Alimak APF Manual
Alimak APF Manual
Alimak APF Manual
Technical Description
& Instruction Manual
This manual is only applicable if the manufacturing number indicated below corresponds to the manufacturing number stamped on the identification
sign of the equipment. Where there is a conflict contact Your ALIMAK representative.
If the bottom right corner of this book is cut, the book is only valid for illustrative use!
Photographs and drawings are illustrative only and do not necessarily show the
design of the products on the market at any given point in time. The products must
be used in conformity with applicable practice and safety regulations. Specifications
of the products and equipment presented herein are subject to change without notice.
CONTENTS
TECHNICAL DESCRIPTION
A
TECHNICAL DATA & SPECIFICATIONS
B
IMPORTANT SAFETY INSTRUCTIONS
C
INSTRUCTIONS FOR USE
D
SERVICE AND MAINTENANCE
E
ELECTRICAL TROUBLESHOOTING
F
ASSEMBLY
G
MAST AND PLATFORM
H
PROJECTING OF HOIST MAST
I
INSTALLATION AND REMOVAL OF MAST TIE
K
TRANSPORT AND MOVEMENT
L
ALIMAK AB IS ISO 9001 CERTIFIED
ISO 9001 is an international Quality Assurance Standard, which provides the parameters for
Quality Assurance Systems. The standard states how the organization of a company, working methods,
etc., shall function in order to attain the intended quality of products and related services.
Alimak AB, innovators in rack and pinion driven hoists and lifts, is the first hoist
and lift manufacturer, using this technology, to have achieved ISO 9001 certification.
Applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A 1
System description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A 2
Mobile chassis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A 4
Pedestal base . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A 6
Mast and mast ties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A 7
Drive unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A 10
Work platform . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A 12
Platform extension max. 1.8 m . . . . . . . . . . . . . . . . A 13
Railing cross members . . . . . . . . . . . . . . . . . . . . . . . . . . . A 13
Extra long 2.7 m platform extension . . . . . . . . . A 14
Canopy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A 15
Platform for installations around corners . . A 16
Catwalk extension . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A 16
Erection crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A 18
Safety features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A 18
Electrical equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A 18
Electrical system description . . . . . . . . . . . . . . . . . . . A 19
Transport and movement . . . . . . . . . . . . . . . . . . . . . . . A 22
ALIMAK
For lifting heights up to 100 m (330 ft.)
Where required lifting height exceeds the maximum allowed mast heights, we
request that you to contact ALIMAK´s Calculation Department for advice.
Length
max. 28.5 m
(93 ft.)
Example:
a 47
Straight or
Length max. 28.5 m (93 ft.)L
angular corner
Note: reduced load capacity
platform
due to the corner platform section.
section
”Catwalk” ”Catwalk”
a 48
Twin
length 11.8 – 43.3
m (39 ft. – 142 ft.)
Mast Climbing Work Platform APF - 50B, with drive unit type
B for twin mast installations.
a 52
a 56
Locking device The chassis is equipped with ”Ackerman” steering at the front
end and along with the tow bar makes it easy to manually steer
the work platform on the job site.
Tow bar
Mechanical jack
Telescopic outrigger
ALIMAK
A5
The tow bar on the optional self propelled chassis is equipped
with a push button box for horizontal movement.
a 163
Lever
a 101
ALIMAK
A6 Pedestal base
The pedestal base should be used in place of the mobile chassis
in the following conditions:
– Confined areas.
– High lifting heights.
– During longer construction periods.
– Where weight is of consideration, i.e. the structure bearing
Base frame the Aliclimber can only take limited bearing loads.
Rubber buffers
The pedestal base is constructed of steel profiles and is
equipped with four manual jacks to level and stabilize the
Aliclimber.
Location of mast section and buffers Rubber buffers are located on the base frame and are there in
for drive unit type A
order to absorb shock during transport. They also serve to
absorb shock should the system brakes malfunction.
ALIMAK
Mast
A7
The mast comes in lengths of 1508 mm ( 4 ft. 11 3/8 in.) and is
bolted together to form a mast tower of desired length.
Each mast is equipped with one or two boltable, precision cut
racks of module 5. The rack is made of special steel and
designed to withstand the forces applied to it.
All mast sections come galvanized with the exception of the
rack.
Up and down limit cams are located at the top and bottom of the
mast and act on the normal limit switches located on the
platform. These provide safe and automatic stopping at the
normal terminal positions of the platform.
Additional protection is provided by means of a final limit
switch with its cams located a minimum prescribed distance Final upper &
above and below the normal limit positions. Activation of this lower limit switch
switch removes power to the platform should some fault occur
Normal upper &
with the normal switches. lower limit switch
ALIMAK
A8 Mast ties come in four different types and are used to tie the
mast tower to the structure:
a 138
ALIMAK
Mast tie type S2A
A9
– to be used with drive unit Type B only!
This tie is used for single or twin masted installations, and
designed to take up the torsional stresses of the mast.
The tie is telescopic variable in vertical direction. The tie width
varies depending upon chosen length of the tie.
The distance between the face of structure and the mast center
for this tie type is a minimum of 800 mm (2 ft. 7-1/2 in.) to a
maximum of 2950 mm (9 ft. 8-1/8 in.).
a 139
This tie is used for single or twin masted installations – but only
with a single drive unit on the mast. The tie is designed to take
mast torsional stresses.
The tie is telescopic variable in vertical direction. The tie width
varies depending upon chosen length of the tie tubes.
The distance between the face of structure and the mast center
for this tie type is a minimum of 800 mm (2 ft. 7-1/2 in.) to a
maximum of 2200 mm (6 ft. 4-5/8 in.).
ALIMAK
A 10 Drive unit
A steel box section braced frame forms the main structure for
the drive unit. All the drive components, safety gear, drive
gears, guide rollers, limit switches, are attached. The platforms
are pinned to this unit.
Both type A and type B drive units have the same 4 kW rated
Drive unit type A brake motor driving a helical bevel gearbox.
The electromagnetic motor brake is spring activated when
deenergized.
The gearbox ratio results in a platform speed (up and down) of
approximately 12 m/min. (39 fpm). They move the platform
through a module 5 pinion engaging the mast rack.
A special handle at the platform deck level permits manual
release of the brake for emergency lowering in the event of
electric power failure.
ALIMAK
A 11
When the platform is used in the twin configuration, the drive
unit is provided with electro-mechanical levelling equipment
which controls and limits the inclination of the platform, from
horizontal.
The levelling equipment consists of a horizontally sliding rod,
which is attached to the platform modules. The platform
modules are, in turn, attached to the drive unit. The rod is
provided with cams which act on a limit switch that controls the
motors to both drive units, thereby ensuring the platform is kept
level.
Upper fixed connections
Push/Pull rod
ALIMAK
A 12 Work Platform (APF)
The platform consists of 819 (2 ft. 8 in.) and / or 1500 mm (4 ft.
11 in.) long sections, with a width 1.5 m, and are constructed of
steel pipe and structural tubes.
The platform sections are equipped with a floor of weather
treated anti-skid plywood.
The platform sections are assembled with 3 pins per side and
locked in place with spring clips – to achieve lengths up to 19.4 m
(64 ft.) in a single mast installation, APF - 50A.
In a twin mast installation the length of the platform can vary
a 70
from 11.8 m to 43.3 m (39 to 142 ft.), APF - 50A.
Safety railing bracket Alternatively 6.0 m to 28.5 m (20 to 93.5 ft.), APF - 50B.
with lock bolt The safety railing, which is constructed of galvanized steel pipe,
is mounted in brackets located at each corner of the platform
section and locked into place with a bolt.
The railing comes equipped with a kickplate.
Entrance gate
a 71
a 72
The railing with gate for entering and exiting of the platform is
constructed of galvanized steel pipe and is 1500 mm (4 ft. 11
in.) wide. Entrance width is 680 mm (2 ft. 2 in.). It is mounted
Pin for assembling in the same manner as the railing. The gate which is manually
platform sections: latched and electrically interlocked, must be closed in a closed
2 pcs. dia 30 mm (1 - 3/16’’)
1 pce. dia 37 mm (1 - 7/16’’)
position in order for the platform to operate.
ALIMAK
Platform Extension maximum 1.8 m ( 6 ft.)
A 13
The wood floor of the platform extension is supported by
structural tubes inserted into tubes forming part of the main
platform section.
The extension beams are equipped with railing brackets so that
safety railing can be job site built using appropriately
dimensioned wooden elements.
a 73 Aw
ood
floo
r is
buil
t on
site
Nail/wood screw.
Joint
ALIMAK
A 14 Extra long 2.7 m ( 9 ft.) platform extension
Aw
ood
floo
r is b
uilt
on site
ALIMAK
Canopy
A 15
To obtain a weather protected environment the work platform
can be equipped with an optional canopy. The canopy frame is
constructed of square steel structural tubes and covered with an
reinforced transparent plastic cloth. The cloth is rolled out in
one or two sheets, cut to the appropriate length and then
attached by rubber straps in four rows at intervals of 1 m (3.3 a 165
ft.), over the entire length of the canopy. Openings for the mast
and/or gate can be cut out with a knife. Rubber strap
a 157
ALIMAK
A 16 Platform for installations around corners
This accessory part can be delivered in square design or adapted
for special purposes.
Catwalk extension
Catwalk extensions are used when several machines in a
multiple mast installation must be able to access each other for
material or personnel transportation.
The catwalk extension fit all platform sections but is always
used at the end of the platform, on the left or right side.
Gates are electrically interlocked with both platforms.
