Engr. Khalid Yousaf-Roads
Engr. Khalid Yousaf-Roads
Engr. Khalid Yousaf-Roads
CURRICULUM VITAE
E-mail: [email protected]
Cell # +923217182339
+923135680086
CAREER OBJECTIVE:
My objective is aimed towards applying my knowledge and to excel in the life to explore new dimensions
and to obtain a challenging position in an organization, where accomplishments are rewarded with
responsibility and advancement, which will maximize my natural strengths as a problem solver and where
my experience, formal education and technical expertise will have a direct influence on institutional growth.
PERSONAL PROFILE
ACADEMIC QUALIFICATIONS
Additional Education
OFFICE MANAGEMENT
MS WORD
MS EXCEL
MS POWER POINT
PROFESSIONAL PROFILE
Project 01: Construction of Metalled road from Vehova to Binda from Km No.0.00 to 8.00 Length =
8.00 KM, District Dera Ghazi Khan.
Project 02: Construction of Metalled road from Thul Janan to Mud Rindan U/C Thul Ali Muhammad,
Tibbi Lundan Length = 14 KM, District Rajanpur
Project 03: Widening/Improvement of road from Dajal to Harrand from Km No.0.00 to 5.55 Length =
5.55 KM, District Rajanpur
Project 04: Rehabilitation / W/I of Metalled road from Sheroo Adda to Nala Soon Road Length = 6.50 KM
(Phase-I to Phase-IV).
Project 05: Construction of Road from Chak No. 530/TP to Goormani Chowk, Chak No. 528, Length
11 Km (Phase-I Length = 7.00 KM)
Project 06: Metalled Road from Sohni Chowk to Rampur Hospital (24 Feet) 7.00 KM (Phase-I
Length = 3.70 KM)
Project 07: Construction of Metalled road from Chak No.157/TDA to Chak No. 425/ TDA via Chak
No.169/TDA Length = 19.70 KM (Phase-I Length =11.55 Km)
Project 08: Const. of Metalled road from Chak No.160-A/TDA to MM Road via Chak No.150, 151,
145, 140, 142 & 154-A, Layyah Length = 39.00 KM (Phase-I Length = 26 Km).
Project 09: W/I of Road from Heera Adda to Ghalloo MOR via Ladhana & Pir Jaggi Sharif, Length =
37.80 Km.
OFFICE OF THE
SUPERINTENDING ENGINEER
HIGHWAY CIRCLE DERA GHAZI KHAN
064-9260521 064-9260522
Email: [email protected] , [email protected]
To,
Resident Engineer,
M/S ESC Consultants (ADP 2016-17),
D.G.Khan.
It is requested that the requisite staff for Resident Supervision / TPV of the following
schemes may be deputed so that the works are started / completed at the earliest.
Sr. Progr- Estimated Provision
Name of Project Consultancy
No. amme Cost Cost
DISTRICT D.G.KHAN
1. ADP Construction of Metalled Road from Aali Wala – Ghous Abad Road 3.971 0.077
5
You are directed to mobilize your resident supervisory staff immediately to attend respective
projects.
CC:-
Study Tours
Visit to Head Khanki on Chenab River.
Visit to Mangla Dam.
Visit to Waste Water Treatment Plant in Faisal Abad.
Visit to Jinah underpass and Karim block Link Road.
Reference
Available on request.
Declaration
I hereby declare that the details mentioned above are true to the best of my knowledge.
. Khalid Yousaf