Quality Control Manual
Quality Control Manual
Quaality Man
nual 2012
2
`
Section : I
Page : 1 of 1
QUALITY CONTROL MANUAL
Rev. : 1
Date : 21 / 10 / 2012
Title Page
Edition : III
Revision : 1
Date: 21 / 10 / 2012
Copy No.
Controlled
Uncontrolled
Table of Contents
Table of
Contents
Edition: III
++ Section : I1
Page :2of2
QUALITY CONTROL MANUAL Rev. : 2
Date :20/121 2012
Table of Contents
Edition: 111
Section : III
Page : 1 of 3
QUALITY CONTROL MANUAL Rev. :1
Date : 21 / 10 / 2012
Abbreviations
Abbreviations
Edition: III
Section : III
Page : 2 of 3
QUALITY CONTROL MANUAL Rev. :1
Date : 21 / 10 / 2012
Abbreviations
(III) Abbreviations
AI Authorized Inspector
AIA Authorized Inspection Agency
AIS Authorized Inspector Supervisor
ASME American Society of Mechanical Engineers
ASTM American Society of Testing and Materials
The act of approving, by signing-off on a document after verification that all the
APPROVAL
requirements have been met.
An individual authorised by ASME to carry out a joint review with a
ASME DESIGNEE
representative of AIA.
ASNT The American Society for Non-Destructive Testing.
AWS QC1 Standard for AWS certification of Welding Inspectors.
The Act of verifying and attesting in writing that Documents, process, products,
CERTIFY
or personnel qualifications comply with specified requirements.
CMTR Certified - Material Test Report
The ASME Boiler &Pressure Vessel Code of Construction SEC I, SEC VIII DIV 1 Code
Code & Standard Edition and / or Addenda's and Reference Sections.
ASME B31.1 and NBIC-23 applicable edition and addenda.
Company Project Services Company, PSC (S.A.E.)
COM Construction Manager
Dept. Department
Div. Division
DMD Deputy Managing Director
Ed. Edition
Eng. Engineer
FM Factory Manager
HT Hydro Test
ITP Inspection and Test Plan
L1 Level I
L2 Level II
Material manufactured to an SA, SB or SFA Specification or any
MATERIAL
other Specification permitted by the applicable construction Code.
Manual Quality Control / Quality Manual
MAEWP Maximum Allowable External Working Pressure
MAWP Maximum Allowable Working Pressure
MCM Material Control Manager
MD Managing Director
MDR Manufacturer's Data Report
Mgr. Manager
MPDR Manufacturer's Partial Data Report
MRF Material Requisition Form
MRIF Material Receiving Inspection Form
Edition: III
Section : III
Page : 3 of 3
QUALITY CONTROL MANUAL Rev. :1
Date : 21 / 10 / 2012
Abbreviations
MT Magnetic Particle Test
MTR Material Test Report
N/A Not Applicable
NBIC National Board Inspection Code
NDE Non Destructive Examination
OD Operations Director
Para. Paragraph
PFM Planning Head
PM Production Manager
PO Purchase Order
PQR Procedure Qualification Record
PRH Purchasing Head
PSC Project Services Company PSC ( S.A.E.)
PSM Projects Manager
PT Penetrant Test
PWHT Post Weld Heat Treatment
QA Quality Assurance
QAH Quality Assurance Head
QC Quality Control
QCH Quality Control Head
QCI Quality Control Inspector
QCM Quality Control Manager
Rev. Revision
RT Radiographic Test
Sec. Section
SM Site Manager
SPM Sales and Proposal Manager
TOH Technical Office Head
UT Ultrasonic Test
WCRF Welding Consumable Requisition Form
WCRIF Welding Consumables Receiving Inspection Form
WHM Warehouse Manager
WOPQ Welding Operator Performance Qualification Record
WPQ Welder Performance Qualification Record
WPS Welding Procedure Specification
LISL Line Inspection Summary List
Edition: III
Section : IV
Page : 1 of 2
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Scope
Scope
Edition: III
Section : IV
Page : 2 of 2
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Scope
(IV) Scope
II.1 General
PSC has kept and maintained a Quality Control System which has
been established to provide our custemors with boilers and boiler
parts, boiler external piping, pressure vessels and pressure vessel
parts (such as: towers and heat exchangers) required to be
constructed in accordance with ASME Boiler and Pressure Vessel
Code Section I, ASME B31.1, Section VIII Div.1, AWS, API, EN or
other governing Codes or Standards (hereafter called Code). The
Quality control system has been established to meet the requirements
of ASME Code including design, material, fabrication and
examination by PSC; and inspection by The Authorized Inspector (AI)
for Power Boilers, Power Piping, Pressure Vessels and pressure
vessels parts. The Quality control system has been established to
cover activities in the shop and field sites.