ALIMAK
Catwalk extension
A 17
Straight configuration
Angular configuration
ALIMAK
A 18 Erection crane
To ease handling of mast sections during erection and disassem-
bly, an erection crane is available.
The erection crane is swung manually and can be equipped with
manual or electric hoists. Drive unit type APF-50A can use both
manual or electrical. Drive unit type APF-50B can only use
electrical.
The erection crane is mounted to a bracket in the center of the
platform for the APF-50A drive, or on the supplied attachment
for the APF-50B drive.
The crane is self-erecting by using the winch.
Max. capacity of erection crane is 300 kg (660 lbs.) which
includes the weight of the hoist.
ALIMAK
Electrical equipment
A 19
The electrical equipment for the work platform is designed and
built to withstand the rough working conditions normally found
on construction sites. The components are well proven and meet
a number of national / international standards, such as IEC,
CEE, EN, DIN, UL, CSA, SS.
The electric material is rated class IP 54 or higher.
a 82
Power supply
Cable handling
The trailing power cable is normally suspended under the
platform. The cable coils freely on the ground. Power supply
ALIMAK
A 20 Electrical system description
The electrical equipment for the APF-50 system is designed to
be flexible and easy to handle during erection and dismantling.
This is possible since all the cables, limit switches and cabinets
are connected by quick-connect plugs.
Drive units
There are two different types of drive units:
Drive unit A is used on APF (single or twin).
Drive unit B is used only on APF (twin).
The drive units, motors, brakes and all electrical components
are wired to a junction box.
Junction box mounted below
Located on the junction box there are three connection plugs for
platform with outlets X91, X 93
and X 95 attached to the back. limit switches from gates/load ramps and also a 22-pole (6+16)
Jumper plug must be inserted connection plug which connects the drive unit to the platform
when all of the gate options not electrical M-panel.
in service.
Catwalk
A catwalk is an electrical interlocked walk way between two
work platforms.
One platform can have maximum two catwalks, one against
each side of the platform.
The catwalk contains two different electrical components:
1. A catwalk-panel located at the base to interlock the
platforms.
This panel can interlock two catwalks.
2. A master module (1 pce/catwalk) which is located on the
”master” work platform, and ...
On the front of the junction box
there are two buttons to reset the
... a catwalk unit (1 pce/catwalk, unit 1 or unit 2) which is
motor overload. located on the ”slave” work platform.
ALIMAK
Horizontal drive for the mobile chassis
A 21
This is a portable module, which can be attached to the mobile
chassis in order to motorize horizontal movement.
The module comes with all the mechanical and electrical
components that are required. To get power to the drive,
disconnect the power cable to the platform and connect it to the
inlet on the junction box for the horizontal drive. Then it is
possible to manoeuvre the chassis from a control unit which is
attached to the controller by a flexible cable.
a 163
Controller
Jumper plugs
ALIMAK
A 22 Transport and movement
The machine can be towed or moved by its own drive unit
(option) over short distances. For longer distances it is
recommended that special transport vehicles be used. Only
machine components, e.g. platform parts and mast sections can
be left on the platform. The mast must always be dismantled
during transportation on public roads.
l1
l2
ALIMAK
Towing of platform with erected mast on a mobile single or
A 23
twin mast chassis
Platform with erected mast can be towed on the job site if the
following is observed:
l2
ALIMAK
Product, information and safety signs
1
5 9 10
2
3
6
14
13
11
22
7
15 8
21
18
19
20
ALIMAK 00000
TECHNICAL DATA & SPECIFICATIONS B0
ALIMAK
Drive unit type APF-50A
ALIMAK
Technical data, Metric units (50Hz)
B1
Capacity APF-50A APF-50B
Single Twin Single Twin
Min. / Max. platform length 4.4 m / 19.4 m 11.8 m / 43.3 m – 6.0 m / 28.5 m
Max. pay-load capacity 3970 kg at 4.4 m 7800 kg at 11.8 m – 8580 kg at 6.0 m
2490 kg at 19.4 m 4690 kg at 43.3 m – 6360 kg at 28.5 m
Vertical travel speed 12 m/min. – 12 m/min.
Horizontal travel speed with 8 m/min. – 8 m/min.
optional motor propelled chassis
Max. lifting height, untied mast 22 m outdoors – 22 m outdoors
with 4 completely extended 32 m indoors 32 m indoors
outriggers on mobile chassis.
Outdoor / Indoor installation
Max. lifting height, tied mast 100 m – 100 m
Increased lifting height on request
Tie distance when installed 15 m each – 15 m each
on mobile chassis
Tie distance when installed 1st = 3 m, 2nd = 6 m, 3rd = 9 m – 3 - 6 - 9 and
on pedestal base remaining 15 m remaining 15 m
Top overhang in Operation. 6m – 6m
Wind speed maximum 12.5 m/sec.
Top overhang during Erection. 15 m – 15 m
Wind speed maximum 8 m/sec.
Electrical data
ALIMAK
B2
ALIMAK
Technical data, Imperial units (60Hz)
B3
Capacity APF-50A APF-50B
Single Twin Single Twin
Min. / Max. platform length 14.5 ft. / 64 ft. 39 ft. / 142 ft. – 20 ft. / 93.5 ft.
Max. pay-load capacity 9,040 lbs. at 14.5 ft. 17,680 lbs. at 39 ft. – 19,400 lbs. at 20 ft.
5,780 lbs. at 64 ft. 10,820 lbs. at 142 ft. – 14,510 lbs. at 93.5 ft.
Vertical travel speed 39 fpm. – 39 fpm.
Horizontal travel speed with 30 fpm. – 30 fpm.
optional motor propelled chassis
Max. lifting height, untied mast 72 ft. outdoors – 72 ft. outdoors
with 4 completely extended 105 ft. indoors 105 ft. indoors
outriggers on mobile chassis.
Outdoor / Indoor installation
Max. lifting height, tied mast 330 ft. – 330 ft.
Increased lifting height on request
Tie distance when installed 50 ft. each – 50 ft. each
on mobile chassis
Tie distance when installed 1st = 10’, 2nd = 20’, 3rd =30’ – 10’ - 20’ - 30’ and
on pedestal base remaining 50 ft. remaining 50 ft.
Top overhang in Operation. 20 ft. – 20 ft.
Wind speed maximum 28 mph.
Top overhang during Erection. 50 ft. – 50 ft.
Wind speed maximum 34 mph.
Electrical data
ALIMAK
B4 Maximum allowed loading x
according to ISO 16369 (EN 1495))xxx
The following tables show several typical load cases. For other load cases not shown, contact the
nearest Alimak representative.
Maximum load – Single mast configuration and drive unit type APF-50 A
T Tc Tc
The sum of the two cantilever loads Tc (Tos or Tis) must never exceed the total payload capacity T
for the platform configuration in question. For this purpose, if a full Tc (Tos or Tis) load is placed
on one side the load on the other must be limited to T minus Tc (Tos or Tis) to avoid T being
exceeded.
ALIMAK
Metric units
B5
Aliclimber APF-50A Single Without With
platform extension platform extension
Nc Nc L T Tc Tos Tis T Tc Tos Tis
left right m kg kg kg kg kg kg kg kg
Imperial units
The weight of 2 people including equipment 240 kg (530 lbs.) may be added to the above loads.
Allowable personal items, tools, paint etc. for each person is a maximum 40 kg (88 lbs.).
ALIMAK
B6 Maximum load – Twin mast configuration and drive unit type APF-50 Axx
T/2 T/2
Tc Tm Tc
Tos Tos
Tmis Tmis
The sum of the two cantilever loads Tc (or Tos) and the midspan load Tm, must never exceed the
total payload capacity T for the platform configuration in question.
The weight of 4 people including equipment 400 kg (882 lbs.) may be added to the above loads.
Allowable personal items, tools, paint etc. for each person is 20 kg (44 lbs.).
