This document summarizes the slab design calculations for slab FS1 located in area 1-2 A-B. Key details include:
- Dimensions of 5600mm x 5000mm with 200mm thickness
- Total factored load of 24.82 kN/m^2
- Required steel reinforcement of 582mm^2 which satisfies deflection check of 1.00
- Recommendation to increase slab depth as deflection governs the design
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
126 views2 pages
Case 9: Four Edges Discontinuous
This document summarizes the slab design calculations for slab FS1 located in area 1-2 A-B. Key details include:
- Dimensions of 5600mm x 5000mm with 200mm thickness
- Total factored load of 24.82 kN/m^2
- Required steel reinforcement of 582mm^2 which satisfies deflection check of 1.00
- Recommendation to increase slab depth as deflection governs the design
Case 9: Four edges discontinuous Span and support coefficients, Bx, By, Bsx, Bsy = 0.067; 0.056; 0.000; 0.000
Moment based on the above coefficients (before redistribution):
Short span moment, Mx = Bx*WL = 0.067 *620.50 = 41.61 Long span moment, My = By*WL = 0.056 *620.50 = 34.75
Summary of Moment, Steel Area Required, Rebar Provided:
Mxx Myy Msy1 Msy2 Msx1 Msx2 Moment 34.75 41.61 0.00 0.00 0.00 0.00 Area 513 582 300 300 300 300 Rebar T10-150 T10-125 T10-250 T10-250 T10-250 T10-250
Deflection Check:
Dimensions Y, 5000 < X, 5600 AND bottom of bottom(BB) rebar is spanning Y-
direction: So effective depth, d = Thickness - cover - YRebar/2 = 200-20-10/2 = 175.0 mm Span/depth's ratio, Ar = l/d = 5000/175.0 = 28.6 Basic Span/depth's ratio, Br = 20.0 A = 2fyAs,req /(3As,prov) = 2*460*582/(3*628) = 284.0 B = 120*( 0.9 + M/(b*d^2) ) = 120*(0.9+41.61*1000/(175.0*175.0)= 271.1 Modification Factor, MF = 0.55 + (477 - A)/B = 0.55+(477-284.0)/271.1 = 1.26 Slab deflection ratio = MF*Br/Ar = 1.26*20.0/28.57 = 0.88 Area after deflection check = 747 A = 2fyAs,req /(3As,prov) = 2*460*582/(3*747) = 238.9 Modification Factor, MF = 0.55 + (477 - A)/B = 0.55+(477-238.9)/271.1 = 1.43 Slab deflection ratio = MF*Br/Ar = 1.43*20.0/28.57 = 1.00 Deflection governs the design, consider option to increase depth! Ratio >= f1 : Deflection check PASSED
Deflection governs the design, Steel Area Provided After Deflection Check: Steel Area = 747 ; Use T10-100 -----------------------------------------------------------