Jps Strategic Plan
Jps Strategic Plan
Jps Strategic Plan
Goal: To manage the usage and allocation of water resources safely, fairly, equitably and in a sustainable manner consistent with Integrated Water Resources
Management (IWRM) principles
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
1.1 Adopt IWRM as a key enabler 1.1.1 Assisting NRE in formulating IWRM Framework Review of National Water Resources Q2 2010
to effective and efficient water a national water resources policy NWR Policy Study (2000-2050) and Formulation of
resources management through (NWRP) and comprehensive National Water Resources Policy
water resources legislation and NWR Model Law
Practising integrated water
resource management guideline.
Kedah Water Resources Q4 2007
Balancing withdrawal/use Enactment 2007.
and conservation of water
Protecting and allocating
water resources
1.1.2 Achieve capacity building Detailed and highly focused Study on Effective Implementation of Q3 2008
(CB) within water-related CB plan targeted to prioritized IWRM
institutions to promote fair and sectors (Agriculture, industry,
equitable water sharing among hydropower and domestic)
sectors. MSc in IWRM (Open University)
1.1.3 Institute efficient water Standardization of SIRIM‟s ISO 9001:2000 Certification Q4 2008
resources management. hydrological data (ISO
9001:2000 certification
Page | 1
Goal: To manage the usage and allocation of water resources safely, fairly, equitably and in a sustainable manner consistent with Integrated Water Resources
Management (IWRM) principles
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
1.2 Maintain a dynamic rapport 1.2.1 Ensure water sectors Enhanced implementation of MyCapNet, MyWP (GWP SEA), M. Env Sc Q1 2008
with key stakeholders through networking (national, regional and Capacity Building (IWRM, OUM), Network of River Basin
effective management international) programmes Organisation (NARBO), AWGWRM
Promote political awareness
of the water sectors Establishment of ASEAN Water Quality
Mobile mass media/NGO‟s Database System
over water awareness
Develop multi-stakes Workshop on IWRM for ASEAN
discussion and dialogue on countries
relevant solutions.
To monitor the Effective Implementation of Integrated
implementation of agreed Water Resources Management in
solutions and amend the Malaysia
policies based on feedbacks
Page | 2
Goal: To manage the usage and allocation of water resources safely, fairly, equitably and in a sustainable manner consistent with Integrated Water Resources
Management (IWRM) principles
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
1.2.2 Reinforce the water sector Reliable parameters on Integrated Water Resources Study for Q4 2009
database and make easy water quality identified the Northern Region of Peninsular
dissemination and standardized Malaysia
(July 08 – July 09)
Reliable groundwater
data and analysis Study of the Impact of Land
Development Activities on Water
Online information Resources of Sg. Kelantan and the
dissemination Development of the Conservation Plan
(Okt 08 – Apr 2010)
Page | 3
Goal: To manage the usage and allocation of water resources safely, fairly, equitably and in a sustainable manner consistent with Integrated Water Resources
Management (IWRM) principles
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
1.2.3 Encourage dialogue among More focus on agencies Report on Stakeholder Engagement Plan Q4 2007
stakeholders at different level and roles with 5 focus areas
locations and publish the outcome
of the consultation
Enhance awareness Study on Effective Implementation of
among stakeholders IWRM in Malaysia
1.2.4 Promote wise water use of Equitable and fair distribution Study on Effective Implementation of Q1 2008
all users of water availability IWRM in Malaysia
1.3 Adapt sound water resources 1.3.1 Review and update Enhanced service delivery DID Manual Q1 2009
management practices to ensure guideline regularly system MSMA – River Engineering
adequate, safe and affordable
water services: Coastal Guideline – Coastal Engineering
Provide safe water to All ii) Pelan Induk Tebatan Banjir-BTB
Adopt water demand
management
Improve waste water
management
Improve governance
Go for capacity building
Promote public-private
partnership
Page | 4
Goal: To manage the usage and allocation of water resources safely, fairly, equitably and in a sustainable manner consistent with Integrated Water Resources
Management (IWRM) principles
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
1.3.2 Introduce water related Awareness and capacity Hydrological and river Expedition Q4 2008
extra-curricula into the education building
system Reference manuals World Water Monitoring Programme 2008
(18 September – 18 October 2008)
1.3.3 Promote greater cooperation Effective enforcement and Water Resources Enactment 2007 Q4 2010
among stake holders compliance LUAS Enactment
1 State -1 River programme
Ops Lumpur & Ops Pasir
Page | 5
FOCUS AREA #2 : CLEAN, LIVING AND VIBRANT RIVERS
Goal: To develop and implement IRBM Plan for every river basin for a holistic and sustainable development
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
2.1 To intensify river 2.1.1 Identify, plan, design and Improvement in river flow River rehabilitation Q4 2009
conservation program carry out river conservancy works and carrying capacity - 14 River rehabilitation projects
such as proposed
River desilting Enhancement of river 1. Sg. Perlis
River corridor landscaping regime. 2. Sg. Petani
River bank protection works 3. Sg. Pinang
Bring nature back to rivers 4. Sg. Kinta
in terms of „clean, living and 5. Sg. Penchala (Selangor)
vibrant rivers‟
6. Sg. Penchala (Kuala Lumpur)
7. Sg. Temiang
Improvement in river
8. Sg. Melaka
erosion control
9. Sg. Skudai
10. Sg. Galing
Compilation of best
practices in river 11. Sg. Hiliran
management 12. Sg. Pengkalan Chepa
13. Sg. Miri
14. Sg. Papar
Page | 6
Goal: To develop and implement IRBM Plan for every river basin for a holistic and sustainable development
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
2.2 To promote the use of non- 2.2.1 To prepare blueprint for Completion of the IRBM Preparation of Sungai Kedah Basin Q2 2010
structural measures in river IRBM (the blueprint will be based blueprint. The framework to be Management Plan
management on two pilot projects, i.e. Sungai used for river basin
Selangor and Sungai Kedah) management and enhancement.
