Steam Quantity Estimation

The document estimates steam requirements for heating various tanks on an oil tanker. It finds that the largest steam demand is 8,125 kg/hr for heating a 5,000 cubic meter HFO storage tank from 30 to 40 degrees Celsius. Additional demands include 4,062 kg/hr for a 1,000 cubic meter settling tank, and 312 kg/hr for a 55 cubic meter clean tank. Adding a 10% allowance for losses, the total estimated steam demand is 13,762 kg/hr.

Uploaded by

Suprabho Islam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
144 views8 pages

Steam Quantity Estimation

The document estimates steam requirements for heating various tanks on an oil tanker. It finds that the largest steam demand is 8,125 kg/hr for heating a 5,000 cubic meter HFO storage tank from 30 to 40 degrees Celsius. Additional demands include 4,062 kg/hr for a 1,000 cubic meter settling tank, and 312 kg/hr for a 55 cubic meter clean tank. Adding a 10% allowance for losses, the total estimated steam demand is 13,762 kg/hr.

Uploaded by

Suprabho Islam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Steam Quantity Estimation for Tank heating

1. HFO Storage Tank


Capacity = 5000 KL
Initial Temperature = 30 Deg. C
Final Temperature = 40 Deg. C
Mass of HFO = 5000000 Kg
Time for Batch heating = 6 hr
ecific Heat Coefficient (Average within the temp range)= 2.1 Kj/Kg-Deg.K
Steam Pressure = 3.5 Bar
Latent heat of condensation = 2153.79 Kj/Kg

Heating required = 105000000 Kj


Steam flow required= 8125.2 Kg/hr

2. HFO Settling Tank


Capacity = 1000 KL
Initial Temperature = 40 Deg. C
Final Temperature = 65 Deg. C
Mass of HFO = 1000000 Kg
Time for Batch heating = 6 hr
ecific Heat Coefficient (Average within the temp range)= 2.1 Kj/Kg-Deg.K
Steam Pressure = 3.5 Bar
Latent heat of condensation = 2153.79 Kj/Kg

Heating required = 52500000 Kj


Steam flow required= 4062.6 Kg/hr

3. HFO Clean Tank (55 KL)


Capacity = 55 KL
Initial Temperature = 65 Deg. C
Final Temperature = 100 Deg. C
Mass of HFO = 55000 Kg
Time for Batch heating = 6 hr
ecific Heat Coefficient (Average within the temp range)= 2.1 Kj/Kg-Deg.K
Steam Pressure = 3.5 Bar
Latent heat of condensation = 2153.79 Kj/Kg

Heating required = 4042500 Kj


Steam flow required= 312.82 Kg/hr
Steam Quantity Estimation for Tank heating

4. Sludge Collecting Tank (1 KL)


Capacity = 1 KL
Initial Temperature = 30 Deg. C
Final Temperature = 50 Deg. C
Mass of Sludge = 1000 Kg
Time for Batch heating = 6 hr
ecific Heat Coefficient (Average within the temp range)= 2.1 Kj/Kg-Deg.K
Steam Pressure = 3.5 Bar
Latent heat of condensation = 2153.79 Kj/Kg

Heating required = 42000 Kj


Steam flow required= 3.25 Kg/hr

5. Drain Tank (300 L)


Capacity = 0.3 KL
Initial Temperature = 65 Deg. C
Final Temperature = 100 Deg. C
Mass of HFO = 300 Kg
Time for Batch heating = 6 hr
ecific Heat Coefficient (Average within the temp range)= 2.1 Kj/Kg-Deg.K
Steam Pressure = 3.5 Bar
Latent heat of condensation = 2153.79 Kj/Kg

Heating required = 22050 Kj


Steam flow required= 1.71 Kg/hr

Estimated total steam required for tank heating = 12505.59 Kg/hr


Steam Quantity Estimation for separators, line heater and engine

1. HFO Purifiers:
Capacity = KL
Initial Temperature = Deg. C
Final Temperature = Deg. C
Mass of HFO = Kg
Time for Batch heating = hr
pecific Heat Coefficient (Average within the temp range)= Kj/Kg-Deg.K
Steam Pressure = Bar
Latent heat of condensation = Kj/Kg

Heating required = 0 Kj
Steam flow required= #DIV/0! Kg/hr

2. LO Purifiers:
Capacity = KL
Initial Temperature = Deg. C
Final Temperature = Deg. C
Mass of HFO = Kg
Time for Batch heating = hr
pecific Heat Coefficient (Average within the temp range)= Kj/Kg-Deg.K
Steam Pressure = Bar
Latent heat of condensation = Kj/Kg

Heating required = 0 Kj
Steam flow required= #DIV/0! Kg/hr

3. Viscosity Controller (Line Heater):


Capacity = KL
Initial Temperature = Deg. C
Final Temperature = Deg. C
Mass of HFO = Kg
Time for Batch heating = hr
pecific Heat Coefficient (Average within the temp range)= Kj/Kg-Deg.K
Steam Pressure = Bar
Latent heat of condensation = Kj/Kg

Heating required = 0 Kj
Steam flow required= #DIV/0! Kg/hr
Steam Quantity Estimation for HFO line tracing

1. Steam tracing for 40 Deg. C. transfer line


Estimated heat loss from pipe = 6 w/m
Length of Pipe = 90 m
Latent heat of condensation = 2153.79 Kj/Kg

Steam flow required= 0.90 Kj/hr

2. Steam tracing for 65 Deg. C. transfer line


Estimated heat loss from pipe = 11.5 w/m
Length of Pipe = 30 m
Latent heat of condensation = 2153.79 Kj/Kg

Steam flow required= 0.58 Kj/hr

3. Steam tracing for 100 Deg. C. transfer line


Estimated heat loss from pipe = 11.5 w/m
Length of Pipe = 200 m
Latent heat of condensation = 2153.79 Kj/Kg

Steam flow required= 3.84 Kj/hr

Estimated total steam required for tank heating = 5.32 Kg/hr


Adding Allowance
Area Tank/Equip/Line Qty Steam Demand (Kg/Hr) (Kg/hr)
HFO storage tank 1 8125.2 8937.7
HFO settling tank 1 4062.6 4468.9
Outside Engine Hall HFO clean tank 1 312.8 344.1
HFO purifier 1 0.0
Steam Tracing 1 3.4 3.7
Drain Tank 1 1.71 1.9
Sludge Tank 1 3.25 3.6
Inside Engine Hall LO purifier 1 0.0
Viscosity controller 1 0.0
Steam Tracing 1 2 2.1
Total Steam Demand :
Total Steam demand within
the area (kg/hr)

13754.4

7.6

13762.0
Useful Conversion:
Bar
3.5
Kg/hr
4000
Useful Conversion:
Psig
50.76326
Lb/hr
8818.49