Edition: III
Section : 1
Page : 1 of 3
QUALITY CONTROL MANUAL Rev. : 2
Date : 20 / 12 / 2012
Manual Control
Manual Control
Edition: III
Section : 1
Page : 2 of 3
QUALITY CONTROL MANUAL Rev. : 2
Date : 20 / 12 / 2012
Manual Control
1.1 This Manual shall be prepared by QAH, who collects the Manual
sections prepared by each concerned personal (QCH, TOH & NDE
Level III Examiner), reviewed by QCM, whilst the approval of such
shall be granted by the Managing Director and reviewed and
accepted by the AI of records. The QAH shall issue controlled
copies of this approved Manual with transmittal advice in
accordance with the list of Manual Holders Log (Exhibit No. (01-
01)) maintained by him.
1.2 Each copy of this Manual will bear the same control number on
its title page as shown on the List of Manual Holders Log, and the
same will be done but on the back of each Manual pages. In case
of electronic copies the control number will appear on the title
page and it must be protected against changes and printing.
Edition: III
Section : 1
Page : 3 of 3
QUALITY CONTROL MANUAL Rev. : 2
Date : 20 / 12 / 2012
Manual Control
italic font of the revised text. Only the latest revision will be
indicated.
1.8 Revised Exhibits pages are issued individually with a revised List
of Exhibits Exhibit No. (1-03) by QAH.
1.9 QCM may, at his discretion advance the edition level of the
Manual at which time all revision status of all sections shall revert
to zero. However, exhibits revision numbers shall remain with the
same revision status.
1.13 One master copy of earlier revision of the Manual marked supereeded
shall be retained by QAH for minimum 3 years.
1.14 QAH is responsible to insure that revised copies are retuned and
destroyed.
Edition: III
Section : 2
Page : 1 of 2
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Statement of
Authority and
Responsibility
Edition: III
Section : 3
Page : 1 of 6
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Organization
Organization
Edition: III
Section : 3
Page : 2 of 6
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Organization
(3) Organization
Edition: III
Section : 3
Page : 3 of 6
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Organization
3.1.3 Technical Office Head. (TOH)
The Design Engineer reports directly to the TOH and is responsible for
preparation of design drawings, calculations and Material Requisitions of
Code items being manufactured by the Company as well as repairs and
alternations in according to NBIC NB 23.
He reports directly to MD. He will define for each contract the following…
a) Fabrication Schedule of assigned work.
b) Preparation of Resource Plan (Material - Labourers - Machines) and
resources activity location.
c) Following-up of all activities.
d) Progress Reports (Daily - Weekly - Monthly).
Edition: III
Section : 3
Page : 4 of 6
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Organization
3.1.7 Projects Dept. Manager. (PSM)
The QCM reports directly to MD. He has the responsibility to ensure that all
the departments within workshop and field sites at all time comply with the
requirements of the applicable ASME Code, National Board Inspection
Code, and this Quality Control Manual.