2.2.2 Carry out Master Plan 10 main river basin plan River basin studies Q2 2010
IRBM studies for river basin
based on priority area
Comprehensive program for
an implementation of IRBM
2.2.3 Prepare and implement More effective water resources Implementation of Sg. Kedah Basin Q3 2010
specific IRBM Plan management Plan
2.2.4 Promote IRBM and IWRM Well managed river basin. Sg. Kedah Q2 2008
Concept Set up of 4 RBO‟s
Page | 7
Goal: To develop and implement IRBM Plan for every river basin for a holistic and sustainable development
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
Completed for Phase II, 4 1. Sg. Kuantan Q4 2009
rivers 2. Sg. Muar
3. Sg. Sarawak
4. Sg. Moyog/ Putatan
Page | 8
Goal: To develop and implement IRBM Plan for every river basin for a holistic and sustainable development
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
Completed for Phase III, 10 1. Sg. Perak Q2 2009
rivers 2. Sg. Selangor
3. Sg. Langat
4. Sg. Kedah
5. Sg. Linggi
6. Sg. Muda
7. Sg. Bernam
8. Sg. Perlis
9. Sg. Melaka
10. Sg. Terengganu
2.2.7 Review and develop Standardise guidelines and Prepare Guidelines Q4 2009
guidelines, procedures for river procedures to be used by all River Front Development
management and development of implementing agencies
river activities
2.2.8 Carry out effective Improved best management BMP to develop effluent treatment Q4 2009
monitoring and enforcement on practice on river basin. methods for markets, restaurants and
river usage sewage treatment plants
Page | 9
Goal: To develop and implement IRBM Plan for every river basin for a holistic and sustainable development
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
2.2.9 Establish database for river Effective river pollution Establish database for 4 rivers Q2 2010
total loading capacity monitoring and control Cyber City, Pulau Pinang
2.3. To promote interagency 2.3.1 Implement specific river Better coordination between Rehabilitation of: Q4 2008
collaboration in effective river cleaning program agencies for river Sg. Melaka
protection and enhancement enhancement.
program Sg. Pinang
Effective and sustainable
awareness efforts
2.3.2 Expand collaboration with Improved river water quality One State One River (DOE member of Q2 2010
the Department of Environment in Comprehensive State Steering Committee)
the control of river water pollution assessment of river water
quality
Increase compliance to
environment guidelines and
procedures
2.4. To promote private sector 2.4.1 Promote „River Front‟ Value added river environment Formalized the guideline on river front Q4 2009
involvement in river development concept in property development
development and management development
Page | 10
Goal: To develop and implement IRBM Plan for every river basin for a holistic and sustainable development
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
2.4.2 Promote private sector‟s Better coordination between Q4 2010 &
involvement in monitoring and public and private sector continuous
safe guarding of rivers Improved mutual
understanding between
government and private
sector
2.5 To build up staff 2.5.1 Review, upgrade, formulate Competent and knowledgeable Training of 10 people in Q4 2009
performance measurement and and implement training program human resources hydrodynamic modeling
career path for departmental staffs Training of 10 state staff in GIS
software.
2.5.2 Procure adequate facilities Improve staff performance and Upgrade technical software's (Infoworks) Q3 2009
such as computers, software skill
packages and other supporting
facilities
Page | 11
Goal: To develop and implement IRBM Plan for every river basin for a holistic and sustainable development
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
2.6 Increase river advocacy 2.6.1 Implement stakeholder Stakeholder engagement rolled Stakeholder engagement workshop Q3 2009
through effective stakeholder engagement plan and strategies out
engagement
2.6.2 Educate children, citizens Increased public awareness and Awareness Program carried out Q4 2010
and community leaders on the participation together with Members of
value of, and need, for river Parliament and state assemblyman
conservation Program River-Ranger
Page | 12
FOCUS AREA #3: SUSTAINABLE STORMWATER MANAGEMENT
Goal: To manage and regulate the implementation of SWM programs so as to minimise adverse impact on receiving water bodies
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
3.1 Inculcate culture for world 3.1.1 BMPs initiative with
class facilities and practices facilities provided by MSMA for
new development areas
Implement pilot projects SELANGOR Q4 2009
Showcase for developers to
implement MSMA 4 projects
NEGERI SEMBILAN
10 projects
TERENGGANU
3 projects
PULAU PINANG
1 project
MELAKA
5 projects
KELANTAN
19 projects
Impose MSMA Land reserve and gazette for JPBD and PBT agreed to include Q4 2009
requirements during MSMA facilities are specified MSMA requirement in Structural and
Structural and Local Plan at planning stage Local Plan Studies
Studies
Page | 13
Goal: To manage and regulate the implementation of SWM programs so as to minimise adverse impact on receiving water bodies
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
3.1.2 Improvise BMPs facilities
for existing developed areas
Introduce control at source Reduce flash flood and water KEDAH Q2 2010
facilities quality deterioration 2 projects
Implement pilot projects Environmentally friendly WILAYAH PERSEKUTUAN, KL
facilities with value added
1 project
properties to the community
SELANGOR
1 project
NEGERI SEMBILAN
1 project
PERAK
1 project
PAHANG
14 projects
SARAWAK
1 project
KELANTAN
2 projects
Page | 14
Goal: To manage and regulate the implementation of SWM programs so as to minimise adverse impact on receiving water bodies
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
3.1.3 Point & non-point source
reduction program
Install gross pollutant traps Reduction of rubbish and PULAU PINANG Q4 2009
for all detention ponds and sediment from developed 2 project Biomedia
drainage outfall areas into receiving waters
Install 2 nos CDS
Install 94 nos Log boom
KEDAH
Install 2 nos GPT & 6 nos FOG
TERENGGANU
Install 1 nos FRT & 2 nos FRP
Install 1 nos GPT.