ALIMAK
Metric units
B7
Aliclimber APF-50A Twin Without With
platform extension platform extension
Nc Nm Nc L T Tm Tmis Tc Tos T Tm Tmis Tc Tos
left mid. right m. kg kg kg kg kg kg kg kg kg kg
1 4 1 11.8 7800 7800 3900 3900 3900 7360 7360 3680 3680 3680
1 5 1 13.3 7650 7650 3830 3830 3830 7140 7140 3570 3570 3570
1 6 1 14.8 7500 7500 3750 3750 3750 6910 6910 3460 3460 3460
2 4 2 14.8 7500 7500 3750 3750 3570 6910 6910 3460 3460 3460
1 7 1 16.3 7360 7360 3680 3680 3680 6690 6690 3350 3350 3350
2 5 2 16.3 7360 7360 3680 3680 3570 6690 6690 3350 3350 3350
1 8 1 17.8 7210 6430 3600 3600 3600 6470 5940 3240 3240 3240
2 6 2 17.8 7210 7210 3600 3600 3570 6470 6470 3240 3240 3240
3 4 3 17.8 7210 7210 3600 2620 1810 6470 6470 3240 2430 1680
1 9 1 19.3 7060 5400 3530 3530 3530 6250 4840 3120 3120 3120
2 7 2 19.3 7060 7060 3530 3530 3530 6250 6250 3120 3120 3120
3 5 3 19.3 7060 7060 3530 2620 1810 6250 6250 3120 2430 1680
1 10 1 20.8 6910 4550 3460 3460 3460 6030 3930 3010 3010 3010
2 8 2 20.8 6910 6430 3460 3460 3460 6030 5940 3010 3010 3010
3 6 3 20.8 6910 6910 3460 2620 1810 6030 6030 3010 2430 1680
4 4 4 20.8 6910 6910 3460 1540 1010 6030 6030 3010 1290 840
1 11 1 22.3 6760 3830 3380 3380 3380 5810 3160 2900 2900 2900
2 9 2 22.3 6760 5400 3380 3380 3380 5810 4840 2900 2900 2900
3 7 3 22.3 6760 6760 3380 2620 1810 5810 5810 2900 2430 1680
4 5 4 22.3 6760 6760 3380 1540 1010 5810 5810 2900 1290 840
1 12 1 23.8 6620 3210 3310 3310 3310 5580 2480 2790 2790 2790
2 10 2 23.8 6620 4550 3310 3310 3310 5580 3930 2790 2790 2790
3 8 3 23.8 6620 6430 3310 2620 1810 5580 5580 2790 2430 1680
4 6 4 23.8 6620 6620 3310 1540 1010 5580 5580 2790 1290 840
1 13 1 25.3 6470 2670 3230 3230 3230 5360 1870 2680 2680 2680
2 11 2 25.3 6470 3830 3230 3230 3230 5360 3160 2680 2680 2680
3 9 3 25.3 6470 5400 3230 2620 1810 5360 4840 2680 2430 1680
4 7 4 25.3 6470 6470 3230 1540 1010 5360 5360 2680 1290 840
1 14 1 26.8 6320 2190 3160 3160 3160 5140 1330 2570 2570 2570
2 12 2 26.8 6320 3210 3160 3160 3160 5140 2480 2570 2570 2570
3 10 3 26.8 6320 4550 3160 2620 1810 5140 3930 2570 2430 1680
4 8 4 26.8 6320 6320 3160 1540 1010 5140 5140 2570 1290 840
1 15 1 28.3 6170 1760 3090 3090 3090 4920 840 2460 2460 2460
2 13 2 28.3 6170 2670 3090 3090 3090 4920 1870 2460 2460 2460
3 11 3 28.3 6170 3830 3090 2620 1810 4920 3160 2460 2430 1680
4 9 4 28.3 6170 5400 3090 1540 1010 4920 4840 2460 1290 840
1 16 1 29.8 6020 1360 3010 3010 3010 4700 380 1820 2350 2350
2 14 2 29.8 6020 2190 3010 3010 3010 4700 1330 2350 2350 2350
3 12 3 29.8 6020 3210 3010 2620 1810 4700 2480 2350 2350 1680
4 10 4 29.8 6020 4550 3010 1540 1010 4700 3930 2350 1290 840
1 17 1 31.3 5880 1000 2940 2940 2940 4480 NA NA 2240 2240
2 15 2 31.3 5880 1760 2940 2940 2940 4480 840 2240 2240 2240
3 13 3 31.3 5880 2670 2940 2620 1810 4480 1870 2240 2240 1680
4 11 4 31.3 5880 3830 2940 1540 1010 4480 3160 2240 1290 840
1 18 1 32.8 5730 660 2860 2860 2860 4260 NA NA 2130 2130
2 16 2 32.8 5730 1360 2860 2860 2860 4260 380 1820 2130 2130
3 14 3 32.8 5730 2190 2860 2620 1810 4260 1330 2130 2130 1680
4 12 4 32.8 5730 3210 2860 1540 1010 4260 2480 2130 1290 840
1 19 1 34.3 5580 350 1970 2790 2790 4030 NA NA 2020 2020
2 17 2 34.3 5580 1000 2790 2790 2790 4030 NA NA 2020 2020
3 15 3 34.3 5580 1760 2790 2620 1810 4030 840 2020 2020 1680
4 13 4 34.3 5580 2670 2790 1540 1010 4030 1870 2020 1290 840
2 18 2 35.8 5430 660 2720 2720 2720 3810 NA NA 1910 1910
3 16 3 35.8 5430 1360 2720 2620 1810 3810 380 1820 1910 1680
4 14 4 35.8 5430 2190 2720 1540 1010 3810 1330 1910 1290 840
2 19 2 37.3 5280 350 1970 2640 2640 3590 NA NA 1800 1800
3 17 3 37.3 5280 1000 2640 2620 1810 3590 NA NA 1800 1680
4 15 4 37.3 5280 1760 2640 1540 1010 3590 840 1800 1290 840
3 18 3 38.8 5140 660 2570 2570 1810 3370 NA NA 1680 1680
4 16 4 38.8 5140 1360 2570 1540 1010 3370 380 1680 1290 840
3 19 3 40.3 4990 350 1970 2490 1810 3150 NA NA 1570 1570
4 17 4 40.3 4990 1000 2490 1540 1010 3150 NA NA 1290 840
4 18 4 41.8 4840 660 2420 1540 1010 2930 NA NA 1290 840
4 19 4 43.3 4690 350 1970 1540 1010 2700 NA NA 1290 840
ALIMAK
B8 Maximum load – Twin mast configuration and drive unit type APF-50 Axx
T/2 T/2
Tc Tm Tc
Tos Tos
Tmis Tmis
The sum of the two cantilever loads Tc (or Tos) and the midspan load Tm, must never exceed the
total payload capacity T for the platform configuration in question.
The weight of 4 people including equipment 400 kg (882 lbs.) may be added to the above loads.
Allowable personal items, tools, paint etc. for each person is 20 kg (44 lbs.).
ALIMAK
Imperial units
B9
Aliclimber APF-50A Twin Without With
platform extension platform extension
Nc Nm Nc L T Tm Tmis Tc Tos T Tm Tmis Tc Tos
left mid. right ft. lbs. lbs. lbs. lbs. lbs. lbs. lbs. lbs. lbs. lbs.
1 4 1 38.71 17680 17190 8600 8600 8600 16700 16220 8110 8110 8110
1 5 1 43.64 17350 16870 8430 8430 8430 16210 15730 7870 7870 7870
1 6 1 48.56 17020 16540 8270 8270 8270 15730 15240 7620 7620 7620
2 4 2 48.56 17020 16540 8270 8270 7870 15730 15240 7620 7620 7620
1 7 1 53.48 16700 16210 8110 8110 8110 15240 14750 7380 7380 7380
2 5 2 53.48 16700 16210 8110 8110 7870 15240 14750 7380 7380 7380
1 8 1 58.4 16370 14170 7940 7940 7940 14750 13080 7130 7130 7130
2 6 2 58.4 16370 15890 7940 7940 7870 14750 14270 7130 7130 7130
3 4 3 58.4 16370 15890 7940 5780 3990 14750 14270 7130 5360 3700
1 9 1 63.32 16040 11900 7780 7780 7780 14260 10680 6890 6890 6890
2 7 2 63.32 16040 15560 7780 7780 7780 14260 13780 6890 6890 6890
3 5 3 63.32 16040 15560 7780 5780 3990 14260 13780 6890 5360 3700
1 10 1 68.24 15720 10030 7620 7620 7620 13770 8670 6640 6640 6640
2 8 2 68.24 15720 14170 7620 7620 7620 13770 13080 6640 6640 6640
3 6 3 68.24 15720 15240 7620 5780 3990 13770 13290 6640 5360 3700
4 4 4 68.24 15720 15240 7620 3400 2230 13770 13290 6640 2830 1860
1 11 1 73.16 15390 8450 7450 7450 7450 13280 6960 6400 6400 6400
2 9 2 73.16 15390 11900 7450 7450 7450 13280 10680 6400 6400 6400
3 7 3 73.16 15390 14910 7450 5780 3990 13280 12800 6400 5360 3700
4 5 4 73.16 15390 14910 7450 3400 2230 13280 12800 6400 2830 1860
1 12 1 78.08 15070 7080 7290 7290 7290 12790 5460 6160 6160 6160
2 10 2 78.08 15070 10030 7290 7290 7290 12790 8670 6160 6160 6160
3 8 3 78.08 15070 14170 7290 5780 3990 12790 12310 6160 5360 3700
4 6 4 78.08 15070 14580 7290 3400 2230 12790 12310 6160 2830 1860
1 13 1 83.01 14740 5890 7130 7130 7130 12310 4130 5910 5910 5910
2 11 2 83.01 14740 8450 7130 7130 7130 12310 6960 5910 5910 5910
3 9 3 83.01 14740 11900 7130 5780 3990 12310 10680 5910 5360 3700
4 7 4 83.01 14740 14260 7130 3400 2230 12310 11820 5910 2830 1860
1 14 1 87.93 14410 4830 6970 6970 6970 11820 2930 5670 5670 5670
2 12 2 87.93 14410 7080 6970 6970 6970 11820 5460 5670 5670 5670
3 10 3 87.93 14410 10030 6970 5780 3990 11820 8670 5670 5360 3700
4 8 4 87.93 14410 13930 6970 3400 2230 11820 11340 5670 2830 1860
1 15 1 92.85 14090 3870 6800 6800 6800 11330 1840 5420 5420 5420
2 13 2 92.85 14090 5890 6800 6800 6800 11330 4130 5420 5420 5420
3 11 3 92.85 14090 8450 6800 5780 3990 11330 6960 5420 5360 3700
4 9 4 92.85 14090 11900 6800 3400 2230 11330 10680 5420 2830 1860
1 16 1 97.77 13760 3000 6640 6640 6640 10840 840 4010 5180 5180
2 14 2 97.77 13760 4830 6640 6640 6640 10840 2930 5180 5180 5180
3 12 3 97.77 13760 7080 6640 5780 3990 10840 5460 5180 5180 3700
4 10 4 97.77 13760 10030 6640 3400 2230 10840 8670 5180 2830 1860
1 17 1 102.69 13430 2200 6480 6480 6480 10350 NA NA 4940 4940
2 15 2 102.69 13430 3870 6480 6480 6480 10350 1840 4940 4940 4940
3 13 3 102.69 13430 5890 6480 5780 3990 10350 4130 4940 4940 3700
4 11 4 102.69 13430 8450 6480 3400 2230 10350 6960 4940 2830 1860
1 18 1 107.61 13110 1460 6310 6310 6310 9860 NA NA 4690 4690
2 16 2 107.61 13110 3000 6310 6310 6310 9860 840 4010 4690 4690
3 14 3 107.61 13110 4830 6310 5780 3990 9860 2930 4690 4690 3700
4 12 4 107.61 13110 7080 6310 3400 2230 9860 5460 4690 2830 1860
1 19 1 112.53 12780 760 4350 6150 6150 9370 NA NA 4450 4450
2 17 2 112.53 12780 2200 6150 6150 6150 9370 NA NA 4450 4450
3 15 3 112.53 12780 3870 6150 5780 3990 9370 1840 4450 4450 3700
4 13 4 112.53 12780 5890 6150 3400 2230 9370 4130 4450 2830 1860
2 18 2 117.45 12450 1460 5990 5990 5990 8890 NA NA 4200 4200
3 16 3 117.45 12450 3000 5990 5780 3990 8890 840 4010 4200 3700
4 14 4 117.45 12450 4830 5990 3400 2230 8890 2930 4200 2830 1860
2 19 2 122.38 12130 760 4350 5820 5820 8400 NA NA 3960 3960
3 17 3 122.38 12130 2200 5820 5780 3990 8400 NA NA 3960 3700
4 15 4 122.38 12130 3870 5820 3400 2230 8400 1840 3960 2830 1860
3 18 3 127.3 11800 1460 5660 5660 3990 7910 NA NA 3710 3700
4 16 4 127.3 11800 3000 5660 3400 2230 7910 840 3710 2830 1860
3 19 3 132.22 11480 760 4350 5500 3990 7420 NA NA 3470 3470
4 17 4 132,22 11480 2200 5500 3400 2230 7420 NA NA 2830 1860
4 18 4 137,14 11150 1460 5330 3400 2230 6930 NA NA 2830 1860
4 19 4 142,06 10820 760 4350 3400 2230 6440 NA NA 2830 1860
ALIMAK
B 10 Maximum load – Twin mast configuration and drive unit type APF-50 Bxx
T/2
T/2
Tm
Tmis Tmis
The sum of the two cantilever loads Tmis must never exceed the total payload capacity T for the
platform configuration in question.