Edition: III
Section : 3
Page : 5 of 6
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Organization
d. Preparation of revisions to Quality Control procedures and submission of
the same to the AI for his acceptance prior to inclusion or
implementation.
e. Review and certification of Manufacturer's Data Reports for Code Items.
f. Maintaining contact with the AI and the AIA.
g. Resolution of Nonconformities.
h. Control of all welding activities related to the Code sections ( WPS, PQR,
WPQ and WOPQ).
i. Performing the required inspection, examinations and/or tests by
himself or through his personnel and signifying completion of the
inspections, examination and tests and acceptance of production
function by signing or initialing the space provided on the ITP.
j. Approval of NDE procedures, and execution of required NDE through
qualified and certified personnel.
k. He is responsible for the control and acceptance of all subcontracting
activities directly associated with the Code Items.
l. He has to get assurance through supporting formal documents that the
subcontractor of a Code activity such as forming, PWHT, NDE, etc., is
qualified, experienced and capable to meet the Code requirements while
performing such activity.
m. The certified report of the subcontractor for such activity/activities shall
be reviewed by the QCM and sign if all Code requirements have been met
and the concurrence of the AI shall be obtained.
n. Other responsibilities of the QCM are quoted under individual applicable
sections of this Manual.
o. At his discretion, any of the above duties may be delegated to the
appropriate Quality Control Personnel.
The Quality Head reports directly to the Quality Control Manager and is
responsible for overall activities related to Quality at workshop or filed.
His further duties include but not limited to the following:
Edition: III
Section : 3
Page : 6 of 6
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Organization
3.1.9.2 NDE Level III
3.2.1 Any Manager or Department Head may delegate any of the duties
assigned to him to any of the qualified personnel who reports directly
to him. However, the responsibility of such duties cannot be delegated.
3.2.3 Each Person in a supervisory position may carry out the duties of
personnel under their supervision provided they are qualified and when
required are certified to perform the work.
Edition: III
Section : 4
Page : 1 of 8
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 1/ / 2012
Design,
Calculations,
Drawings and
Specifications
Edition: III
Section : 4
Page : 2 of 8
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 1/ / 2012
4.1 General
Each order received for a Code item is assigned a job or work order
number by the Sales and Proposal Manager, which is used to
identify documents related to the order.
4.2.1. For Code items, to be designed by PSC, the TOH and Quality
Control Manger review the Customer’s Design Specifications for Code
compliance and adequacy of data. Any deficiencies are reconciled
with the Customer to enable proper design work to start and
continue accordingly.
4.2.3. The applicable Code Edition and addenda used in design for
Code items according to Sections I and VIII Div. 1 shall be the
applicable Code Edition and addenda on time of contract.
Edition: III
Section : 4
Page : 3 of 8
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 1/ / 2012
4.4.1 Calculations
4.4.1.1 In case of Design by PSC
The Design Engineer is responsible for the preparation of
calculations, drawings and for issuing of Material Requisition Form
(04-01).
Edition: III
Section : 4
Page : 4 of 8
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 1/ / 2012
4.4.2 Drawings
4.4.2.1 The detailed drawings shall include, but not limited to,
details of welded and bolted joints, Non Destructive Examination,
Post Weld Heat Treatment, material specifications type, class or
grade, dimensions together with tolerances, Impact test requirement
and/or exemption, hydrostatic or pneumatic tests, applicable Code
Section Edition and Addenda, design data including MAWP and
Design Pressure at coincident temperature and minimum design
metal temperature. Drawings shall also indicate certification Mark
details and location.
Edition: III
Section : 4
Page : 5 of 8
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 1/ / 2012
4.6 Units
4.6.2 A single system of units shall be used for all aspects of design
except where unfeasible or impractical.
Edition: III
Section : 4
Page : 6 of 8
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 1/ / 2012
Edition: III
Section : 4
Page : 7 of 8
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 1/ / 2012
TOH shall assure that the pressure system design diagram or the
calculations are certified by a Professional Engineer experienced in
the mechanical design of power plants. TOH shall make the same
documents available to the Authorized Inspector for review.
Edition: III
Section : 4
Page : 8 of 8
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 1/ / 2012
Edition: III
Section : 5
Page : 1 of 7
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Material Control
Material
Control
Edition: III
Section : 5
Page : 2 of 7
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Material Control
5.1 Requisitions
Edition: III
Section : 5
Page : 3 of 7
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Material Control
5.2.1 For all Code material that must be ordered, Purchasing Head,
prepares the Purchase Order (Exhibit (05-02)) and attaches a copy of
the approved MRF, and submit this to one of the selected vendors.