PERLIS
Install 3 nos of MFRT
KELANTAN
Install 3 nos GPT
Install 15 nos simpak
JOHOR
Install GPT and BMP
NEGERI SEMBILAN
Install 7 nos GPT
PAHANG
Install 2 nos GPT
Page | 15
Goal: To manage and regulate the implementation of SWM programs so as to minimise adverse impact on receiving water bodies
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
PERAK
Install 2 nos GPT
Install 3 nos EM
Install 23 nos AFRT
Utilise bio-engineering for Reduction in organic pollution Targeting pilot project in Penang Q4 2009
water purification measures (From Class III to Class IIB)
Page | 16
Goal: To manage and regulate the implementation of SWM programs so as to minimise adverse impact on receiving water bodies
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
SELANGOR
1 project
PERLIS
1 project
PAHANG
4 projects
Improve submission Improve delivery system for Prepare MSMA checklist Q2 2009
checklist for Land JPS during development
Subdivision, Drainage application process
Layout Plan and Erosion &
Sediment Control Plan
Prepare checklist for site Compliance to MSMA Prepare checklist for Inspection and Q4 2009
monitoring purpose Maintenance Erosion and Sdiment
Control
Page | 17
Goal: To manage and regulate the implementation of SWM programs so as to minimise adverse impact on receiving water bodies
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
3.1.6 Strengthen legal,
regulations and enforcement
while improving coordination
with other Agencies
MSMA requirements made Prepare proposal OPS Lumpur in Q1 2008
Insert MSMA requirements national level.
mandatory
in Local Authority
Development Plan
Requirement Compliance to MSMA e.g. Q4 2009
OSC
3.1.7 Prepare SWM Master Detailed plans for 20 major towns PERLIS Q4 2010
Plan for towns including ready to be utilised Kangar, Arau and Padang Besar
implementation
PERAK
Parit Buntar dan Bagan Serai
SELANGOR
Klang
Seri Kembangan
Bandar Sungai Buluh
TERENGGANU
Dungun
Chukai, Kemaman
PAHANG
Kuantan
Kuala Rompin
Page | 18
Goal: To manage and regulate the implementation of SWM programs so as to minimise adverse impact on receiving water bodies
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
SABAH
Tuaran, Mengatal danTalipok
Tawau
SARAWAK
Kuching dan Kota Samarahan
PULAU PINANG
Seberang Jaya
Butterworth
Tasek Gelugor
KELANTAN
Tanah Merah
Pasir Mas
Ketereh
JOHOR
Johor Bahru*.
Muar*.
Batu Pahat*.
Pontian*.
Kluang*.
Segamat*.
Kota Tinggi*.
Mersing*.
Senai*.
Simpang Remggam*.
Tangkak*.
Labis*.
Pekan Nenas*.
Page | 19
Goal: To manage and regulate the implementation of SWM programs so as to minimise adverse impact on receiving water bodies
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
Parit Raja*.
Parit Sulong*.
Yong Peng*.
NEGERI SEMBILAN
Majlis Perbandaran Seremban
3.2 Create effective stakeholders 3.2.1 Public education and Bottom up planning and Joint implementation between DID Q2 2009
engagement outreach programs implementation Selangor and BSB – to be implemented
Develop a framework for Establish sense of belongings in Taman Botani, Kelang
stakeholder participation for MSMA facilities in the
(school, community community
association and etc)(refer
Stakeholders Engagement
Plan)
3.2.2 Voluntary enforcement Stakeholder‟s engagement for Will be establishing in Taman Botani, Q4 2010
squad one project Kelang.
Establish community watch Reduce O&M expenditure
program in the form of BMP
for SWM involving
stakeholders
Page | 20
Goal: To manage and regulate the implementation of SWM programs so as to minimise adverse impact on receiving water bodies
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
3.2.3 Recognition and incentive Attract more stakeholders MSMA Award Q4 2010
MSMA recognition for involvement in MSMA projects
stakeholders
To propose tax reduction to Public/private smart Prepare daft proposal Q4 2010
private sectors that fully partnership
support MSMA
3.3 Source for additional Funding 3.3.1 Establish policy on Improve operation and Prepare draft proposal for maintenance Q4 2010
from government and developers Federal grant and funds maintenance grant
3.3.2 Impose SW contributions Additional fund in providing MSMA Submit proposal to state government for Q4 2010
for new developed areas facilities approval
3.4 Consolidate and focus 3.4.1 Education and No staff shortage Seminar, dialogue, hands on course, Q4 2008
capacity building efforts professional development Abundance in local expertise expert talk, workshop and forum
Give training and with latest knowledge &
awareness to all technology ready to be utilised
stakeholders around the globe
Page | 21
Goal: To manage and regulate the implementation of SWM programs so as to minimise adverse impact on receiving water bodies
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
3.4.3 Research and local SW Bio-ecological drainage system Q2 2010
knowledge development Resam erosion control
Give grants to local USLE Parameters
researchers and institution
to conduct SWM R&D
MSMA second edition Q3 2010
Update design tables and
procedure
3.4.4 Establish Virtual Resource Land development system has been Q4 2010
Center and Accreditation Center developed for JPS Negeri Sembilan. To
(Center of Excellence) expand the usage of the system for all
JPS States
Page | 22
FOCUS AREA # 4 : PROTECTION OF LIFES AND PROPERTY FROM FLOOD
AND COASTAL HAZARDS
Goal: To ensure the protection of life and property from the risk of flood and coastal hazards trough an integrated approach
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
4.1 Inject innovation in design 4.1.1 Maximise exploitation of Production time of design and iCED in-house software for revetment Q3 2008
processes (to improve ICT tools In design process tender documents reduced by design in place.
efficiency of project delivery) Usage of software (e.g. 50%
MIKE 11, MIKE 21 etc.) Mike 21 used in 2D hydrodynamics
Develop skill to use modeling used in research.