ALIMAK
Metric units
B 11
Aliclimber APF-50B Twin Without With
platform extension platform extension
Nc Nm Nc L T Tm Tmis Tc Tos T Tm Tmis Tc Tos
left mid. right m kg kg kg kg kg kg kg kg kg kg
Imperial units
The weight of 4 people including equipment 400 kg (882 lbs.) may be added to the above loads.
Allowable personal items, tools, paint etc. for each person is 20 kg (44 lbs.).
ALIMAK
B 12 Maximum no. of persons allowed on the
Work Platform
With loads according to load tables the number of persons
allowed on the platform is:
– single mast platform = two (2)
– twin mast platform = four (4)
ALIMAK
Allowed max. freestanding mast height
B 13
– In service / Out of service
CAUTION: Note that the outriggers on the opposite side of
the face of the structure must always be completely
extended and locked.
The mast MUST ALWAYS be tied when using the canopy.
Wind
direction
Wind
direction
ALIMAK
B 14 Load signs
Rated load sign on the platform
Copy of each of following signs showing platform confi-
guration, rated load and outrigger arrangements, must be
completed by user or authorized installer of the platform and be
mounted in a prominent place on the platform, near the platform
control panel.
ALIMAK
B 15
Data on information sign must be in accordance with technical
data and additional technical information presented in this
manual.
Load signs are available for both Metric and Imperial units.
ALIMAK
ALIMAK
B 16
ALIMAK
B 17
ALIMAK
B 18
ALIMAK
B 19 Example:
Drive unit type APF-50A. Dual mast installation.
Platform length 78 ft. Load capacity according to page B 9.
Freestanding mast with outriggers partly extended.
Mast turned from the structure face. See page B 13.
Maximum 6 ft. platform extension.
43
15070
7290 7290
7290 7290
7290 10030 7290
78
ALIMAK
Example continue
B 20
1.5 3.0 ✔
ALIMAK
B 21 Determin mast height
Lh = Lifting height
Mast section length = 1.508 meter = (59.37’’)
N = No. of mast sections = Lh + 1.3 meter = (Lh + 39.37’’)
1.508 (59.37’’)
Mh = Mast height = h + N x 1.508 meter
1
= (h1 + N x 59.37’’)
Working height = Lh + 1.5 meter = (Lh + 59.37’’)
Mh
N
Lh
h1
h2
ALIMAK
Data – mast
B 22
Length/height: 1508 mm (4 ft. 11 3/8 in.)
Weight: 112 / 128 kg (247 / 282 lbs.)
Mast bolt dimensions: 1’’ UNC – quality minimum 8.8
or (A325)
726
650
Tightening torque: 350 Nm (258 lbf x ft)
ALIMAK
IMPORTANT SAFETY INSTRUCTIONS C0
Operating requirements . . . . . . . . . . . . . . . . . . . . . . . . . C 1
Operator requirements . . . . . . . . . . . . . . . . . . . . . . . . . . C 2
Important safety instructions . . . . . . . . . . . . . . . . . . C 3
ALIMAK
Operating personnel requirements
C1
User Requirements
The information in this manual must be supplemented with
good job management, site safety regulations, training, proper
installation, inspections, maintenance, consistent with all
available technical data found in this manual. Since the
user/owner has direct control over the application and operation
of the Alimak Work Platform, conformance with good safety
practices is the direct responsibility of the user/owner and
operating personnel. As the Mast Climbing Work Platform will
be carrying personnel, decisions on the use and operation of the
equipment must take this into account relative to their safety.
Maintenance training
The user must train their maintenance personnel in inspection,
erection and maintenance of the Alimak Platform in accordance
with this Instruction Manual and with the manufacturer´s
recommendations.
Operator training
Whenever a user directs an individual to operate a Alimak
Platform, they shall ensure that the individual has been trained in
accordance with the manufacturer´s Operating and Maintenance
Manual, and the user´s work instructions and requirements listed
in sections of this Instruction Manual before operating the
Alimak Platform.
Model training
The user shall be responsible for the operator being trained on
the model of the Alimak Platform that will be operated. Such
training shall be in an area free of obstructions, under the
direction of a qualified person to determine that the trainee
displays full knowledge in the operation of the Alimak
Platform. Only authorized and properly trained personnel shall
be permitted to operate the Alimak Platform. Such a person
must always be located on the platform during its use.
Before operation
Before authorizing an operator to operate a Alimak Platform,
the user shall ensure that the operator has:
– been instructed by a qualified person in the intended purpose
and function of each control;
– has read and understood the latest manufacturer´s
operating instructions and user´s safety rules, or been trained
by a qualified person on the contents of the manufacturer´s
operating instructions and user´s safety rules;
ALIMAK
C2 – understood all decals, warnings, and instructions signs
displayed on the Alimak Platform;
– determined that the purpose for which the Alimak
Platform is to be used is within the scope of the intended
applications defined by the manufacturer.
Operator Requirements
The information in this Instruction Manual must be sup-
plemented by good judgement, site safety regulations, and
caution in evaluating each situation. Since the operator has
direct control of the Alimak Platform, strict conformance with
good safety practices in this area is the responsibility of the
operator. The operator must make decisions on the use and
operation of the Alimak Platform with due consideration that
his own safety as well as the safety of other personnel on and
around the platform is dependent on these decisions.
Instruction Manual
The operator shall be aware that the Instruction Manual is
stored on the Alimak Platform and the location where it is
stored. The operator shall be familiar with this and consult the
manual when questions arise with respect to the Alimak
Platform.
Training
The operator shall have been trained either on the same model
of a Alimak Platform or one having operating characteristics
and controls consistent with the one to be used during actual
work site operation. The operator trainee shall operate the
Alimak Platform in an area free of obstructions under the
direction of a qualified person for a sufficient time to determine
that the trainee displays proficiency in knowledge and actual
operation of the Alimak Platform. Only authorized properly
trained personnel shall be permitted to operate the Alimak
Platform.
Before operation
Before being authorized to operate the Alimak Platform, the
operator shall have:
– been instructed by a qualified person in the intended purpose
and function of each of the controls
– read and understood the manufacturer´s/owner´s operating
instructions and safety rules, or been trained by a qualified
person on the contents of the manufacturer´s/owner´s
operating instructions and safety rules.
– understood by reading or having a qualified person explain
all decals, warnings, and instructions signs displayed on the
Alimak Platform.
ALIMAK
Important Safety Instructions
C3
Over the years serious accidents have occurred during the
erection and dismantling of rack and pinion equipment.
Common to these accidents has been the ”human factor”, i.e.
non adherence to proper safety procedures and common sense.
Some examples:
Leaning over the safety railing while the platform is moving
upwards can cause you to be struck by a tie or other protruding
objects.
Incomplete installation of mast bolts can cause separation of the
mast sections, leading to the fall of the platform with
subsequent loss of life or serious injuries.
Avoid the risk of accidents by carefully studying these
instructions regularly. Think clearly! Do not rush the work
and always check to make certain that the work is being done
properly. c5
SAFETY FIRST!
Safety Instructions
Local Safety Regulations
– All local regulations shall apply.
Weather Conditions
– Do not erect or dismantle if wind speed exceed 12 m/s.
(26 mph) or as governed by local regulations where more
stringent.