However, purchase of welding consumable will be conducted with
the same way and in according to the final WCRF.
Edition: III
Section : 5
Page : 4 of 7
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Material Control
5.3.1 All Code Materials received at the shop or site are placed in
the material inspection storage area arranged by the Material
Control Head. This area is a part of the main storage area which
subdivided into three main areas; “Material Inspection Area”,
“Accepted Material Area” and “Hold Material Area”.
5.3.3 The Quality Control Eng., using his copy of the Material
Specification, MRR Exhibit (05-05) and MRF, examines all Code
Materials, except welding materials, for dimensions, marking,
condition and quantity. The result of inspection shall be recorded on
Material Receiving Inspection Form –MRIF-(exhibit (05-03)).The
Quality Control Engineer shall record the measuring
instruction used during incoming material inspection on the
MRIF report.
5.3.5 When acceptable, the Quality Control Eng. signs and dates
the MRIF and the Material Certificate or the Material test report
MRIF should be forwarded to the QCH for approval by signature and
date; then a copy is forwarded to Material Control Head to release
the materials to the work shop or site.
5.3.6 The Material Control Head will notify the concerned shop and
site Material Control Eng., the Site Manager or the Production
Manager of all materials released, by sending to them a copy of the
approved MRIF.
Edition: III
Section : 5
Page : 5 of 7
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Material Control
5.3.8 In case of any ASTM materials, the Quality Control Eng. shall
review the year of acceptable Edition according to the applicable
ASME Code Section, then review all the requirements of the ASTM
specification, sign and date Material Test Report (MTR) if acceptable
the material shall be recertified to required ASME specification
on the Material Test Certificate and material stamped
accordingly next to original stamping where ASTM material
are not according to acceptable Edition either older or newer
then acceptable shall be considered as non conforming and
dealt with as per Sec.7 of this Manual dealing with correction
of Nonconformities .In case of any deviation or rejection the usual
receiving procedure shall be followed.
5.3.9 Before cutting Material into two or more pieces, the entire
material marking is to be transferred by the layout foreman and
verified by the Quality Control Eng. a coded marking traceable to
the original required material marking and to the Material Certificate
or material specification, as required for the product form, may be
used to identify each piece. The method and extent of marking shall
be acceptable to the AI. The said marking shall be done as a
minimum by paint marking and a material map contains heat
number, designation, grade, manufacturing name and certification
number (if required) shall be used for all Code items for the purpose
of maintaining material traceability (Vessels/Tanks Material Map -
Exhibit (05-06)) or (Piping Material Map- Exhibit (05-07)).
Material Control
5.4.4 AI shall be afforded the right to inspect and verify all Parts
against the applicable Manufacturer's Partial Data Report prior to
use.
5.4.5 Parts that do not meet Code and Customer Requirements are
considered nonconforming and shall be dealt with as described in
Section 7 of this Manual. (Dealing with Correction of Non-
conformities)
Edition: III
Section : 5
Page : 7 of 7
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Material Control
5.9 Nonconformities.
Quality Control Eng. must report any nonconformity to QCH and
QCM to take action and solution as described in Section "7" of this
Manual. (Dealing with Correction of Non-conformities).
Edition: III
Section : 6
Page : 1 of 6
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Examination and
Inspection
Program
Edition: III
Section : 6
Page : 2 of 6
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
6.2 Scope:
6.3.1 Inspection & Test Plan (Exhibit (06-01)) is established to control the
examination and inspection program system. It shall be prepared by
QCH from the approved shop drawings and shall list the sequence of
fabrication, examination and inspection operations for each item in
the spaces provided. Approval of this document shall be granted by
QCM. It shall be presented to the AI for his review and designation of
inspection points and, if required, the client acceptance prior to
release for fabrication.
6.3.2 For each inspection and test point, the plan shall indicate the
applicable procedure, which details the characteristics to be
inspected, inspection technique and acceptance criteria.