application software
Surface And Nearshore Database
System (SANDS) used for data
storage/ management and data
analysis
4.1.2 Implement pilot projects to Value added coastal protection Beach drainage technique Q3 2009
test innovative technologies scheme o Pressure Equalisation Module
Beach nourishment / (PEM)
drainage projects
Soft / green engineering o Beach Management System
techniques (BMS)
Page | 23
Goal: To ensure the protection of life and property from the risk of flood and coastal hazards trough an integrated approach
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
Modular sea-wall: Labuan Blocks
implemented at over 15 sites
4.1.3 Form smart partnerships Sign MOU with local and JPS-NAHRIM-FRIM joint study on Q1 2010
with IHL and other technical international bodies.(1 per mangrove replanting behind geotextile
agencies year) breakwaters being investigated at Sg
Hj Dorani
4.1.4 Implementation of ISO Achieve certification of work Certification one of the process – base Q3 2009
9001:2008 process in : KPI
design of coastal protection ISO Process for “Approval of studies /
report
planning and design of flood
Page | 24
Goal: To ensure the protection of life and property from the risk of flood and coastal hazards trough an integrated approach
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
mitigation projects
evaluation of project proposal
improvement of delivery
system
4.1.5 Documentation of local Completion of DID Manual. DID Manuals on Coastal Management and Q1 2009
practices and guidelines (to Flood Mitigation
include detailed design
documents)
4.1.6 Review design of Improve infrastructure efficiency Physical modeling used in all Q4 2010
structures using physical model breakwater construction projects
testing for critical projects including Sungai Terengganu, Kuala
Kemaman and Kuala Pahang project
Page | 25
Goal: To ensure the protection of life and property from the risk of flood and coastal hazards trough an integrated approach
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
4.2 Expand usage of eco-friendly 4.2.1 Capture social and Produce more holistic planning Coastal erosion control in Tg. Piai Q4 2008
and non-structural methods environmental considerations in and design with added-value to Labuan block
planning and design local inhabitants
Usage of sandfill mattress
Prevent environmental
damage Relocation of resident
Include Environmental Impact Q4 2009
Preserve natural resources
assessment Study in Flood Mitigation
master Plan project
Include River Conservancy and river
corridor management Plan in flood
Mitigation Master Plan study
4.2.2 Monitor Project Accurate, complete and timely Monitoring is done through the system Q4 2010
performance to measure provided (BTB-L1)
success Monthly monitored – physical and
financial progress
Page | 26
Goal: To ensure the protection of life and property from the risk of flood and coastal hazards trough an integrated approach
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
Land use planning and Flood Risk Map Q4 2010
included in studies
Sg Damansara
RTB Sg. Batu Pahat
RTB Sg. Muar
RTB SG. Johor
RTB Sg. Mersing
Sg. Kluang
WPI
4.2.4 Carry out Flood risks Flood Risk Map Prepare Flood Risk Map for the:- Q4 2010
assessments, coastal hazard risk Flood hazard Map Sg Damansara
assessment and produce flood
hazard maps Coastal Vulnerability RTB Sg. Batu Pahat
Maps RTB Sg. Muar
RTB SG. Johor
RTB Sg. Mersing
Sg. Kluang
WPI
Page | 27
Goal: To ensure the protection of life and property from the risk of flood and coastal hazards trough an integrated approach
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
4.2.5 Flood damage Information for future planning Develop Damage Assessment model Q3 2008
assessments and flood Vulnerability on event basis
Carry out damage assessment after
flood
4.2.6 Development of database Flood Management Master Provide a Database for flood scenario and Q1 2008
on floods, flood programmes Plan program
Preparedness for design of Sistem Pelan Tindakan Banjir (FAPS)
flood projects Sistem Peristiwa Banjir (FES)
4.3 Promulgate stakeholder 4.3.1 Engage stakeholders in Increased stakeholder Agencies and NGO‟s consulted for projects Q1 2010
engagement to strengthen project pre-project and post-project satisfaction and reduced number in environmentally sensitive areas
design and improve disaster consultations of complaints
prevention and preparedness
Projek Pemulihan Pantai Teluk Tekek,
Tioman
Q4 2009
Flood mitigation projects
o Sg. Muda Flood Mitigation
Project
o Sg. Johor Flood Mitigation Project
Page | 28
Goal: To ensure the protection of life and property from the risk of flood and coastal hazards trough an integrated approach
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
4.3.2 Add-value (socio- Increased economic activity As part of ToR, ISMP recommends beach Q4 2010
economic) to engineering restoration and beautification and other
projects tourism promoting activities. Total solution
approach to tourist beaches
Projek Pemulihan Pantai
4.3.3 Publish guidelines, books Published guidelines, books Guidelines for erosion control JPS1/97 Q2 2009
and pamphlets for all levels of and pamphlets in place.
society on flood preparedness, Improved disaster
flood machinery preparedness for target Tsunami modelling and impact study
group
Page | 29
Goal: To ensure the protection of life and property from the risk of flood and coastal hazards trough an integrated approach
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
4.4 Accelerate formulation and 4.4.1 Standardise critical Achieve one ISMP in each 4 ISMP studies to complete under RMK9 Q4 2010
implementation of Integrated components in ToR for state or covering 50% of ISMP Pahang.
Shoreline Management Plans and Integrated Shoreline shoreline
integrated flood management plan Management Plan ISMP P.Pinang
Reduction in number of
(to improve spatial planning ISMP Negeri Sembilan
critical erosion areas by 20%
initiatives) ISMP Melaka.
