the Process
• One to Schedule the Maintenance
• One to Supervise the Maintenance Task
• One to Implement a Process Improvement Plan/Kaizen
Event
• One to Determine Optimal Lumens for Replacement Bulb
• One to do an Economic Analysis of Buying Longer Life
Bulbs
• …
Overview of Session
• The Modern (Lean) Factory
• WIP vs. Flowtime & Throughput (Little’s Law)
• Transfer Batches vs. Process Batches (Lot-streaming)
• Cross-Training (Balancing and Buckets)
• Performance Evaluation – Open & Closed Cells
1. Factory Flow Thru Cell System

Gears Chassis Assembly

Shafts Cards Frame


Flow in a Cell

J. T. Black, Design of the Factory with a Future, 1991


Cell Independence (Burbidge)
• Dedicated Team of (Compatible) Workers
• Dedicated Set of Machines
• Specified Set of Parts/Products
• Dedicated Space for Operations
• Common Goal and Evaluation
• Independence of Success
• Ideally 7-10 Members
2. Little’s Law: Defining Rule for Flow

L = λW
(N = XT)

WIP = Prod. Rate x Flow Time


Theoretical Profile!

Capacity
Deterministic
Production

Probabilistic (Exponential)
N=XT

WIP
Empirical Profile
Little's Law and Chaos

12

10
Remember
N = XT
8
Throughput

6
Deterministic

Exponential
4
Empirical

0
0 10 20 30 40 50 60 70 80 90
WIP

10 stages, µ = 1
Questions?
• What happens when we release jobs to a
busy shop floor?
• What happens when we reduce variability?
Typical Scenario:
High Utilization, So Jobs are Late,
Therefore Release More Jobs Early

L=λW (or N=XT)


1. λ high implies ∆λ small;
2. Since L increases, W increases;
3. As W (lead time) increases, tempted to release
jobs even earlier
4. Congestion and interference reduce throughput
Reducing Variability

General Arrivals (λ) and Service (S)

E (ThroughputTime) = E (Wq ) + E ( S )
ρ (1 + C
2 2
s ) ⋅ (C 2
a +ρ C
2 2
s )
E (Wq ) ≈
1 + ρ 2 Cs2 [ 2λ (1 − ρ )]
ρ = λ ⋅ E (S )
(ρ = X ÷ Capacity)
Question: How Far Is the Blue (Random) Line
from the Purple (Deterministic) Line?
• ρ = 0.8,
• Exponential Arrivals vs. Fixed Interarrivals
• Random Service vs. Standardized Service
What happens if we release jobs at fixed intervals?
What happens with reliable processes & standard tasks?
3. Transfer vs. Process Batches

• Lot-Streaming – Dividing the process batch


into multiple transfer batches for concurrent
processing at successive stages
Simple Illustration
Machine

2
• Three stages 3

• Batch size = 20 20 80 120 Time

• Unit proc. times = 1, 3, 2 a. One Transfer Batch

Machine

• No setup 1

10 40 70 90 Time

b. Two Transfer Batches

Machine
1

3 ...

014 20 61 63 Time

c. Single Unit Transfer Batches


MH vs Thruput Time Tradeoff
MH Loads vs. Cycle Time

25

20

15

MH Loads

10

0
0 20 40 60 80 100 120 140
Cycle Time
Basic Rules (L Sublots, Q units)

1. Consistent, equal sublots good (not optimal)

(p2 qi = p1 qi+1 is optimal for adjacent WSs)

2. Decreasing marginal benefit:

2 sublots 50% of max gain


Q
T = Q ⋅ pb + ⋅ pi
L i ≠b
3. Protect bottleneck (avoid sublot setup loss)
4. Cross-Training
• Ensure Redundancy
• Consider Job Enrichment as Motivator
• Task Frequency Sufficient for Proficiency
• Lead Experts for Each Task
• Cover all Responsibilities
• Pay per Skill Breadth and Depth
• Worker Flexibility vs. WIP Safety Stock
a. Dynamic Rebalancing
1
4 min 3 min

6 min

8 min 3 min

a. Two Workers Total Time = 24


1
4 min 3 min

6 min

8 min 3 min

b. Three Workers
Part Flow
Worker Flow (Orbit)
Workstation
b. Bucket Brigades (TSS) & Variants

• BB
Assumes Task Continuity
Ordered Workers
Slowest to Fastest
Effective in Picking
Buffers can be added
•Champion Strategy
(For low machine ρ)
•Leapfrog Strategy
(Less worker movement)
5. Performance Evaluation
N=XT

• Find X & T given N & Capacity


• Find T and needed N for desired X given Capacity
• Find T, X Tradeoff
Open System (Receive and Release)

Random
Basic Poisson Process Estimate

1. Compute Effective Arrival 2. Evaluate Each


Rates at Workstations Workstation
(M/M/1)
m
λ 'j = λ j + λk' ⋅ pkj ρ
P(0) = 1-ρ
k =1

5/day 4 L = ρ/(1-ρ
ρ)
6
(A)
4 λ
W = L/λ
5
2

5
6/day (B)
System & Product Measures
3. Aggregate Across
Workstations

m
W= v j ⋅W j
j =1

WB= W + .67W +W
Closed System (CONWIP)
External Demand
Basic Performance Evaluation - Closed
Consider a Closed System with N Jobs:
X = Production rate, T = Throughput time

M
C= cj Total Servers or Max Active Jobs
j =1

M
P= tj Total Job Processing time
j =1

min(C , N )
T ≥ P so N = XT → X ≤
P
Performance Evaluation Extension

• Assume WIP Evenly Spread Out

N −1
1+ ⋅P , Exponential Processing Time
M
T=
N
⋅P , Constant, Synchronous Processing with N ≥ M
M

As Always, N=XT
Very Optimistic Model! No Starvation when N ≥ M
References and Extensions
1. Askin, R. & J. Goldberg, Design and
Analysis of Lean Production
Systems, Wiley& Sons, 2002
2. Askin, R. & C. Standridge, Modeling
and Analysis of Manufacturing
Systems, Wiley & Sons, 1993
3. Black, J. T., Design of the Factory
with a Future, McGraw Hill,
1991
4. Harmon, R & L. Peterson,
Reinventing the Factory, Free
Press, 1989
5. Hopp, W. and M. Spearman,
Factory Physics, McGraw Hill,
2000.