6.3.3 The ITP shall be the master document for controlling and
documenting the status of operations in PSC workshop and include
the inspection points, in addition to the following:
Edition: III
Section : 6
Page : 3 of 6
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
6.3.4 When approved shop drawings revised; the QCH shall review
the ITP for any required changes and if these drawings revisions not
affected the contents of the ITP; this shall be documented on the
cover sheet of the ITP and signed and dated by all concerns (QCH,
QCM and the AI).
6.3.5 The Inspection & Test Plan contains columns for the initials
and date of the Quality Control Eng. on the applicable line for those
operations he accepts, and for the Authorized Inspector to initial and
date in the column provided for him to signify those operations he
accepts.
Edition: III
Section : 6
Page : 4 of 6
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
6.8.3 For parts not tested until field assembly is completed, the AI
makes his inspection after fabrication of the part is completed at
the shop.
6.9.1 QCM shall verify that the AI has been notified sufficiently in
advance of each test so that he shall witness them, and complete his
inspections; pressure test shall be performed according to a written
procedure prepared by the QCH and approved by QCM, the gage
identification number shall recorded on the pressure test
report by the QC Eng.
Edition: III
Section : 6
Page : 5 of 6
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
6.11.1 The QCM has the responsibility for the safe custody and
control of the ASME Certification Mark stamps and National
Board NB stamp to prevent loss or unauthorized use.
Edition: III
Section : 6
Page : 6 of 6
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
6.12 Nonconformities
All Nonconformities found during fabrication or field assembly are
controlled and corrected as described in Section 7 which deals with
Correction of Non-conformities of this Manual.
Edition: III
Section : 7
Page : 1 of 3
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Correction Of Nonconformities
Correction Of
Nonconformities
Edition: III
Section : 7
Page : 2 of 3
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Correction Of Nonconformities
7.1.2 It is the duty of all PSC work shop and Field Site Employees to
report nonconformities to their supervisor, who will notify to the
Quality Control Head or Site Quality Control Eng.; who shall identify
ether the Nonconformity related to work procedures or fabrication.
Edition: III
Section : 7
Page : 3 of 3
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Correction Of Nonconformities
7.3.1 USE-AS-IS.
When the disposition is USE-AS-IS regarding any item affects the
design aspects, the decision, in this respect, shall be approved by
TOH.
7.3.2 REPAIR.
Repair shall be carried out using written procedures approved by the
QCM and accepted by the AI .
7.3.3 SCRAP.
This disposition requires the QCH to verify and document on the
Nonconformance Report that the Item has been removed from the
work area and tagged or clearly marked "HOLD" to prevent its
inadvertent use before disposal.
7.3.5 OTHER.
Any other dispositions not defined above.
7.5 Records
7.5.1 Where AI involvement is required by the Code, the procedure
is agreed upon with the AI.
Edition: III
Section : 8
Page : 1 of 7
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Welding Control
Welding Control
Edition: III
Section : 8
Page : 2 of 7
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Welding Control
8.1 General
8.2.1 WPSs (Exhibit No. (08-02)) and PQRs Exhibit No. (08-03) are
prepared by the QCH and shall include all welding variables required
for the welding process by ASME Code Sec. IX and the intended range
of production welding. The required test welds are made under the
supervision of the QCH or his designee. Preparation and testing of
the required test specimens are performed by approved testing
laboratory, witnessed during performance by the QCH or his
designee. If the test results are acceptable to Code Sec. IX
requirements the QCH shall prepare and certify, by signature and
date, the Procedure Qualification Record (PQR). The PQR shall
include at least all essential actual variables used in making the
qualification test welds.
8.2.2 The QCH prepares a list of approved WPSs using WPSs Log
Exhibited no. (08-06). Copies of the WPSs Log and the qualified WPSs
are provided to the Production Manager or Site Manager or his
designee, who make it available to the welder in the work area to be
used during welding of allocated weld joint.
8.2.4 WPSs and PQRs are made available to the Authorized Inspector
for his review who may request re-qualification of a WPS for cause.