ISMP Miri
4.4.2 Prepare blueprint for Holistic plan Blueprint for Integrated Flood Management Q3 2009
Integrated Flood Management
Plan
4.4.3 Establish and enhance JPS erosion control guidelines Partnership with JPBD Q2 2008
smart partnerships with flood incorporated in JPBD
related agencies eg. JPBD and development guidelines
PBT
4.4.4 Organise briefings on ISMP Awareness and commitment ISMP for all states Q4 2010
and IFM to sensitize state from state government
government
IFM Q3 2009
4.4.5 Involve local authorities in More informed local Involving PBT at planning stage of project Q4 2010
solving coastal erosion issues authorities; improved
perceptions
Enforcement of ISMP
Page | 30
Goal: To ensure the protection of life and property from the risk of flood and coastal hazards trough an integrated approach
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
4.5 Create domain experts and 4.5.1 Organise regular and Increased intellectual discourse National conference Q4 2009
think-tanks (to generate innovation focused seminars and captured through proceedings,
and technology) conferences papers and publication.
4.5.2 Gives awards for significant Greater productivity and Participant in innovation competition Q4 2010
research and innovation continuous improvement Recognition for innovation
4.6 Modernise flood forecasting 4.6.1 Extend flood forecasting Improved early flood Integrated Flood Forecasting and Q1 2010
and warning capabilities and warning systems to cover forecasting and warning warning system for Klang Valley
major river basin system o Infrastructures of telemetry
system network
Reduced casualties and o System (Model)
damages
Page | 31
Goal: To ensure the protection of life and property from the risk of flood and coastal hazards trough an integrated approach
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
4.6.2 Establish smart Faster reporting of erosion JPS-MACRES Joint study on shoreline Q4 2010
partnerships eg. Joint projects control change at Pantai Cahaya Bulan
with MACRES to harness their identified (to review)
remote sensing capabilities, Joint project of Flood Evacuation Map
Jabatan Meteorologi Malaysia for
rainfall forecasting
4.6.3 Conduct long-term studies Knowledge of long term Field research station identified in Q2 2010
on climate change effects and vulnerability of coastal region Pantai Cenang, Langkawi
natural hazards
National Coastal Vulnerability Index
Study-Sea level Rise completed in
February 2008 for Tg. Piai and
Langkawi
Page | 32
FOCUS AREA # 5 : CENTRE OF EXCELLENCE FOR HYDROLOGY, RIVER MANAGEMENT,
COASTAL MANAGEMENT AND URBAN DRAINAGE
Goal: To develop world recognised expertise in hydrology and stormwater, river and coastal zone management
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
5.1 Enhance human resource 5.1.1 Identify fields and pools of Database of expertise Training Needs Program prepared Q4 2010
development through training expertise required & training needs required
and education towards achieving List of expertise in
world recognized expert respective fields
Preparation of yearly
programme
5.1.2 Identify and develop potential Database of potential JPS Search Committee Q4 2010
candidates for further studies experts. Identify sponsorship programs
Pool of expert with post ( JPA, Monbusho, ADB, IDB, etc )
graduate degrees with target
of 20% Msc and 3% PhD
5.1.3 Obtain local and or Professionally accredited Technical attachment programme Q1 2008
international professional experts towards obtaining PE
accreditation
10% Professional engineers In-house training report for new Q4 2010
(PE). engineers towards obtaining PE
Page | 33
Goal: To develop world recognised expertise in hydrology and stormwater, river and coastal zone management
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
5.1.4 Request for expert / specialist Recognised expert schemes of Department to recommend flexi post Q2 2009
scheme from Government service ( 41/ 44/ 48/ 52/ 54/ JUSA ) and personal to
holder for all identified specialist posts.
5.2 Enhance opportunity in R&D 5.2.1 Assess our past research and Realignment of R&D programme Compilation and assessment of information Q1 2009
in applied research for solving dev programmes including from respective divisions.
field problems innovations o MIHP Research Committee
Programmes. (IHP UNESCO
Phase VII (2008 – 2013)
o eScience Fund
o Departmental allocation for R&D
5.2.2 Assess our current capacity Identification of research To undertake SWOT Analysis. Q2 2009
and strength in research from focus areas
stakeholders‟ perspective Detailed and comprehensive
(e.g. NRE, MOSTI, KTAK, EPU) assessment report on R&D
needs.
5.2.3 Prioritise field problems and List of prioritize research for River Q1 2008
conduct research more effective solutions o Reviewing river basin boundaries.
o Initiate several R&D projects:
o Formulate procedures for conservation
of endangered species with respect to
water river quality i.e. Kelah Projects
o Formulate procedures for monitoring
Page | 34
Goal: To develop world recognised expertise in hydrology and stormwater, river and coastal zone management
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
river water quality using Biological
Indicator and its correlation with
Biochemical monitoring.
o Carry pilot projects using bio-
remediation to improve river water
quality on polluted water bodies.
Hydrology
o Study on Effects of Logging in Sg Weng
Catchment
o Urban Hydrology Study for Sg. Kayu
Ara
o Catchment boundary demarcations
using SRTM (DEM) and GIS for Johor
5.3 Acquire Research & 5.3.1 Identify facilities required Equipped with facilities. Coastal
Development facilities Equipment Able to maximize resources Open laboratory for Coastal R&D. Q2 2009
Laboratory hence well organized and
coordinated R&D. Q1 2009
Infrastructures Computer simulation and modeling
Software & Hardware laboratory.
Hydrology
Weather Station for all reservoirs. Q2 2009
Page | 35
Goal: To develop world recognised expertise in hydrology and stormwater, river and coastal zone management
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
SMART Q2 2009
Surveillance System,
Telecommunication for SMART
River Q4 2010
Computer simulation and modeling
laboratory.
HTC Q4 2010
Environmental Weather Station.
Learning Laboratory for Integrated
Urban Water Management System.
Page | 36
Goal: To develop world recognised expertise in hydrology and stormwater, river and coastal zone management
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
5.4 Establish collaborative 5.4.1 MoU or strategic alliance with Collaborative programmes MoU between HTC KL and UNESCO Q2 2009
partners at local and international local and foreign research with local and foreign Paris.
level institution, institution or higher institutions and expanded
learning network established.
