0% found this document useful (0 votes)
78 views1 page

Call Sheet 1

This call sheet provides details for the filming of the music video "Cupid" by Alexandra Savior, including the contact information for the director and sole crew member Georgina Crouch. Filming will take place at an indoor location and involve shooting the artist against a photo wall and on a bed between 9:30AM and an estimated wrap time of 2:30PM. The call sheet outlines the filming schedule and locations but does not include any additional attached documents.

Uploaded by

Georgina Crouch
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views1 page

Call Sheet 1

This call sheet provides details for the filming of the music video "Cupid" by Alexandra Savior, including the contact information for the director and sole crew member Georgina Crouch. Filming will take place at an indoor location and involve shooting the artist against a photo wall and on a bed between 9:30AM and an estimated wrap time of 2:30PM. The call sheet outlines the filming schedule and locations but does not include any additional attached documents.

Uploaded by

Georgina Crouch
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CALL SHEET DATE: 30/11/2017

TITLE: Alexandra Savior- Cupid Producer: Georgina Crouch

PERSONNEL CONTACT: Name & Mobile Number


Director: Georgina Crouch Producer: Georgina Crouch
P.A: N/A
Camera: Georgina Crouch Camera Assist: N/A
Sound: N/A Sound Assist: N/A
Gaffa: N/A Make-Up: Emma Bennett
Other technical: Georgina Crouch Principle Cast: Emma Bennett

LOCATION INFORMATION:
Address 1: Glebe Road, Norwich, NR23JQ Arrival Time: 9:30AM
Contact Name/No: 07814238575

Travel: Walk Parking: N/A


Map attached: Yes/No

Grid Ref: N/A

SCENES TODAY (Summary)


All shots against photo wall.
All shots on bed.

SCHEDULE:
9:00AM- Crew begin setting up indoor location with props,
visual pieces, equipment: lighting, camera, tripod, gels
9:30AM- Actor to arrive on set and get changed into first
outfit for filming
9:45AM- Begin filming against photo wall
10:30AM- Break
11:00AM- Change gels and continue filming against photo
wall
12:00PM- Lunch
1:00PM- Set up bed scene, actor to get changed into second
outfit for filming
1:15PM- Begin filming shots on bed
2:00PM- Finish filming on bed, begin clearing equipment,
actor to get changed out of outfit.
2:30PM- WRAP

Estimated Wrap: 2:30PM

Attached sheets:
Equipment: Yes/No Accommodation Details: Yes/No
Props: Yes/No Catering: Yes/No
Risk Assess Advice: Yes/No Other:

You might also like