Edition: III
Section : 8
Page : 3 of 7
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Welding Control
Edition: III
Section : 8
Page : 4 of 7
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Welding Control
8.5.2 The QCH determines from the ASME Qualified Welders List
when the Welder's qualification will expire, so as to ensure he
performs production welding, or is re-qualified, when production
welding is used for conformity of welder qualification copies of
production welding records such as NDE reports, etc.
Edition: III
Section : 8
Page : 5 of 7
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Welding Control
8.6.1 The QCH and Production Manager verifies that all production
Welders are qualified for the performance essential variables to be
used, and the Welding Production Manager designee is responsible
for instructing the welders in the correct use of the WPSs listed on the
WPSs approved Log and for which weld it will be used.
8.6.2 The QC Eng. uses the Welding Map Exhibit (08-07) or Piping
Welding Summary Exhibit (08-08) prepared by QC Eng. And
approved by QCH using approved DWG for the proper follows up of
welding activities and welding traceability records whenever
approved DWG revised the Welding Map reviewed by QC Eng. For
changes and if no changes the review is documented on the
cover sheet of Welding Map.
8.7.2 If left in place, the ends of each tack weld are ground or
suitably prepared to ensure complete fusion into the final weld.
Edition: III
Section : 8
Page : 6 of 7
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Welding Control
8.9.2 The QCH or his designee supervises the welding of the test
plates from which specimens are prepared and tested by approved
testing laboratory whose test report is reviewed by the QCH for
acceptance of results or need for retest.
Edition: III
Section : 8
Page : 7 of 7
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Welding Control
8.9.3 Test results are made available to the AI for his review and
acceptance. The Authorized Inspector may witness the tests if he
desires.
All records mentioned in this Section are made available for review by
the AI and are retained in the job file maintained by the QCH (See
Sec. 12 of this Manual dealing with the Records Retention).
Edition: III
Section : 9
Page : 1 of 5
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Non Destructive
Examination
Edition: III
Section : 9
Page : 2 of 5
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
9. Scope
9.0.1 This Section describes system for Code required Non Destructive
Examination activities.
9.0.2 Company has in-house NDE capabilities except performance of RT
which is subcontracted to an approved subcontractor having proven
experience; however the final interpretation and evaluation shall be
done by PSC qualified and certified level II personnel or accepted
subcontractor inspectors as per 9.2 below.
9.0.3 Visual examination for Powerpiping which shall be carried out by
examiners qualified as per 9.7 below.
9.0.4 PSC Company may use subcontractor to perform and evaluate NDE as
needed, however the performance and evaluation of results shall be
per PSC NDE Procedure.
9.1.2 The appointment of the NDE Level III shall be based on the following:
• Educational qualification based on SNT-TC-1A requirements.
• Valid endorsement on his ASNT level III or ACCP Professional Level
III certificate for RT, UT, MT and PT methods.
• Experience in providing Level III services to other ASME Code
Stamp holders.
• Experience in developing NDE procedures and monitoring NDE
activities on boilers, pressure vessel and piping products.
9.1.3 The appointment shall be valid for a maximum of 3 years but the QC
Manager shall have the authority to extend the validity or to cancel it
any time.
9.1.4 The level III shall maintain the validity of his ASNT certificate during
appointment period and responsible for:
Edition: III
Section : 9
Page : 3 of 5
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
9.2.1 The Company shall provide the following documents for review and
verification
• Written Practice in accordance with Code adopted Edition of SNT-
TC-1A.
• Personnel qualification and certification records in accordance with
his written practice.
• NDE procedures including their demonstration, qualification and
certification records.
• Calibration records of the instruments to be used.
• Eye examination records.
9.2.2 All above documents shall be Prepared & reviewed by NDE Level III on
behalf of the Company and approved by QC Manager and a copy of all
the above documents shall be kept for records and for review by the
AI.
9.2.3 Based on the review by NDE Level III, QC Manager shall certify that
the NDE personnel are qualified and certified based on the written
practice.
9.2.4 Subcontractor shall submit the same documents mentioned in Para
9.2.1, subjected to PSC Level III review and PSC QCM approval, except
NDE Procedures, as the subcontractor shall use the approved PSC
NDE procedures for carrying out all assigned NDE activities. However,
evaluation of results shall be carried out by the qualified PSC
personnel as per the applicable Codes and procedures or accepted
subcontractor inspectors as per 9.3 below.
