17 - Painting Works

(1) The document identifies hazards, assesses risks, and recommends controls for painting work at a construction site. Hazards include vehicle strikes, improper lifting, slips/falls, fires, and chemical exposures. (2) Risks are evaluated based on probability, severity, and assigned a risk level from 1-8. Controls recommended include controlling vehicle speeds, proper lifting techniques, safe material storage, fire prevention measures, and use of personal protective equipment. (3) Personal protective equipment is identified as a control for risks involving chemical exposures through skin contact or inhalation of paints and thinners. Training workers on proper use of PPE is also recommended.

Uploaded by

Rafee Pie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
57% found this document useful (7 votes)
6K views2 pages

17 - Painting Works

(1) The document identifies hazards, assesses risks, and recommends controls for painting work at a construction site. Hazards include vehicle strikes, improper lifting, slips/falls, fires, and chemical exposures. (2) Risks are evaluated based on probability, severity, and assigned a risk level from 1-8. Controls recommended include controlling vehicle speeds, proper lifting techniques, safe material storage, fire prevention measures, and use of personal protective equipment. (3) Personal protective equipment is identified as a control for risks involving chemical exposures through skin contact or inhalation of paints and thinners. Training workers on proper use of PPE is also recommended.

Uploaded by

Rafee Pie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD. FORM NO.

HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL REV.


Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
R4 / BBR111, Bandar Bukit Raja 2, 17. Painting Works
Klang, Selangor. Date: Date:

17. Painting Works


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

Mechanical (4) To control lorries speeding at site. (max.15km/h)


-Minor injury (5) Workers stay away from moving vehicle / lorry.
Struck by moving part of 2 3 6
-Damage to property - Traffic controlled by designated person.
Delivery of Material vehicle. (lorry) (6) To provide appropriate PPE.
Loading and
1 Project Manager
unloading material
(paint barrel) Physical ( Ergonomic ) (5) Manual handling / lifting should be carry out with Site Manager
Spine injury - Improper method -Negligible injury 2 3 6 correct method. Site Agent
of handling (6) To provide appropriate PPE.
Site Engineer
Site Supervisor
Physical (5) Supervised by designated person during stacking of
material. SHO / SSS
Slip / fall / collapse of material
-Minor injury 2 3 6 - To ensure material not obstruct any access / walkway. EO
due to poor material - Proper storage of material.
arrangement. (6) To provide appropriate PPE. Scaffolder
Stacking / Storing
2 Work Leader
Material at site / store
(5) Proper storage of flammable liquid / material. Machinery opr/
Chemical
-Serious injury - No person are allowed to smoke in the store room. Driver
Burn / Fire 2 4 8
-Damage to property - To provide fire extinguisher in the store room.
(by flammable liquid/material ) (6) To provide appropriate PPE. Signalman
Banksman
Rigger
Chemical -Serious injury
(5) Training for workers use PPE.
Skin contact with paint / (long term can impair 2 4 8 (6) To provide appropriate PPE.
Welder
thinner. worker skin dermatiti ) Workers
Dilute paint with
3
chemical (thinner) -Serious injury
Chemical (long term can effect (5) Training for workers use PPE.
2 4 8
Inhalation human respiration (6) To provide appropriate PPE.
systems)

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Painting Works (Cont’d)


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

Project Manager
Chemical -Serious injury Site Manager
(5) Training for workers use PPE.
Skin contact with paint / (long term can impair 2 4 8 (6) To provide appropriate PPE. Site Agent
thinner. worker skin dermatiti )
Site Engineer
Site Supervisor
SHO / SSS
EO
-Serious injury
Chemical (long term can effect (5) Training for workers use PPE. Scaffolder
4 Painting 2 4 8
Inhalation human respiration (6) To provide appropriate PPE. Work Leader
systems)
Machinery opr/
Driver
Signalman
(5) Material handling should be carried out with correct Banksman
Physical (Ergonomic)
method. Rigger
Redundant repeated working -Negligible injury 2 3 6 - Take a 2-3 minutes rest after every 2 ( two ) hours.
behavior. (6) To provide appropriate PPE. Welder
Workers

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)