Trees Cutting: R4 / BBR111, Bandar Bukit Raja 2, Klang, Selangor. 35. Trees Cutting

1) The document identifies hazards, assesses risks, and determines controls for tree cutting work. Hazards include heat stress, injury from sharp objects, machinery toppling, road accidents, falling objects, and more. 2) Risks are evaluated based on probability and severity to determine an overall risk level. Controls include providing proper ventilation, rest areas, PPE, safety training, signage, and safe work procedures. 3) Specific hazards for clearing vegetation include injury from machinery, snake/insect bites. Controls are to provide safe access, ensure only licensed operators run machinery, have banksmen assistance, and use appropriate PPE.

Uploaded by

Rafee Pie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
700 views2 pages

Trees Cutting: R4 / BBR111, Bandar Bukit Raja 2, Klang, Selangor. 35. Trees Cutting

1) The document identifies hazards, assesses risks, and determines controls for tree cutting work. Hazards include heat stress, injury from sharp objects, machinery toppling, road accidents, falling objects, and more. 2) Risks are evaluated based on probability and severity to determine an overall risk level. Controls include providing proper ventilation, rest areas, PPE, safety training, signage, and safe work procedures. 3) Specific hazards for clearing vegetation include injury from machinery, snake/insect bites. Controls are to provide safe access, ensure only licensed operators run machinery, have banksmen assistance, and use appropriate PPE.

Uploaded by

Rafee Pie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD. FORM NO.

HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL REV.


Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
R4 / BBR111, Bandar Bukit Raja 2, 35. Trees Cutting
Klang, Selangor. Date: Date:

35. Trees Cutting


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

-Heat stress (low - Good / open ventilation at working area.


Psychological - To provide shelter/ rest area & drinking facilities
productivity) 2 3 6
Hot weather - Take a 2-3 minutes rest after every 2 ( two ) hours.
Project Manager
- Skin burn - To provide appropriate PPE.
1 Clearing of work area
Site Manager
- Moving parts of machinery / equipment shall be
Body parts contact with sharp Site Agent
-Serious injury 2 4 8 properly guarded.
object. - To provide appropriate PPE. Site Engineer

- Machinery shall be operated by license / competent Site Supervisor


-Serious injury / fatality person. SHO / SSS
Topple of machinery 2 5 10
Mobilization of -Damage to property - Adequate space and access.
- To provide appropriate PPE. EO
2 machinery /
Scaffolder
equipment - Compliance with approved TMP.
-Serious injury / fatality Work Leader
Road accident 2 5 10 - Ensure adequate space for machinery mobilize area.
-Damage to property - To provide appropriate PPE. Machinery opr/
Driver
- Storage area shall be properly barricade with signage.
Falling of object -Serious injury 2 4 8 - To provide appropriate PPE. Signalman
Banksman
- Materials shall be properly stacked and barricade. Rigger
Stacking and storage Struck by object -Serious injury 2 4 8 - Assistance from banskman and Traffic Controller.
3
of material at site - To provide appropriate PPE. Welder
Workers
- Not to pile up materials more than 2.5 meter.
Improper stack of materials -Serious injury / fatality 2 5 10 - To provide appropriate PPE.

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Trees Cutting (Cont’d)


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

- To provide safe access and egress.


- Machinery shall be operated by license / competent Project Manager
Struck by machinery -Serious injury / fatality 2 5 10 person.
- Banksman assistance. Site Manager
Clearing of - To provide appropriate PPE. Site Agent
vegetation / trees
4 Site Engineer
Site Supervisor
Bite by poisonous insect, snake -Serious injury / fatality 2 5 10 - To provide appropriate PPE. SHO / SSS
EO
Scaffolder
Work Leader
- To provide safe access and egress.
- Machinery shall be operated by license / competent Machinery opr/
Movement of Struck by machinery / topple of
5 -Serious injury / fatality 2 5 10 person. Driver
machinery machinery - Banksman assistance.
- To provide appropriate PPE. Signalman
Banksman
Rigger
- Moving parts of machinery shall be properly guarded. Welder
Cutting of trees /
6 Body contact with sharp object -Serious injury 2 4 8 - Only trained person to perform this activity.
branches - To provide appropriate PPE. Workers

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)