9.2.5 A copy of NDE Subcontractor's documents shall be kept for records
and for review by the AI.
9.3.1 The NDE Procedures for UT, PT and MT shall be demonstrated to the
satisfaction of the AI for producing meaningful results. NDE Level III
shall certify the NDE procedures to be in accordance with T-150 of
ASME Code Section V.
Edition: III
Section : 9
Page : 4 of 5
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
9.3.2 When required by the construction Code, these procedures shall also
be qualified by demonstration for the range of essential variables
intended to be used. Any change in the essential variable shall require
re-qualification by demonstration.
9.3.3 RT procedure does not require demonstration and achieving the
required density and penetrameter image on technique or production
radiographs is considered as satisfactory demonstration of technique.
9.3.4 QC Manager shall be responsible to maintain the records of procedure
demonstration and qualifications.
Edition: III
Section : 9
Page : 5 of 5
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
9.7.1.2 Each Examiner shall have an eye examination performed each year
to determine optical capability to perform the required examinations.
Examiners shall be at least capable of reading Jaeger No. 1, with or
without correction, and capable of distinguishing contrast between
colors.
9.7.1.3 On the job training for 2 days (4 hours each day) to familiarize the
Examiner with the appearance and interpretation of indications of
weld defects.
9.7.1.4 Upon completion of 9.7.1.1 thru 9.7.1.3 above, the Examiner shall
be given a written examination of 15 questions and a performance
examination to determine if they are qualified to perform the required
examinations and interpretation of results.
9.7.1.5 An oral examination may be given in place of the written one
consisting of the same number of predetermined questions as the
written examination and the answers documented by the Quality
Control Manager or the Company NDE Level III.
9.7.1.6 Visual examination personnel who have not performed power piping
inspections for a period of one year or more shall be reexamined as
required by 9.7.1.4 or 9.7.1.5 and also pass the eye examination of
9.7.1.2 above and be recertified prior to performing any weld
inspections.
9.7.1.7 The following may be used as alternatives to the preceeding
program, as applicable: SNT-TC-1A or CP-198; and personnel
qualified to AWS QC1 may be used for visual examinations of power
piping weld.
Edition: III
Section : 10
Page : 1 of 2
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Heat treatment
Heat Treatment
Edition: III
Section : 10
Page : 2 of 2
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Heat treatment
(10) Heat Treatment
10.1 General
10.2 Procedures.
All Code Heat Treatment is performed as specified in a written
procedure prepared by QC Engineer approved by the QCH, which
describes the placement and method of attachment of
thermocouples, temperature gradients for heating and cooling,
soaking time at temperature as well as the records required as a
minimum.
Edition: III
Section : 11
Page : 1 of 3
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Calibration of
Measurement and Test Equipment
Calibration of
Measurement and
Test Equipment
Edition: III
Section : 11
Page : 2 of 3
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Calibration of
Measurement and Test Equipment
11.1 General
All measurement, examination and test equipment used for
fulfillment of Code requirements is calibrated in accordance with
this Section and written Calibration Procedures approved by the
QCM.
Edition: III
Section : 11
Page : 3 of 3
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Calibration of
Measurement and Test Equipment
Edition: III
Section : 12
Page : 1 of 4
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Record Retention
Records
Retention
Edition: III
Section : 12
Page : 2 of 4
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Record Retention
12.4 The QCM shall maintain a file after stamping of the vessel, and
furnish to the user and, upon request, to the AI, the reports and
records shown in the following :-
Edition: III
Section : 12
Page : 3 of 4
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Record Retention
Edition: III
Section : 12
Page : 4 of 4
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Record Retention
Edition: III
Section : 13
Page : 1 of 3
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Authorized Inspector
Authorized Inspector
Edition: III
Section : 13
Page : 2 of 3
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Authorized Inspector
13.4.1 The AIA that will perform the activities shall perform it in
accordance with the Quality Control Manual of PSC, in case of any
difference than the Quality Control Manual; PSC shall notify the
AIA of Record and take his acceptance for the difference.