Preparation
– Read and understand the Instruction Manual before work
begins.
– Barricade or rope off the area before erecting or dismantling.
c6
ALIMAK
C4 Safety Equipment and Protective Clothing
– Prescribed safety equipment and clothing such as hard hat,
safety shoes, fall arresting device shall be used.
– Loose fitting clothes such as scarves must not be used as they
might become entangled in moving parts.
General
– Read all Warning and Instruction Signs.
– Keep the work area clean. Any oil spillage must be removed
immediately to avoid the risk of slipping.
– Never climb on the mast.
– During mast erection, dismantling or hoistway inspection,
the machine must always be operated from the platform.
When working from the platform take precautions to avoid
being struck by balconies, scaffolds and other similar
obstructions while platform is moving.
– When the control equipment on the platform is to be left
temporarily during installation/dismantling or service, the
main switch on the electric panel must be switched off
locked, and tagged in order to ensure no accidental
movement of the platform.
– Under no circumstances shall the platform be driven if there
is any one on the mast or below the platform.
– Complete each item of work before starting a new one or
taking a break. This is especially important when bolting
mast sections and installing ties.
Electrical Power
c3 – Work performed on electrical equipment must be carried out
by competent personnel, trained for such work. The power
The main ”ON/OFF” switch must be in
the ”OFF” position before the panel supply must be switched off locked and tagged, before work
door can be opened. is performed.
ALIMAK
Safe distance to dangerous high voltage cables
C5
– Follow the table below to find the minimum allowed
safe distance between any part of the machine and any
current carrying high voltage power cable. Also conform to
local regulations where more stringent.
Illumination
– Adequate lighting shall be provided to illuminate the site
over the full travelling height of travel of the platform.
Lightning
– The work platform shall be earthed (grounded) so that the
charge from a lightning strike is connected to earth. Personnel
shall not be on the platform during such weather.
Spare Parts
– Unauthorized spare parts are not to be used. Only ”Alimak
Genuine Spare Parts” are to be installed.
ALIMAK
12. Door circuit indication
1. Up/Down lever
Power ”OK”
indication
Bypass circuit
indication
By pass switch
Safety circuit
Selector switch indication
Manual/Remote
control ”SLAVE”
9. Stop left motor
High motor temp. indication
8. Stop right motor Stop Next Landing button
Emergency Stop switch
Main switch
”MASTER”
Power connection
INSTRUCTIONS FOR USE D0
ALIMAK
12. Door circuit indication
1. Up/Down lever
Power ”OK”
indication
Bypass circuit
indication
By pass switch
Safety circuit
Selector switch indication
Manual/Remote
control ”SLAVE”
9. Stop left motor
High motor temp. indication
8. Stop right motor Stop Next Landing button
Emergency Stop switch
Main switch
”MASTER”
Power connection
ALIMAK
Instructions for use
D1
Instructions for the user/operator on how the equipment is to be
operated are presented below. These instructions will also be
found on a sign on the platform.
Illegible and missing signs must be replaced!
SAFETY INSTRUCTIONS
Before using this platform, carry out the following safety procedures, as well as any
maintenance and lubrication specified in the Operator’s Manual.
ALIMAK
D2 Operating instructions .
Operating instructions for Work Platform
1. Observe and study the safety instructions.
2. Take necessary measures to avoid risks of slipping if the
working platform floor, staircase etc. is covered with oil,
snow/ice or frost.
3. The area below the platform must be barricaded to
prevent injury to personnel on the ground due to the
possibility of falling objects.
4. Unlock and remove the padlock from the main switch.
5. Turn the main ON/OFF switch(es) on the platform to
position ”ON”.
6. Load the platform. Do not overload and do not place the
load outside platform railing.
7. Make certain that the load signs show the actual platform
configuration.
8. Close the safety railing gate(s) fully.
9. Check for obstacles in the path of travel of the platform.
When extension parts are used in connection with tied mast,
special attention must be observed so that the passage is
free for the platform.
Keep this constantly under observation.
10. Move the lever to the symbol for the desired direction of
travel. The platform will now start moving.
Stop the platform by carefully moving the lever to the
Neutral” position
At the top and bottom the platform will stop automatically
by means of the normal limit switches.
11. On the way down check that the machine´s audible warning
signal is in operation.
12. Turn the main ON/OFF switch(es) on the platform to
position ”OFF”.
ALIMAK
Platform with mast tied to building
D3
The work platform may be used under the following conditions:
In service maximum wind speed 15.5 m/sec. (35 mph).
Out of service maximum wind speed 36 m/sec. (90 mph)
exposure A and B according to ASCE 7-93.
DANGER !
Tipping hazard.
Never use the work platform with free standing
mast when wind velocity exceeds 12.7 m/sec
(28 mph).
Will cause severe injury or death.
If the platform still does not start, see the instructions in the
section ”Electrical trouble-shooting”.
ALIMAK 2
D4 If the platform suddenly stops
If the platform stops due to a power failure or any other electric
failure, such as blown fuses, tripped motor overload protector,
etc., it can be manually lowered for unloading.
Slide the platform only short distances at very low speed in
order not to exceed the normal operating speed of the platform.
If excess speed occurs, the platform’s safety device will
d7
automatically trip and stop the platform.
ALIMAK
Sliding
D5
1. First check applicable items under the heading ”If the
platform doesn’t start – check”.
2. Turn off the main ON/OFF switch on the electrical M-panel.
ALIMAK
D6 5. If sliding of the platform is not possible – stay on the
platform and call for assistance.
DANGER !
Falling hazard.
Do not leave the platform – wait for qualified
assistance.
Will cause severe personal injury or death.
d 34
Manual cranking
To be carried out by trained service personnel.
OFF
WARNING !
Chrushing hazard.
Always disconnect the power by means of the main
ON switch on the M-panel before working on the
machinery.
Can cause severe personal injury.
d1
ALIMAK
SERVICE AND MAINTENANCE E0
ALIMAK
Service and maintenance
E1
In order to avoid unnecessary breakdowns, those responsible for
the service and maintenance of this equipment must regularly
ensure that all scheduled maintenance work is carried out at the
recommended intervals according to the maintenance program
below.
Adjustments and replacement as a result of inspection, must be
carried out by trained/authorized service personnel.
Only ALIMAK Genuine Spare Parts must be used.
WARNING!
Unintended operation.
Always switch OFF lock and tag the main switch
when leaving the platform even without having
completed the service work.
Can cause severe injury or death.
Checklists e1
40 operating 1. Sign plates/ Check that all signs are legible. Check if actual figures on
hours or at least instruction load sign are correct and that documentation box contains
every month manuals manuals.
2. Safety device Check with the user/users if the safety device has been
tripping without cause or if noise can be heard from the
device during operation. For further details, see the
instructions for checking wear on the safety device under
the heading ”Adjustment and wear limits”.
3. Gear box Check the oil level and refill if necessary. Leaking seals
must be replaced by trained/authorized personnel.
4. Lockings of Check that all locks for platform safety railing are intact.
safety railing
6. Wheels/tires, Check tire pressure. Check tires for damage and wheel
where applicable nuts for tightness.
7. Tow bar, Check tow bar for damages and that wiring, plug and
where applicable socket are intact.
ALIMAK
E2
Interval Part Instructions
11. Electric motor Check that the platform stops within acceptable limits,
brakes specified later in this chapter. See also the special
instructions for checking.
12. Trailing cable Check the cable for wear and to ensure that no kinks exist.
13. Entrance gate Check the function of the latch and the interlock.
mechanical latch and
electrical interlock.
14. Platform floor Clean floor and check condition of floor plates and
missing bolts. Replace if necessary.
16. Optional under plat- Check attachment and wiring. Also make certain that the
form obstruction work platform cannot start with an obstruction between
protection system, the transmitter and receiver.
where applicable
120 operating 21. Mast Check visually that all mast bolts are properly tightened.
hours or at least Also check the bolts for attaching the mast to the pedestal
6 times a year base / mobile chassis.
22. Mast ties, Check that all bolts in all mast ties are properly tightened.
where applicable Also check attachment to structure.
25. Buffers for platform Check that the buffers are in position and are in proper
condition.
26. Signal equipment Check the function of the control device, alarm signal,
and lighting and, where applicable, voice communication system.
27. Rack and pinion Check the wear on the rack and pinion according to the
instructions under the heading ”Adjustment and wear
limits”.
28. Horizontal levelling Check the attachment and function of the switches and
equipment – for twin cams. Check the mechanical function by sliding. See
mast configuration heading ”Horizontal levelling equipment”.
ALIMAK
E3
Interval Part Instructions
29. Scaffolding adja- Check that the distance from the platform hoistway to
cent to platform landings, scaffolding, balconies, windows or any other
location where persons may find themselves, are not less
than regulations dictate.
Point out any infringements and risks of injuries to the
site manager.
400 operating 40. Guide and counter Check wear and bearing play of the platform guide
hours or at least rollers rollers. Also check that the rollers can move axially.
4 times a year Adjustment and replacement, when required, must be
carried out by trained/authorized service personnel.
41. Safety device Test the safety device according to the instructions under
the heading ”Drop test”.
42. Electric motor If necessary, clean the cooling flanges of the motor.
43. Contactors Check the condition of the contact points in the contactors.
1000 operating 50. Electric wiring Check all wires, sealing glands and connections.
hours or at least
once a year 51. Motor overload Check that the motor overload protector is set to the
protectors rated current on the data plate for the electric motor.
53. Corrosion, damage Inspect the equipment in its entirety for corrosion and
and wear wear on loadbearing and force-absorbing components
with the aid of an ultrasonic thickness measuring
instrument. This inspection and any actions which may
need to be taken after the inspection must be performed
by trained/authorized service personnel.
