Defect Report Sat C Antenna

The SAT-C antenna on the MV.SETIA EMAS was broken and fell during bad weather with strong winds. The defect was reported to the DPA and the Sat-C unit was switched off. As the defect could not be repaired onboard, a work order was requested to have a technician complete the required repairs.

Uploaded by

Rose Arianti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
282 views2 pages

Defect Report Sat C Antenna

The SAT-C antenna on the MV.SETIA EMAS was broken and fell during bad weather with strong winds. The defect was reported to the DPA and the Sat-C unit was switched off. As the defect could not be repaired onboard, a work order was requested to have a technician complete the required repairs.

Uploaded by

Rose Arianti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

ALLIANZ MIDDLE EAST SHIP MANAGEMENT LLC

Vessel: MV.SETIA EMAS Send to: CAPT FELIX


Location: AT SEA, TIED UP MB #2 Designated Person/technical Manager
DEFECT REPORT / D 005
GALVASTON KEY

Investigation
# What is wrong? (Defect details) Action taken onboard to repair the defect. Defect repaired? YES/NO.
(Cause of defect)
 If YES, send this report
Observer During Bad Weather and Strong Bad Weather and Rusted Reported to the DPA and Switch Off to office for information.
Wind The SAT-C Antenna Broken and Fall of the top antenna The Sat –C Unit of GMDSS  If NO, complete Work
Down Order request (below) and
send for further action.

If the defect could not be repaired onboard, and onshore support For approval send to:
is needed, then please complete this work order request. WORK ORDER Designated Person/technical Manager

Repairs carried out


# Details of work required. To be completed by Supervisor satisfactorily.
(Signed by originator)
Repairs carried out and Repaired by
spare parts used (Signature)

Required to the Technician

Form No. SMS/29/Rev. 1 Date: 06/07/2014


ALLIANZ MIDDLE EAST SHIP MANAGEMENT LLC

Corrective and Preventive Action :

Name of Originator: NURUL AMIN Approved By :


Title : MASTER Name :……………………………….
Date : 07 July 2015 Date :……………………………….
Signature : …………………………………… Signature:……………………………

Form No. SMS/29/Rev. 1 Date: 06/07/2014