MoU between JPS and ANM
5.4.2 Organise and participate in 20 targeted conf/ws/etc 5th World Water Forum, Turkey. Q1 2009
workshops, conference, colloquium, organise/ participate where
seminars, etc engineers with at least 5
11th International Conference of Urban Q3 2008
years service should attend
Drainage.
in 1 int. conf. for knowledge
and technology exchange
and transfer ICCE08, Hamburg, Germany Q3 2008
Page | 37
Goal: To develop world recognised expertise in hydrology and stormwater, river and coastal zone management
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
Every engineer should attend IOC Sub-Commission for the Western Q2 2008
at least 1 local conf once a Pacific (WESTPAC-VII)
year
Indian Ocean Tsunami early warning Q2 2008
system
5.4.3 Publish and disseminate Centre of reference established To publish more papers periodically. Q4 2010
research findings in established and images enhanced with 20 of
journals, proceedings, technical published research findings
documents and manuals etc.
5.4.4 Invite foreign experts for Transfer knowledge and Please refer to Appendix III. Q4 2007
conducting joint research and technology with at least 6 foreign
training experts invited for joint research
and training annually
Page | 38
Goal: To develop world recognised expertise in hydrology and stormwater, river and coastal zone management
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
5.4.5 Participate in foreign expert Better networking for knowledge Active member of internationally recognized Q4 2010
groups and international scientific transfer. institutions in related fields.
organisation e.g. WMO/UNESCO,
Joint Committee on Urban Drainage
of IWA/IAHR/IAHS
5.5 Generate source of income 5.5.1 Commercialization and New technology and enhance DID Penang Q2 2009
patenting research product image of department as centre of GeoProtect
reference.
Coastal
Patent applied for Labuan Blocks for
coastal defence
Page | 39
FOCUS AREA #6: EXCELLENT SUPPORT SERVICES
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.1 Leveraging new technologies in 6.1.1 Extending high All JPS offices nationwide will be Establishing a single high bandwidth
ICT to support business processes bandwidth network infrastructure connected via NRE*Net network nationwide to support ongoing
and decision-making progressively to all offices. regionally. and future ICT initiatives.
Page | 40
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.1.2 Narrowing the digital Every personnel will be granted ICT skills will be developed in JPS to Q4 2010
divide among all levels of access to ICT facilities; encourage an enabling culture.
personnel throughout all offices Consolidating hardware/ software
licenses (acquiring departmental wide
software licenses).
o AutoCAD : 40 licenses for
sharing among users.
o ArcGIS – 10 licenses for sharing
among GIS users.
o eScan antivirus to all PC‟s
o Centralized backup system
o Dewan Eja for P&P personnel
o Email system- migration to
Zimbra collaborative suite - 10%
o 2009 to consolidate networks
licenses for InfoWorks,
FloodWorks and InfoNet
Page | 41
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.1.3 Review ICT Strategic A comprehensive master plan to Develop a comprehensive master plan to Q4 2010
Plan (ISP) further improve coordination of adhere to.
Integrate and align ICT into ICT programmed that are viable
core business processes and workable.
6.1.4 Enhance ICT governance Strengthen the current ICT Adopt policies from the central agencies Q4 2010
Review and formulate governance framework to further and enforce.
guidelines and ICT policy improve coordination of ICT
programmed
Polisi Agihan PC
Dasar Keselamatan ICT
SOP (Standard Operating Procedure)
– Pengurusan Pusat Data
SOP – Pengurusan
Rangkaian/Internet
Polisi E-mel JPS
SOP Penggunaan Perisian
6.1.5 Generic web based Standardised applications are Identify successful applications that can Q3 2010
applications to be rolled-out used throughout JPS be shared / rolled out to all JPS offices to
integrating spatial and non- Departments; improved service delivery through
spatial data. community applications initiatives..
MyAsset
ePelan Applications that were and in the
process of rollout are:
SP3B
o MyAsset (Sistem Pengurusan
SMATRAK Aset)
Page | 42
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
eAduan o ePlan
eSaliran o eAduan
eFiling
SMATKOS
SMAP
6.1.6 Foster collaboration and A centralised knowledge Sharing of knowledge and experiences by Q4 2010
knowledge / data sharing among bank/repository . capturing information across department
all JPS offices and inter and across government
agencies/departments to support Implement main portals : Government-
collaborative decision-making. to employee portal Citizen centric and
business portal
o JPS intranet website (InfoPortal)
and JPS public website.
Page | 43
FOCUS AREA #6: EXCELLENT SUPPORT SERVICES
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.2 Improvise towards 6.2.1 Continuous monitoring, Efficient and effective budgeting Implementations of Finance and Q4 2010
comprehensive program training and advice on budgeting and expenditure programs Account management Committee
budgeting and expenditure procedures in line with the (JPKA) and Government
tracking Treasury‟s Instructions (AP) Removable Assets Committee
(JKPAK)
Page | 44
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.3 Providing and ensuring 6.3.1 Continuous monitoring on Zero complaint from JPS Maintenance project of JPS : Q3 2007
logistic matters for JPS personal building maintenance, water and personnel
are well taken care off electricity supplies
Air-conditioner System ;
- Suggestion of installation &
replacement of existing „window unit‟
to „split unit‟ air-cond
Electrical System ;
- Suggestion of installing decorative
lights , P.A system & Spot light at
IPJPS
Page | 45
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
Telephone & Fax system ;
- Installation of additional telephone
set „Boss Secretary‟ for Grade 54 and
above
6.3.2 Implementing Card Access Entry of visitors can be (a) Develop a systematic monitoring and Q3 2007
System for security purposes monitored efficiently inspection to ensure & enhance the
security level in the building to be
maintained
Page | 46
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.4 Ensuring the implementation 6.4.1 Identifying and short-listing of Proactive and efficient Proactive & efficient personnel are Q4 2007
of the JPS Succession Plan are all personnel with great potentials personnel of JPS given rewards for their excellent
well planned and co-ordinated performance
Page | 47
FOCUS AREA #6: EXCELLENT SUPPORT SERVICES
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.5 Timeliness, cost effectiveness 6.5.1 Adopt best project Effective and efficient To establish procedures and mechanism Q4 2010
and quality in project delivery management practice and tools implementation of development for effective monitoring of project
for monitoring project projects implementation
performance
o Create project information
monitoring system.
o Implementation of Quality
Assurance and Quality Control (QA
& QC) procedures for technical
auditing of every major projects.
o To acquire and enhance capability
in application of Critical Path
Method (CPM) in project
management.