A method for internal corrosion protection of the mast
tubes is available. Please contact your ALIMAK
representative.
54. Mast Check that all mast bolts are properly tightened.
Also check the bolts for attaching the mast to the chassis.
Annually 60. Complete platform Have the complete equipment checked by a qualified
technician.
Every 4th year or 61. Safety device Replace the complete safety device. Contact your Alimak
according to sign on the representative.
safety device
ALIMAK
E4 Adjustment and wear limits
Platform stopping positions
If the distance between actual stopping positions empty/fully
loaded platform exceeds 50 mm (2 in.), the brakes must be
checked by trained/ authorized service personnel.
mm
0.25
mi
n. mm
x . 0.6
ma
ALIMAK0235
Guide roller
E5
B
Wear limits
Measure with sliding caliper.
Dimensions New roller Worn-out roller
(mm) (mm)
A Ø 74 min. Ø 68
A
(Ø 2.91 in.) (min. Ø 2.68 in.)
B min. 2
(min. .08 in.)
Note that the ”wear” on the roller face must be equal – all
around. e 52
ALIMAK
E6 Pinion
Max. worn gear
Check the wear with the aid of sliding caliper.
New gear
(.31”)
ø 8 mm
Rack
Max. worn rack
Measure with a dia. 8 mm (.31 in.) gauge rod and sliding caliper.
New rack
Mast tubes
Checking of wear and corrosion of the mast sections is carried
out by means of an Alimak ultrasonic tester, P/N.3001 991-301.
The bottom mast section is throughly checked.
New mast tubes ( t ) = 4.2 mm (.165 in.) nom.
Max. worn mast tubes ( t ) = 3.6 mm (.142 in.) – approximately
e 11
15% reduction of wall thickness.
ALIMAK
Measuring the radial play of the rotating shaft on
E7
the safety device
3. Lift the pinion with the aid of the cranking lever from the
tool kit or some other suitable tool and measure the play
again.
Note that the pinion may not be turned but must remain in
precisely the same position during both measurements.
ALIMAK
E8 Drop test
To be carried out by trained service personnel.
A drop test with full load shall be carried out for each new
installation and then at least once every 3 months – or in
accordance with local safety regulations.
DANGER!
Brake malfunction hazard
No one is allowed on the platform during a drop test.
Will cause severe bodily injury or death.
e 16
ALIMAK2017
E9
5. Press the button on the drop test pushbutton box marked with
an arrow symbol and maintain it in the depressed position.
This releases the motor brakes and the platform will drop
until it reaches the tripping speed and the safety device is
actuated.
Release the pushbutton immediately if the safety device
does not function and stop the platform – at least 0.5 meters
(approximately 2 ft.) above lower normal landing level.
The brake(s) is applied when the pushbutton is released.
6. Run the platform upwards 0.2 meters (8 in.) to release the
mechanism of the safety device. Slide the platform to the
normal lower landing level with the drop test equipment and
the pushbutton with the arrow symbol.
7. Remove the test cable.
8. Check that the microswitch in the safety device functions by
test running the platform downwards with ordinary operating
equipment.
9. Reset the safety device in accordance with instructions to be
found on next page:
Indicating pin
Calculating the stopping distance before resetting
The safety device stopping distance can be measured between
the end face of the safety device and the end of the indicating
pin – measure ”L”, see figure.
Multiply measure ”L” with factor 118 for safety device type GF. L
ALIMAK
Resetting the safety device
E 10
If the safety device trips during normal operation, a careful
check must be made of the motor brake(s), transmission, pinion,
rack and all guide and counter rollers by trained /authorized
service personnel, before the safety device can be reset. The
cause of the tripping must be determined and rectified.
The safety device may be reset after a drop test, without having
to carry out the checks listed above.
Exchange intervals, see sign on safety device!
WARNING! Tightening
Falling hazard torque 20 Nm
(14.8 lbf x ft.)
Never reset the safety device above ground landing.
Can cause severe injury or death.
Resetting
To be carried out by trained service personnel.
1. Switch off the main switch.
2. Unscrew the bolts (1) and remove the cover (2).
3. Unscrew the bolts (3).
4. Use the sleeve (5) and the cranking lever (4) to
back off the nut (7) until the end of the pin (6)
is on a level with the end surface of the safety
device.
5. Install the bolts (3) and the cover (2) with the
bolts (1).
6. Remove the protective cover (9).
7. Tighten the bolt (8) by hand as far as
possible and then a further 30° with aid of the
sleeve and the cranking lever (4) – in the
direction indicated by the arrow on the cover.
8. Reinstall the protective cover (9).
9. Switch on the main switch and run the
platform up approximately 20 cm (8 in). upward
to reset the centrifugal weight of the safety e 21
device in its neutral position.
10. Make a test run.
ALIMAK
E 11 Lubrication diagram
The lubricating oil grades indicated above have been used when the equipment is delivered from the factory. Only oil
recommended by ALIMAK shall be used. If for some reason this is not possible, please contact ALIMAK or ALIMAK
representative for advice.
If changing to another oil, the gear box and air filter must first be carefully cleaned.
WARNING!
Lubricant harmful in contact with skin and
lungs.
Always use protective gloves and dust mask.
Possible risks of irreversible effects.
See applicable MSDS located in document box
located on the platform.
WARNING!
Falling hazard.
Always use a fall arresting device if there is a need
to climb above the safety railing to reach the rack or
items to grease or inspect.
Can cause severe injury or death.
ALIMAK 3
E 12
2
20
1
20
1
9
9
ALIMAK
Greasing the manual screw jacks – applicable for
E 13
pedestal base only
position. A
ALIMAK
E 14 Safety, information and product signs
ALIMAK
Location of safety, information and product signs
E 15
1
5 9 10
2
3
6
14
13
11
22
7
15 8
21
18
19
20
ALIMAK
ELECTRICAL TROUBLESHOOTING F0
Electrical troubleshooting . . . . . . . . . . . . . . . F 1
Example . . . . . . . . . . . . . . . . . . . . . . . . . . . F3
Circuit diagram . . . . . . . . . . . . . . . . . . . . . . .
.
ALIMAK
Electrical troubleshooting
F1
All forms of troubleshooting require adapting the procedure to
the function and structure of the equipment and to other
conditions which may be local in nature. For example, the
erection site, maintenance, previous operational problems, etc.
The main principles of all forms of troubleshooting in electric
systems are presented below. Troubleshooting is carried out with
f1
the aid of a test lamp or voltmeter. A voltmeter is recommended,
preferably a universal instrument, for rapid and reliable trouble-
shooting.
WARNING!
Hazardous voltage.
Only authorized electricians or authorized service
personnel can carry out work on electrical equipment.
Can cause severe injury or death.
f4
ALIMAK
F2
8. Check in the electrical M-panel to ensure that power occurs on all three phases of the incoming
cable.
9. Check that the “Up” and “Down” pulses from the pushbuttons and control devices reaches the
electric cabinet on the platform in the intended manner.
10. Make a trial run and check that the coil on the relevant contactor (Up, Down) receives power
and that it is actuated. Check that the brake contactor is actuated and that the brake coil is
energized so that the brake releases.
11. If the fault does not occur in the platform operating system but in its lighting or signal system,
carry out fault-tracing in a manner similar to that described above. Check the circuits
methodically one by one until you have narrowed down the fault and localized it.
Experience shows that certain faults have symptoms which, may indicate the cause and the
probable location of the fault:
Example:
Symptom Probable cause Probable fault location
b) Fuse blows after a short Equipment partially grounded, Dampness or water in junction box,
period of time. overload. limit switch etc. due to damaged
electrical components.
Improperly connected equipment.
c) Platform stops or cannot Limit switch in stop circuit Stop pushbutton depressed, thermal
be started. has tripped/been actuated, relay actuated due to overload or
blown fuse. careless operation, *switch in safety
device actuated, power failure from
supply. See also a) and b) above.
d) Platform stops and can Switch actuated in the Switch in stop circuit improperly
be restarted, but then stop circuit. positioned.
stops again.
ALIMAK
ASSEMBLY G0
Before assenbly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G1
Pedestal arreangements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G2
Connection to power supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G4
Ground pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G5
Erection of single mast platform with pedestal base . . . . G6
Erection of twin masted platform . . . . . . . . . . . . . . . . . . . . . . . . . . . . G8
Electrical/mechanical horisontal levelling equipment . . G9
Permission
Make sure the chosen erection site meets the requirements set
by safety and regulatory authorities and that where required,
authorization to install and use has been granted.
Also check that the erection site is suitable with regard to local
wind conditions – if structures nearby create tunnel effects.
Erection site
Prepare installation so that electric power, light, lifting
equipment and tools are available, and that roads and the site
can receive the platform and the platform transport.
The A-System Platforms MUST NEVER be installed on mud,
snow, ice, or on unsuitable footings.
Where possible, preassemble of mast ties. Suitable places for
attaching the ties are balconies or other concrete or steel
structural members. Remember that these structures must be
strong enough to withstand the force of the ties and it is the
responsibility of the user / owner to ensure that in fact is xxxx
Height of guards rails for platform / extension facing the
structure must be according to local regulations.
Note that the distance between the work platform and another
machine MUST NOT be less 0.5 meter (1 ft. 8 in.)
Power supply
Jumper plugs
ALIMAK
Ground Pressure
G5
Maximum ground force P with 100 m (330 ft.) mast for:
A= √ P / Pf (m) or A= √ P / Pf x 12 (in.)
Example:
ALICLIMBER APF-50A on pedestal base.
