0 Methodology
The panel was switch on and the valves were set as follows for open tank - tank 1
OPEN - MV10,MV11,MV12,MV21,MV23,MV3
CLOSE- MV1,MV2,MV4-MV9,MV13-MV20,-MV22,BV1
Sample from feed tank was taken and the density was measured using a hydrometer.
Pump 2 was switch ON and the water level was observed until its overflow.
Pump 2 was switch OFF and the process was left for a few minutes to stabilize.
Hence, to improve the accuracy, replace the bend passage for the flow with a straight passage. The
globe valve should be seated parallel to the line of flow of the liquid, so that it can be used to
throttle the flow to any required degree, or to give positive shut-offs. When the valve is fully open,
it allows straight passage through an opening that is the same size as the inside diameter of the
connecting pipe, thus reducing the pressure drop inside the pipe to produce a more accurate density
measurement.