HW 1 Solution
HW 1 Solution
HW 1 Solution
HW #1 Solution
Q1.
Define the following terms and how the rigs are installed before any starting drilling:
a. Wildcat well
b. Development well
c. Semi-submersible rig
d. Submersible rig
e. Jack up rig
m
e r as
f. Ship rig
co
eH w
a) Wildcat well
o.
Wildcat wells are those wells which are drilled outside of or not in the vicinity of known oil or gas
rs e
field. The main purpose of these wells is to discover new petroleum reservoir. Geological group
ou urc
suggests its location.
b) Development well
o
These wells are drilled in the known reservoir area for gathering the information about the reservoir.
aC s
c) Semi-submersible rig
Semisubmersible rigs are those rigs which have submerged hulls, but not resting on the seabed.
ed d
They are designed to float in water. Nowadays, some of the semisubmersible rigs can drill in water
ar stu
d) Submersible rig
sh is
They are mobile offshore drilling unit, supported mainly on large pontoon like structures submerged
below the sea surface. The operating decks are elevated more than 100 ft above the pontoon. At the
Th
drilling location, they are lowered to rest on seabed. After drilling, the water is pumped out of the
buoyancy tanks and the rig is towed to another location. They generally operate in shallow water.
e) Jack up rig
Jack up rig is one of the mobile offshore drilling rig, which consists of long leg structures. The leg
structures are lowered to and into the seabed and then rig out is raised above the surface water. The
maximum depth of operation is 500 ft in these types of rigs.
f) Ship rig
In this type of rig drilling equipment is mounted on the ship. Since this type of rig is itself capable of
moving from one location to another in water, so it doesn’t require any tugboats to tow it. Also,
these rigs are not anchored to the sea bed, so they are not stable like other offshore rigs.
https://www.coursehero.com/file/12837823/HW-1-Solution/
Installation of Rigs before start of drilling activity:
The installation of any rig starts with setting up the substructures, which is unloading and positioning
of the equipment at the rig location. After this rig floor and derrick is set up. During this activity,
draw works, electric cables (if used), stairways, guard rails, handrails, walkaways and ladders are set
up. Then power systems are installed. After this circulating system and auxiliary equipment are
installed.
Q2. State the difference between land rig and offshore rigs.
m
e r as
co
eH w
o.
rs e
ou urc
o
aC s
v i y re
ed d
ar stu
Q3. A drill string made up of 5-in OD, 4.276-in ID drill pipes is stuck, when drilling at 11,000 ft.
sh is
Assume that the stuck point is at a depth of 9,000 ft and it was observed that the drill string
Th
b. If the drill string is made of steel with a failure strength of 11,000 psi and an elastic modulus of
30x106 psi, will the drill string fail? Justify your answer.
Solution:
A = 0.7854*(52-4.2762)
= 5.2746 in2
https://www.coursehero.com/file/12837823/HW-1-Solution/
E = 30x106 psi
ΔL = 2 ft
L = 9000 ft
𝜎 = 𝐸𝜀
∆𝑊 ∆𝐿
=𝐸
𝐴 𝐿
m
∆𝐿
e r as
∆𝑊 = 𝐴𝐸
𝐿
co
eH w
2
∆𝑊 = 5.2746 × 30 × 106 ×
9000
o.
∆𝑊 = 35164 𝑙𝑏𝑠
rs e
ou urc
Stress exerted in the string due to stretch, σ
∆𝐿
𝜎=𝐸
o
𝐿
aC s
2
v i y re
𝜎 = 30 × 106 ×
9000
𝜎 = 6666.667 Psi
ed d
Failure strength,
ar stu
𝜎𝑓 = 11000 𝑝𝑠𝑖
Since, the stress exerted in the string due to stretch, is less than the failure strength, σf. Hence the
sh is
Q.4 The following data were obtained on a diesel engine operating in a prony brake.
https://www.coursehero.com/file/12837823/HW-1-Solution/
b. Compute the overall energy efficiency at each engine speed.
c. Compute the fuel consumption in gallons/day for an average engine speed of 900 RPM
and 12 hour work day.
m
𝑃𝑂 (𝐻𝑃) =
e r as
5252
co
𝑃𝑂 = 295.1 𝐻𝑃
eH w
For the third case, N = 900 RPM and T = 1650 ft-lbf
o.