The ground consists of gravel, with allowable ground bearing
pressure Pf = 96 kPA (2000 psf.)
g 20
Required size of the support plate is then:
ALIMAK
G6 Erection of single mast platform with pedestal base
Note that mast with a pedestal base must always be tied.
The first tie shall be mounted at a maximum height of 3 m
(10 ft.) from the ground/foundation.
1. Check under the heading ”Ground pressure” – to determine
if the ground has the required bearing capacity. Level the
ground and if required insert blocking under the jack feet.
2. Plumb the mast by means of the jacks and a plumb line or
spirit level in 2 directions.
3. Check that the jacks are equally loaded by comparing the
resistance in the respective jack handle.
CAUTION: Ensure that the founda tion or bedding has the
necessary bearing resistance. Install support
timber under the pedestal base plate. Note that
the pedestal base MUST NOT rest on the
levelling jacks alone.
pedestal base.
6. Connect the power cable to the inlet on the platform
electrical M-panel. The trailing power cable should be
installed with a cable bracket and placed as far out as
possible from the mast along the platform center line.
Then place the cable on the ground/ alternately into the
cable basket by twisting it so it falls by itself in spirals
forming a ring with the same diameter on every coil. Try to
form equal diameters and smaller then the inner diameter of
the cable basket.
Trailing power cable
g 88
Adjustment
1. Check that the platform is level between the masts.
If necessary slide one of the drive units to achieve this.
See instruction under the headline ”Sliding”.
2. Adjust the Teleflex cable by means of the nuts (A) so that the
space between linkarm (B) and push rod (C) is 2 mm (.08 in.).
If the space between (B) and (C) is too small sliding cannot
take place.
Increase
Reduce
Press
B
2 mm
(.08 in.)
C B
D
3. Release the link system and rotate down the linkarm (B) until
it contacts the rod. Loosen and slide the cam (D) up
against the linkarm. Tighten the cam in this position.
A similar adjustment shall be done with the other linksystem
on the other drive unit.
ALIMAK
Functional test of mechanical horizontal levelling equipment
G 13
1. Drive the platform upwards approximately 2 m (6.5 ft.) and
then switch off the main power.
2. Check that the platform is level between the masts.
3. Mark the positions of the drive units on the mast.
a
c
Horizontal plane
g 36
Platform
Adjustment
Adjust switches (E) so that their operators are just touching the
cams (D).
Drive unit type A levelling equipment Drive unit type B levelling equipment
E
D
g 74
Functional test
Test run and check that the inclination (b) of the platform does
not exceed ± 2°.
If the measures cannot be maintained – adjust the positions of
the electrical switches (E).
c bo
Horizontal plane
g 39
Platform
Caution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H1
Assembling work platform and railings . . . . . H2
1.8 m (6 ft.) extension of work platform . . . . . H3
Extension structural tubes . . . . . . . . . . . . . . . . . . . . . . H3
Extra long 2.7m (9 ft.) extension . . . . . . . . . . . . . . . H4
Railing cross members . . . . . . . . . . . . . . . . . . . . . . . . . . . H5
Erection of mast . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H6
Canopy/Weather protection . . . . . . . . . . . . . . . . . . . . H 15
Final operation before inspections . . . . . . . . . . . . H 12
ALIMAK
H1
CAUTION:
Before installation of the mast, mast ties and platform
sections, visually check for structural damage such as
deformation, cracks and corrosion.
If any structural damage or severe corrosion is seen on such
items as mast sections, mast ties or other load carrying
members, the platform must be immediately taken out of
service and the extent of the damage be determined.
Corrective action must be taken before the platform is put
into service again.
Equal
1 3
h 28
2 4
ALIMAK
H2 Assembling work platform and railings
A-50 System Mast Climbing Work Platforms (APF) can be
erected as a single or twin masted platform. By a combination of
1.5 (4 ft. 11 in.) and/or 0.82 m (2 ft. 8 in.) platform length
sections the platform can be adapted for most installations.
a 71
ALIMAK
Max. 1.8 m (6 ft.) extension of platform
H3
Extension of the platform is made by extension beams, post
brackets and posts according to the figure below.
The extension platform is built to accept planks of pine or
spruce dimension 32 x 125 mm (1 1/4 x 5 in.) or wider.
Alternatively water resistant plywood minimum thickness 12 mm
(1/2 in.) can be used. h 55
a 73
Post
Post bracket
IMPORTANT!
The extension beams must
be secured with lock bolts.
Extension of work platform with tied mast
Platforms extension cannot be located directly behind the mast.
Color marking
h 37
Color marking
Maximum allowable extension
ALIMAK
H4 Extra long 2.7 m (9 ft.) extension
h 48
h 55
IMPORTANT!
Do not forget to
Height of guard rails according to EN 1495
secure railings with lock bolts.
Local regulations must govern if more stringent.
1)
without midrail 2)
with midrail
h
h 31
Height of guard railing according to
d ANSI/SIA A92. 9 - 1993 (or OSHA)
Work platform
On all exposed sides ”h” = 42” ± 3” (1070 ± 75 mm).
Distance ”d” determines the use of guard railing according
to local regulations.
ALIMAK
Railing Cross Members
H5
The railing cross members shall be of high quality (for example
pine or spruce) with dimensions as per figures below for
different distances between the posts. Ensure the wood is in
good condition (i.e. no cracks, warps, knot holes).
height
min. height
see above.
Joint
h 38
h
Railing cross members according to EN 1495:
w Maximum distance Minimum dimension.
between the posts Top rail, midrail and toeboard w x h
ALIMAK
H6 Erection of mast
To be carried out by trained service personnel.
The erection crane is mounted into one of the two sleeves on the
drive unit. The mast sections can then be lifted to the platform
from the ground level. Always have the mast sections close to
the site of erection, and on dry firm ground.
Note that the maximum allowable load of the erection crane
can only be lifted vertically. Do not exceed the maximum
allowable load of the platform.
During mast installation cable guides and ties should be
installed at prescribed elevations. See chapter K.
DANGER !
Crushing hazard.
When platform is moving, always stand inside
platform railing to avoid being crushed by balconies,
scaffolds or other protruding structures.
Will cause severe injury or death.
h 40
1. Lift one mast section with the erection crane and grease the
guiding cones. Swing the section over the mast top, lower
and install mast bolts, tighten them. Insert mast bolts with the
nut located on top.
Tightening torque: 350 Nm (258 lbf x ft).
h 41
h 42
2. Drive the platform up so that the final limit switch leaves the
cam. See instructions under the heading ”Safety limit
override operation” – chapter D in this manual.
ALIMAK
3. Check that the normal lower limit and final lower limit cams
H7
are correctly mounted and that their attachment bolts are
properly tightened. Make a function test by driving down-
wards onto the cam.
Measure G LN LF LR
Rack
210
ALIMAK
H8 4. Drive the platform carefully up as close to the mast top as
possible in order to install the next mast section.
Connect and lift one mast section, grease and swing the
section out, lower and bolt.
Note that mast sections must not hang from the erection
crane during operation of the platform.
DANGER !
Missing bolt hazard.
Tighten all mast bolts on previously installed mast
sections before disconnecting mast section from
erection crane.
Will cause death or personal injury.
h 44
ALIMAK
6. Install the upper normal limit and final limit cams in the
H9
pre-drilled holes on the top mast section
7. Put covers on the top mast section tubes.
8. Make a function test of the normal limit switch by driving
onto the limit cam located on the top mast section.
9. Retighten all mast bolts on the way down. Tightening
torque 350 Nm (258 lbf x ft).
10. Install the mast protection screens on the drive unit/-s.
Measure UN UF
Rack
Upper final
limit cam
ALIMAK
H 10 Perpendicularity of the mast
Straight-edge
Check possible out-of plumbness of the mast with a plumb line,
spirit level or a theodolite, when installing the first tie. If a
correction required, adjust it by means of the mast tie.
When installing additional ties check verticality with a long
straight-edge rule, using the ground level plan and first tie as
references. Use a theodolite if desired, but never use a spirit
level above the first tie.
h 46
The use of a straight-edge will also indicate if the mast is
twisted.
Try to use the same or as few references as possible for the
Straight-edge entire mast installation.
Straight-edge rules may be fabricated on site. As an example,
they can be a 2” x 4” x 1.5 m (5 ft) long piece of timber and be
attached to the mast with tie wire. The straight-edge must be
properly attached.
Straight-edge
ALIMAK
Canopy/Weather protection
H 11
The weather protection frame is assembled in accordance with
Anchor alt. plug with sealing for roof
the figure below and covered with reinforced plastic cloth.
The cloth is attached with rubber straps and anchors into
existing reinforced grommets in four rows at a distance of l m
(3 ft.) along the cloth. Holes in the cloth for mast(-s) and gate
are cut with a knife.
Note – If the plastic cloth is properly stretched the wind forces
will be reduced.
h 77 Rubber strap
It is forbidden to use the canopys/weather protection with free
standing Aliclimbers.
Telescoping pipe
ALIMAK
H 12 Final operation before inspection
1. Remove the erection crane and all erection equipment from
the platform.
2. Execute service according to ”Service and Maintenace”
Schedule with the exception of items 2, 27, 28, 40, 41, 50,
52, 53 and 54 according to chapter “Service and Maintenance”.
3. Instruct the operator/-s regarding safety, safety regulations,
operating instructions, service and maintenance.
ALIMAK
PROJECTING HOIST MAST I0
Mast ties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I 1
Tie forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I 2
Tie distances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I 4
ALIMAK 30502
Mast ties
I1
Tying of the mast is dependent upon the desired mast height. If
the platform is equipped with mobile chassis, pedestal base or
protective canopy the mast must be tied in accordance with
instructions listed above. For each installation and set-up, the
type of tie must be chosen to suit the particular installation.