Page | 48
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
Page | 49
FOCUS AREA #6: EXCELLENT SUPPORT SERVICES
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.6.2 Enhance and upgrade Modernized, best and good Upgrade Mechanical infrastructure to Q4 2010
all the infrastructure to meet infrastructure management and category 5
design objectives facilities with remote monitoring o Upgrade Gate infrastructure to
Retrofit, upgrading and and control system category 5 (target 20% in RMK 9)
automate of all infrastructure
Replacement from manual to o Upgrade Pump infrastructure to
electrical system category 5 (target 20% in RMK 9)
Engine driven facilities to
Page | 50
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
electrical powered facilities 25 new SUV transportation
Incorporate SCADA system for 5 new lorry/ heavy transportation
remote control and monitoring
15 new boat
Operation, Repair and Maintainance of
Dredger and it‟s utilities
6.6.3 Preventive maintenance To detect problems early and Technical auditing Q4 2010
Perform Scheduled make sure no breakdown for the Periodic testing
maintenance system and infrastructure during
crucial moments Coordinate meeting with ME states –
Periodic Maintenance
6.6.4 Upgrade operational and Pump test centre Upgrading of pump test bay Q4 2010
performance research centre
Continuous research and Trained Technical committee
Creation of new ideas and innovation discoveries in
products Implementation to upgrading the performance of
all states FRP Trash Screen & Grating
infrastructures and in
providing services
FRP Flap Gate & Screw Down Gate
R&D Centre for
Hydromechanical HDPE Flap Gate and Screw Down
infrastructure Gate
Page | 51
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
Replacement for hardwood timber and
music nod materials
6.6.5 To promote and Promote and implement MS Registration of Electrical installation Q4 2010
develop energy Management 1525; Electrical energy with Suruhanjaya Tenaga
Management Regulation
Promote and implement Established guideline for Electrical Q4 2008
renewable energy program Operation and Maintenance
Page | 52
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
Established guideline for energy Q4 2009
conservation
6.6.6 To provide safe OHSAS certification Implement OHSAS 18000 at JPS state Q4 2010
operation and healthy working office with ME personnel (18)
condition and environment
Compliance to regulation
AKKP 412 Monitoring of Minutes of SHC meeting
Page | 53
FOCUS AREA #6: EXCELLENT SUPPORT SERVICES
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.7 Enhancing quality programs 6.7.1 Focus on ISO Achieving certification from Promotion on the application of Q4 2010
recognized bodies management systems; MS ISO
9001:2000, MS ISO 14001:2004 and
OHSAS 18001:1999 from 3rd party
certification bodies.
6.8 Win Prime Minister‟s Quality 6.8.1 Coordinate Dept‟s Complete documentation Information acquisition dan Q3 2009
Award preparation in entering the preparation of documentation
AKPM competition
Establishment of working committee. Q2 2009
Page | 54
FOCUS AREA #6: EXCELLENT SUPPORT SERVICES
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.9 To focus on promoting and 6.9.1. Inculcate and promote Improvement in the operational, Develop a systematic monitoring, and Q3 2010
enhancing value added value added engineering serviceability and durability of inspection and rehabilitation of all major
engineering on all existing and knowledge in the design, structures JPS structures to enhance durability and
new structures built, operated and operations and maintenance of service life of structures through:-
maintained by JPS JPS structures amongst the
stakeholders
Re-vitalize & upgrade existing asset
management system of JPS
Structures.
Page | 55
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
Bringing aesthetical value Identify and develop jointly with Q3 2010
and added attraction to all stakeholders on projects related to
sites. beautification and attraction of JPS
site and infrastructures
6.9.2 Collaborate and monitor O & M performance auditing, Implement standard structural Q4 2009
with the stakeholders in enhancing remedial and restoration monitoring and assessment
the practice of value added planning and design Guideline/ checklist to all
engineering in the O & M of JPS states/project offices
structures
Categorization of Structure
conditions for rehabilitation and
repair priority
Page | 56
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.10 Building capacity in the field 6.10.1 To acquire skill and Competent JPS Engineers Relevant Softwares to be used in Q4 2009
of structural, geotechnical and knowledge in the use of related o (Minimum of 2 Technical works (10 per year)
hydraulic engineering relevant to technology / software) competent engineers at
JPS environment. all times for each Schedule Software Training (In-house
commonly used + outsource training).
software)
o StaadPro = 6 engineers Dec
2009
o Plaxis = 4 engineers/TA
(2009)
o Hec Ras = 4 engineers (2009 -
2010)
o Slope W = 5 engineers/TA
( 2009 – 2010)
o SeepW = 3 engineers/ TA
( 2009 - 2010 )
Page | 57
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.10.2 Acquiring sound Expert advice on In-house review and interpretation of Q3 2009
understanding and knowledge in (engineering) problems SI reports for planning and design
soil investigation & its works
interpretation o 5 projects per year
Reliable and good SI data for
design & decision making in
problems solving Technical personnel to be attached
to Contractor during SI works ( 2 per
year)
6.10.3 Upgrade capacity & level of All Unit to carry-out hand-on design Q3 2009
competency through in-house projects (min. 2 project / Engineer
design works (J44 & below) / year
Page | 58
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
o Review of Arahan Teknik for
documentation of design
Procedures
6.10.4 Upgrade capacity & level Dissolve all technical problems in Competent Technical advices/support Q4 2009
of competency through Technical quick, professional and in line in Structural & Geotechnical (20 no.
