1. The document lists equipment tags for several pieces of equipment in a process including a PIPB column, reboiler, condenser, and residue cooler. 2. It also lists the pipe sizes connecting this equipment including 12" and 1 1/2" pipes and the tags for the associated valves. 3. Safety equipment for the system includes a pressure safety valve and a flare.

Uploaded by

Alexis Flexy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
645 views1 page

Plano-Final Final PDF

1. The document lists equipment tags for several pieces of equipment in a process including a PIPB column, reboiler, condenser, and residue cooler. 2. It also lists the pipe sizes connecting this equipment including 12" and 1 1/2" pipes and the tags for the associated valves. 3. Safety equipment for the system includes a pressure safety valve and a flare.

Uploaded by

Alexis Flexy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8

V-1022 EA-1010 EA-1009 EA-1009 E-1014


E-1010 PIPB COLUMN PIPB COLUMN PIPB COLUMN RESIDUE
A REBOILER CONDENSER PT PCI
PAH CONDENSER COOLER PY-1096
A
1096 1096
107-13
PAL
SIZE 4”X6”
PSV SET O. 4MPaG
P-1171-12”-C03-PP (NOTE 4)
1067
NO POCKETS
2”
12” P-1332-6”-C03-PP FLARE
1 1/2” PG
1 1/2”
TI TE 1097
1098 1098
P-1006A/B P-1172-4”-C03-PP
3” 42 20” MH
REFLUX P-1192-3”-C03-PP
107-13
42
P-1178-1 1/2”-C03-HC 1 1/2” 28
EA-1009
LIC
1035
I LAL 3”
P
FIC FY
LT LG
B 1081 1081
1035 B
1036 T-1004
3”
20” MH
FE FT FV HS
6” M
1081 1081 1081 F03 CO3 P-1174-6”-C03-HC NO POCKETS GRAVITY FLOW TG PI 1031
27 2
(NOTE 1) 1 1/2” 1099 1107
MH NO POCKETS (NOTE 1) V-1004
P-1176-3”-C03-HC 3” 20” P-1173-4”-C03-PP GRAVITY FLOW
26 107-13
1 1/2” TG
25 1105
PG
16
1098
1 1/2” 7 1 1/2” TG
T-1003 P-1185-1 1/2”-C03-HC
P-1144-6”-C03-HC (NOTE 1) 1100
107-10 LINE P-1105
12” P-1188-1 1/2”-C03-HC
12”x6” 20” MH CVR-1004-1”-2 0A3 107-10
6
I
P HS CWR NOTE 4
FIC FY 1038
1083 1083
FS0V
C 1083 TG
C
I 1103
S PG 1 1/2”
I FE FT 5 TAH
P FV R TI 1099 1 1/2”x3/4”
HS-1005-2”-11.OA2-H 1038 1038 1038 1101
FY FIC TAL

P-1184-6”-C03-HC
1082 1082 1
FS0V 4.2S 1 1/2” PT PI
1082 FC 1106 1106
(NOTE 2)
1 1/2” E-1014
I TE
PIPB RECYCLE S
2 FE 1” 1101 3”
P-1175-3”-F03-HC FV FT 2”
R 1082 HS-1001-1.5”-11.OA2-H
1082 1082 SIZE 1”X2” 20”
E-1012 4”x3” SET 2 4.6MPaG PSV
(NOTE 4) 20”x6” 1 1/2”x3/4”
107-5 1093 PG LAH 1 1/2”
FC 3” 1 1/2” 6” LG LT LCI
PI PT 1 1/2” 1034 1033 1033
TE E-1020
1105 1105 LAL P-1187-1 1/2”-F03-PP
1102 107-18
PRIMING LINE P-1178-1 1/2”-C03-HC

P-1430-3/4”-F03-HC
HS-1015-1”-11.OA2-H 1”
E-1010 20” MH
SC P-1429-3/4”-F03-HC 1/2” 3” C03 F03 3/4”

PRIMING LINE
20 CWS-1004-1”-2 0A3
3” 2”
B 6”
2”

P-1186-1 1/2”-C03-HC
D TI S0 D
HS-1009-2”-11.OA2-H CWS
1102
I
TAH P
LIC LT LG NOTE 4 TI
1031 10” 10”x8” 1104 FIC FY
1032
HS-1005-1”-11.OA1-H
1031
P-1174-6”-C03-HC

18” 1184 1184


MINIMUM

P-1183-6”-C03-HC
MH
2”
E-1020 DISTANCE
P-1177-2”-F03-PP TE PG
107-18 LY FE FT FV
PUMPOUT 3” 1104 1104
1031 1184 1184 1184
LV
1031
2” V-1022 PS
RESIDUE PURGUE
V-1028
107-21
P-1181-8”-C03-HC FC
4.2SC (NOTE 3)
P-1417-3/4”C03-HC
FC
P-1416-3/4”C03-HC
P-1182-1 1/2”-C03-HC
P-1183-6”-C03-HC
P-1176-4”-F03-HC
F03 CO3

C03 FO3
E E

F03 CO3
PG F03 CO3 PG
1100 1101 PG
PG 1103
1102
3/4” 3/4” 3/4” 3/4”
1/2” 1/2”
1/2” Material Cantidad
P-1007A P-1007B P-1008A P-1008B Fecha Nombre Firma
1
Proyectado 31/05/17 Hidalgo-Sinailin
F Dibujado 31/05/17 Hidalgo-Sinailin Denominación Escala
P-1007A/B
P-1008A/B Revisado Ing. Loza David
PIPB 31/05/17 DIAGRAMA P&ID 1:100
Aprobado 31/05/17 Ing. Loza David
Universidad de las Fuerzas Armadas-ESPE Código
PLN-P&ID-MCT16
Departamento de Energía y Mecánica
1 2 3 4 5 Quito-Ecuador Sustituye a: Hoja 01/01