The document is an out of class time log tracking activities and hours spent outside of class. It lists various dates from February 7 to March 29 with the corresponding times, activities, and hours spent on each activity. The main activities include reviewing a case for trial, creating a senior project presentation, contacting venues, working on a trial, finishing a powerpoint, filming and editing a video for the presentation. The total hours spent outside of class exceeded 20 hours as required.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
42 views1 page
Out of Class Time Log
The document is an out of class time log tracking activities and hours spent outside of class. It lists various dates from February 7 to March 29 with the corresponding times, activities, and hours spent on each activity. The main activities include reviewing a case for trial, creating a senior project presentation, contacting venues, working on a trial, finishing a powerpoint, filming and editing a video for the presentation. The total hours spent outside of class exceeded 20 hours as required.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
Out of Class Time Log
Use this chart to keep track of hours spent outside of class. You must accumulate at least 20. (Do not include research paper work or work on Weebly.)
Date Time Activity Hours
Feb 7 4 Reviewed case for trial 2 hours and played around editing it to fit how i wanted it Feb 10 730 Talked with mother about things needed 25 mins for event and created list Feb 11 8 Contacted Capt. Gonse about possibly using 10 mins building at the courthouse for senior project Feb 19 930 Discussed areas with 15 mins mom about who I can have come to my project Feb 20 1230 Talked to Capt. Gonse 15 mins about venues Feb 23 12ish emailed venue about 20 mins time and dates Feb 26 8ish emailed venue about 5 mins time and dates March 6 6ish searched for videos for presentation and 3 hours started powerpoint March 8 7 found videos to use for 1 hour 30 mins specific activities March 11 12 worked on finishing 3 hours 30 mins trial March 12 6 finish trial 2 hours March 17 4 flyers finished 30 mins March 23 5 Put together 3 hours powerpoint March 27 9 Filmed trial 1 hour 30 mins March 28 6 edit video and insert 2 hours 20 mins into powerpoint March 29 5 project 1 hour 30 mins