1650 × 900
𝑃𝑂 (𝐻𝑃) =
rs e 5252
ou urc
𝑃𝑂 (𝐻𝑃) = 282.7 𝐻𝑃
For the fourth case, N = 700 RPM and T = 1700 ft-lbf
o
1700 × 700
aC s
𝑃𝑂 (𝐻𝑃) =
5252
v i y re
𝑃𝑂 (𝐻𝑃) = 226.5 𝐻𝑃
ed d
Pi = Qi = ωf * H
ωf =25.3 gal/hr * 7.2 lbm/gal * 1 hr/60min = 25.3 * 7.2/60 =3.036 lbm/min
sh is
Qi = ωf * H
Th
( H= 19000BTU/lbm)
Efficiency = Po/Pi
E = Po/Qi = (319.9/1361.692) = 0.235
Pi = Qi = ωf * H
ωf =19.7 gal/hr * 7.2 lbm/gal * 1 hr/60min = 19.7 * 7.2/60 =2.364 lbm/min
https://www.coursehero.com/file/12837823/HW-1-Solution/
Qi = ωf * H
( H= 19000BTU/lbm)
Efficiency = Po/Pi
E = Po/Qi = (295.1/1060.29) = 0.278
Pi = Qi = ωf * H
ωf =15.7 gal/hr * 7.2 lbm/gal * 1 hr/60min = 15.7 * 7.2/60 =1.884 lbm/min
Qi = ωf * H
m
e r as
( H= 19000BTU/lbm)
co
eH w
Qi = ((1.884 lbm/min) * (19,000 BTU/lbm)* (779 ft.lbm.HP/BTU))/ (33,000ft.lbf/min)
o.
Qi = 845 HP
rs e
ou urc
Efficiency = Po/Pi
E = Po/Qi = (282.743/845) = 0.334
o
Pi = Qi = ωf * H
ωf =12.1 gal/hr * 7.2 lbm/gal * 1 hr/60min = 12.1 * 7.2/60 =1.452 lbm/min
Qi = ωf * H
ed d
( H= 19000BTU/lbm)
ar stu
Efficiency = Po/Pi
Th
Q5. A rig must hoist a load of 200,000 lbf. The drawworks can provide a maximum input power of
800 hp. Ten lines are strung between the crown block and the travelling block and the dead line is
anchored to a derrick leg on one side of the v-door
1. Calculate the static tension in the fast line when the upward motion is impending.
https://www.coursehero.com/file/12837823/HW-1-Solution/
3. Calculate the maximum hoisting speed.
m
e r as
Maximum Hook Horse Power,
co
eH w
𝑃𝑜𝑢𝑡𝑝𝑢𝑡 = 𝑛𝑃𝑖𝑛𝑝𝑢𝑡
o.
𝑃𝑜𝑢𝑡𝑝𝑢𝑡 = 0.841× 800 rs e
ou urc
𝑃𝑜𝑢𝑡𝑝𝑢𝑡 = 648 hp
𝑃𝑜𝑢𝑡𝑝𝑢𝑡 = W × vb
aC s
𝑃𝑜𝑢𝑡𝑝𝑢𝑡
v i y re
𝑉𝑏 =
𝑊
648 × 33,000
𝑉𝑏 =
200,000
ed d
ar stu
𝑉𝑏 = 106.9 𝑓𝑡/𝑚𝑖𝑛
𝐹𝑑 = 𝑊 + +
𝑛𝑁 𝑁
Th
1 1
𝐹𝑑 = 200,000[1 + + ]
0.841 × 8 8
𝐹𝑑 = 244,691 lbf
https://www.coursehero.com/file/12837823/HW-1-Solution/
𝐹𝑑
𝐸=
𝐹𝑑𝑒
244,691
𝐸=
280,000
E = 0.874
Q6. The driller is pulling on a stuck drill string. The derrick is capable of supporting a maximum
equivalent derrick load of 500,000 lbf, the drilling line has a strength of 51,200 lbf and the strength
of drillpipe in tension is 396,000 lbf. If eight lines are strung between crown block and travelling
block and safety factor of 2.0 are required for the derrick, drillpipe and drilling line, how hard can
the driller pull trying to free the stuck pipe.
m
e r as
co
eH w
o.
rs e
ou urc
o
aC s
v i y re
ed d
ar stu
sh is
Th
https://www.coursehero.com/file/12837823/HW-1-Solution/
University of Louisiana
at Lafayatte
1.6)
Maximum equivalent derrick load, Fde = 500000 lbf
m
er as
Number of lines, n = 8
co
eH w
Efficiency,E = 0.841
o.
Safety factor
rs e = 2
ou urc
Considering Maximum derrick load, Fde = 500000 lbf
o
aC s
= 333333.33 lbf
ed d
Pull = 333333.33/2
= 166666.7 lbf
sh is
Th
Considering this pull, tension in fast line and dead line can be calculated and
can be compared with strength of drilling line and strength of drill pipe
respectively. If the tension in fast and dead line is within allowable limit, it
can be th maximum pull which driller can apply to free the stuck pipe.
= 24772.1 lbf
https://www.coursehero.com/file/12837823/HW-1-Solution/
University of Louisiana
at Lafayatte
Strength of Drilling line, Sf = 51200 lbf
= 25600 lbf
m
er as
Ff' > Ff
co
Since,
eH w
i.e. 25600 > 24772.1
o.
rs e
ou urc
Hence the pull is within safe limit
= 20833.3 lbf
vi y re
= 198000 lbf
sh is
https://www.coursehero.com/file/12837823/HW-1-Solution/