advice services in engineering with best practices/Standard per year)
works Emergency works
Technical design Hydraulic (Flood Mitigation, river &
/construction problems (both storm management studies/design)
Dept and Consultant design) and Dam (Consultant‟s Design) – 50
No. per year
Page | 59
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.11 To develop, promote, and 6.11.1 Carry out automation of Establishment of dam Establish Dam Automation System for Q2 2009
enhance dam safety surveillance instrumentation data delivery automation electronic data every dam monitored by JPS Dam unit.
system system and performance delivery system from dam
measuring device operator to the Dam Unit in
BSGE
6.11.2 Carry out dam isotopic Establishment of permanent Yearly collection of isotopic data in the Q4 2009
characterization baseline data. field
Able to determine source of
uncontrolled seepage
Support analysis with regards
to seepage problems
6.11.3 Carry out catchments Establishment of system for Yearly acquisition of satellite images for Q4 2009
monitoring system using remote monitoring intrusion, all JPS dams and continuous monitoring
sensing encroachment, land opening
activities in the catchments area
6.11.4 Carry out monitoring of Support analysis with regards to Facilitate ANM (Agensi Nuklear Q4 2010
sediment loading trend of incoming sediment into Malaysia) in establishment of monitoring
the dam storage. procedure
Page | 60
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.12 To promote the services in 6.12.1 Carry out design and Better image for JPS Enhancing capability to handle Building Q4 2010
the design and construction of construction services to other Completed construction of Related Projects for other Department
building for other departments department building that complies with (10 projects per year )
best standard & specification.
6.13 To put up engineering 6.13.1 To prepare, review and Standard technical guides Development of Design manuals as
guidelines relevant to JPS works update technical guides/ /specification to be adopted follows: - (4 No. by 2010)
specifications for use by the Department
Specification of works and guide to
Q4 2007
Provide up-to-date technical repair and rehabilitate age / problems
guidelines on design of structures
hydraulic structures
Guideline on the design of culverts Q4 2007
Provide up-to-date
information on the use of Standardization and guideline for the Q4 2009
construction material design of Arch Bridges
technology
Guide to estimation of scour depth in Q2 2009
Quality technical outputs in river bend
terms of consistency, safety,
effectiveness and cost
Preparation and review of DID Q2 2009
Manual
Page | 61
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.14 Prospect for new and 6.14.1 To continuously source for Improved effectiveness and Identify, develop & enhance products Q3 2010
improved construction technology new, innovative or improved efficiency in the application through. literature study, pilot project,
and materials construction technology and of new or improved and laboratory test etc
materials construction o Min 5 new/improved materials
technology/materials
Page | 62
FOCUS AREA #6: EXCELLENT SUPPORT SERVICES
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.15 Staff training and career 6.15.1 Conduct and review Well planned and relevant Annual training program (local & Q4 2010
development via planned programs and courses programs / courses oversea)
Develop competencies of Impact assessment on selected
individuals via training and courses
non-training interventions
Building in-house capabilities
and capacities through 6.15.2 Introduce supplementary Ad-hoc and urgently needed 2009 Q4 2010
extensive and focussed programs / courses to meet courses are conducted Special Management Course ( Grade
training programs specific needs from time to time 48 and above)
Media Course for JUSA , Division
Directors and State Directors
Cash Flow Management
Public Relation Techniques for PRO
6.15.3 Adopt external best Competent staff Dissemination of knowledge through Q4 2010
practices to assist in competency “Brown Bag” concept
development PPLKK program (Engr < 5 yrs service)
Facilitate in-house design Competency Index
Counterpart attachment in Development of Engineer‟s Database
consultancy firm and Support Group I Database
TNA for Technical Staff (1)
Page | 63
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.15.4 Facilitate staff in matters Competent and motivated staff Conduct PTK Q4 2010
pertaining to confirmation, Conduct Dept. Exam. / Special Exam.
promotion & career development
Conduct Induction Course
6.15.5 Enhance training facilities A conducive learning Upgrading of hostel‟s facilities Q4 2010
& improve conduciveness of the environment and up-to-date Upgrading of sport and recreational
learning environment training facilities fascilities
Upgrading of learning fascilities
Page | 64
FOCUS AREA #6: EXCELLENT SUPPORT SERVICES
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.16 Improve effectiveness of 6.16.1 Contract Enhanced efficiency through Upgrading SMATRAK System (online) to Q3 2009
Procurement and Contract administration processes to automatic generation of produce standard forms and certificates
Management through the use of be web-enabled certificates and documents automatically:
innovative Best Practice
Management
Automatic updating of Letter of Acceptance
contract information
(SMATRAK) through use of
Certificate of Delay And Extension of Time
online forms
Page | 65
Goal: To ensure efficient and effective support services in facilitating JPS operations
Expected
Strategies Action Expected Outcomes Programme/ Project/ Strategic Action
Timeframe
6.16.2 Consultancy Services Accessibility of information SMAP (online) Q4 2007
Information to be available on Consultants
on-line
List of Awarded Consultants
Automatic updating of
Consultant‟s information
List of Consultant Profile
(SMAP) through use of online
forms
Online Profile Updating by Consultant
6.16.3 Establish Integrated Enhanced accessibility to Preparing Procedure and Guidelines using Q2 2009
web-based procedures and current procedures and Web based flowchart
guidelines system guidelines Procurement
o „Garispanduan Tatacara Perolehan‟
Efficiency in contract
administration
Contract Administration
o DID Manual (Flow Charts)
Consistency in project
management & supervision
Page | 66