When using mast ties the mast must ALWAYS be facing the
structure face,
Where ties are to be attached to cast in place inserts, this must
take place early enough to ensure the concrete is cured and at its
required strength. Inserts must be suitably placed in the concrete
with proper reinforcing steel.
Owner/user is responsible for ensuring that the structure can
safely withstand tie forces.
Only Alimak genuine pipe clamps are to be installed.
ALIMAK
I2 Mast tie type R2A
The tie is preferably intended for single and twin mast
installations with drive unit type A. The tie can also be used
k 35
with drive unit type B – but only with one drive unit on the
mast!
L min. – max.
The tie is steplessly variable in vertical direction. The tie width
varies depending upon chosen length of the tie.
The distance between the wall and the mast center for this tie
type is anywhere from a minimum of 650 mm to a maximum of
2050 mm.
F
Max wall force P is calculated according to the following
B formula:
1165 (45.8 in.) 625 (24.6 in.) 9050 264-100 9002 931-000
1300 (51.2 in.) 696 (27.4 in.) –”– –”–
1400 (55.1 in.) 750 (29.5 in.) –”– –”–
1500 (59.0 in.) 804 (31.6 in.) –”– –”–
1600 (59.0 in.) 858 (33.8 in.) –”– –”–
1700 (66.9 in.) 911 (35.8 in.) –”– –”–
L
F
Max force P. is calculated according to the following formula:
B
P = L x 10600 x R1 x R2 x R3 [Newton (x 0.225 = lbf.)]
B
P P
As this tie cannot take up the torsional
Max force in bolt PS = 0.66 x P
force from the mast it shouldn´t be used
for single mast platforms at heights above Force F, parallel to the structures face
30 m (100 ft.).
F = 10600 x R1 x R2 x R3 [Newton (x 0.225 = lbf.)]
ALIMAK
Mast tie type S4A (ø 48.3 mm)
I3
– to be used with drive unit Type B only!
This tie is used for single masted installations – but only with
one drive unit on the mast! The tie takes up the torsion stresses
of the mast.
The tie is steplessly variable in vertical direction. The tie width
varies depending upon chosen length of the tie.
k 38
The distance between the wall and the mast center for this tie
type is anywhere from a minimum of 600 mm to a maximum of
2050 mm
Max wall force P is calculated according to the following
formula:
L min. – max.
P = L x 12000 Newton (L and B in mm) F = 12000 Newton
B
Mast tie L mm B
Part No. min. – max. mm
9069 193-080 min. 600 500 – 950 F
max. 850 600 – 900
B
9069 193-120 min. 850 700 – 1200
max. 1250 900 – 1100
P P
9069 193-160 min. 1250 800 – 1500
max. 1650 1000 – 1300
9069 193-200 min. 1650 1100 – 1900
max. 2050 1400 – 1600
ALIMAK
I6 Tie distances – Mobile chassis
1st tie installed at 15 m (50 ft.) height.
Subsequent ties at max. 15 m (50 ft.) intervals.
Max. overhang 6 m (20 ft.).
k 29
ALIMAK
Tie distances – Pedestal base
I7
1st tie installed at 3 m (10 ft.) height.
2nd and 3rd at 6 m (20 ft.) and 9 m (30 ft.) intervals respectively.
Subsequent ties at 15 m (50 ft.) intervals.
Max. overhang 6 m (20 ft.).
k 30
ALIMAK
INSTALLATION AND REMOVAL OF MAST TIE K0
ALIMAK 30502
Installation and removal of mast tie
K1
First ensure that the structure to be tied into can withstand the
maximum reaction forces that can occur in the ties. This is
the responsibility of the Owner/User.
Weather conditions
When installing and dismantling the ties the overhang must not
be greater than the tie distance plus an additional 1.5 m (5 ft.).
This only when the wind is not greater than 12 m/sec. (27 mph)
and any load on the platform is evenly distributed on each side
of the mast.
CAUTION: Install scaffold or similar equipment if tie
cannot be installed from the platform or the
structure due to excessive length.
Local safety regulations must apply.
CAUTION !
Tipping hazard with base pedestal.
Always dismantle the platform to a maximum
transport length of 4.5 m (15 ft.) before dis-
connecting the lowest (1st) mast tie.
Will cause severe injury or death.
WARNING!
Unintentional moving.
Always depress the red "Emergency Stop"-button to
prevent unintentional moving while work is carried
out on the mast. Turn the button to reset the switch.
ALIMAK
K2
Installation of mast tie
1. Install the adaptor plate and brackets inside the mast.
2. Attach the tie brackets.
3. Adjust the length of the tie pipes and install them with the
erection crane or other lifting device.
The pipe adjusting link screws must be screwed out to a
length of approximately 110 mm (4.3 in.) before installation
(See illustration).
Maximum length of adjusting link screws 130 mm (5.2 in.).
4. Straighten the mast. By adjusting the length of the tie
pipes the mast can be turned or adjusted sideways.
5. Tighten all bolts and ensure that the platform clears the
structure and the tie.
CAUTION: The maximum allowable horizontalinclination
of the mast tie is up/down 5°, i.e. 88 mm/m
(1.85 in./ft.).
This must never be exceeded.
max 13
0 mm (
before 5.2 in.)
installa
tion 11
0 mm (
4.3 in.)
Tie bracket
Adjust the length of the tie pipes as close to the tie length as possible,
moving the two pipes so that the holes coincide. Lock the pipes with bolts
and lock nuts.
Adjust the length ± 40 mm (1.6 in.) by turning the link screws in or out.
(Adjust equally on both sides). By adjusting the tie pipes, the length can be
adjusted further – even after the tie pipe has been anchored into mast and
wall (without having to remove the ends). Note that the link screws are
mechanically ”secured” and cannot be screwed off.
ALIMAK
TRANSPORT AND MOVEMENT L0
ALIMAK
Transport and movement
L1
The machine can be towed or moved by its own drive unit over
short distances. For longer distances it is recommended that
special transport vehicles be used. Only machine components,
e.g. platform parts and mast sections can be left on the platform.
The mast must always be dismantled during transportation on
public roads.
Remember to always disconnect and remove the power cable
before transportation.
l1
l2
ALIMAK
L2 Towing of platform with erected mast on a mobile
single or twin mast chassis
Platform with erected mast can be towed on the job site only if
the following is observed:
1. The platform is run down to bottom position an is sitting
on top of the rubber buffers.
2. Maximum 13 mounted mast sections.
3. Ensure that there are no high voltage lines or other
obstacles present in the area of movement.
4. The wind speed must not exceed 8 m/sec (18 mph).
5. The outriggers shall be completely extended and locked
and the jacks screwed down as near to the ground as
possible. i.e. within 25 mm (1 in.) of the ground.
6. Maximum allowable inclination of the ground = 1:25
or 2.3°.
7. It is prohibited to drive over ground obsticals larger than
10 cm (4 in.).
8. Maximum allowable towing speed is 8 m/min (25 ft./min.).
9. Ensure that the ground has the necessary bearing
capacity. Refer to the chapter entitled "Setting up" for
information on ground pressure.
ALIMAK279
Lifting with crane
L3
A 4.5 m (15 ft.) platform with mobile chassis (base unit) weighs
approx. 5000 kg (11000 lbs.) including 13 mast sections.
A 4.5 m platform with mast pedestal (base unit) weighs approx.
3500 kg (7700 lbs.) including 13 mast sections.
With a suitable crane connected to the lifting yoke at the mast
top, the platform with erected mast can be lifted with a crane. l3
l4
ALIMAK280
L4 To ensure that the work platfrom can not be operated while the
self-powered machinery is used, the main power cable must be
disconnected from the platform electrical M-panel and
connected to the power connector of the self-powered
machinery.
a 163
WARNING!
Kick-back hazard.
Always use the extra support wheel for the chassis
tow bar and do not walk next to the tow bar.
Can cause severe personal injury.
l6
ALIMAK
Appendix
Tightening torque
Recommendations according to the chart on the following page
applies in general except for:
Recommended torques
The chart applies to galvanized screw and nut of strength class
8.8 – dry surface.
M6 10 mm 10 Nm (7 lbf x ft)
M8 13 mm 24 Nm (18 lbf x ft)
M 10 17 mm 47 Nm (35 lbf x ft)
M 12 19 mm 81 Nm (60 lbf x ft)
M 14 22 mm 128 Nm (95 lbf x ft)
M 16 24 mm 198 Nm (146 lbf x ft)
M 20 30 mm 385 Nm (285 lbf x ft)
ASSEMBLY CONTROL – CHECK LIST
The assembly is to be carried out by trained/authorized personnel only.
The assembly is to be carried out by trained/authorized personnel only.
Please mark with a cross to the right to confirm that:
1. the installation as in accordance with the latest instruction manual as it pertains to: Yes
a) Foundation for outriggers.
b) That the outriggers are extended and locked.
c) The length of the platform.
d) The platform´s widening regarding performance and choice of material.
e) Safety railings.
f) Mast ties.
2. the load sign agrees with the actual installation (see Instruction Manual).
4. visual inspection is carried out regarding mechanical damages on structural parts such as;
a) Outriggers with jacks.
b) Chassis.
c) Platform.
d) Extending parts.
e) Machinery frame with machinery.
f) Mast.
g) Mast tie.
11. Check that the area is barricaded and a sign displaying ”Working Area” is in place.
12. Check that the user has received information about safety and operating
instructions, service and maintenance.