13.4.3 PSC shall notify the AIA of Record and ASME Organization
whenever the written agreement has been canceled, or changing to
another inspection agency.
Edition: III
Section : 13
Page : 3 of 3
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Authorized Inspector
13.5 The rules of the Code shall serve as the basis for The AI to…
1. Perform his required duties.
2. Authorize and witness the application of Code Symbol
Stamp.
3. Sign the MDR of Shop Inspection and / or Field Assembly.
13.12 The final records, together with the completed MDR certified
by QCM, are submitted to AI for his authorization to apply the
Code Symbol Stamp and Signature, when he has satisfied himself
that all Code Requirements have been met.
Edition: III
Section : 14
Page : 1 of 5
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Field Assembly
Field Assembly
Edition: III
Section : 14
Page : 2 of 5
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Field Assembly
(14) Field Assembly
14.1 Scope
This Section describes the system for assuring that all requirements
of the Code and Client's Specifications are met with respect to Site
work required in connection with the construction of Boiler, Power
Piping and Pressure Vessels.
Site Work will only consist of completion or assembly of Vessels,
Boiler or Piping Systems which, because of size or convenience
cannot be completed at the Shop.
14.2 Organization.
As indicated in the PSC Organization Chart Section "3" of this
Quality Control Manual, Construction Manager is responsible for all
activities concerning each site on the basis of the documents
transmitted by TOH and by QCM.
The Site Quality Control Engineer reports directly to Site
Manager administratively and for all Site quality Control
activities and to the QCH at the shop.
Directly under the Authority of the Construction Manager there is
the Site Manager who is responsible for the Field assembly activities
on Site.
Field Assembly
Edition: III
Section : 14
Page : 4 of 5
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Field Assembly
14.8 Nonconformities.
All Non-conformities found during Site work shall be handled in
accordance with Section "7" of this Quality Control Manual dealing
with Correction of Non-conformities. Except that the Site Quality
Control Engineer shall be responsible for preparing the
Nonconformance Report including approval of disposition.
Edition: III
Section : 14
Page : 5 of 5
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Field Assembly
14.13 Records Retention.
Quality Control Documents shall be prepared and maintained in
accordance with Section "12" of this Quality Control Manual dealing
with Record Retention.
The Site QC Engineer is the liaison officer with the AI at site. PSC
shall provide suitable working facilities for AI and AIS at site.
Edition: III
Section : 15
Page : 1 of 10
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
Repairs and
Alterations
Edition: III
Section : 15
Page : 2 of 10
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
15.1. General :
15.2.1. QCM is responsible for compliance with this Manual for shop or field
repairs and alterations to pressure vessels. (See Section 2 of this
Manual)dealing with statement of Authorty and Resposiblity.
15.3.1 The preparation, revision and issue of this Quality Control Manual
shall be the responsibility of QAH. The system has been detailed in
Section-1 of this Manual dealing with Manual control.
Edition: III
Section : 15
Page : 3 of 10
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
15.4. Organization
15.4.1 The Organization Chart for carrying out repair and alteration at shop
and field sites controlled from shop shall be as shown in Section-3 of
this Manual and the Quality Control responsibilities are as detailed in
Section-3 of this Manual dealing with Organization.
15.5.2. When the original equipment is not constructed to the ASME Code,
repairs and alterations shall conform insofar as possible to the edition
of the construction standard or specification most appropriate to the
work. Where use of original construction code is not possible or
practicable, other codes, standards, specifications including ASME
Code with latest Edition and Addenda may be used provided prior
concurrence of the AI has been obtained. When applicable prior
concurrence of Jurisdiction and Owner shall also be obtained for use of
standards other that original construction standard.
15.6.1. On receiving the order for carrying out Repairs or Alteration, it shall
be the responsibility of assigned Design Engineer ( See Section 4 of this
Manual) dealing with Design,Calculation,Drawing and
Specification to identify and confirm whether the required work is
categorized as Repair or Alteration or Rerating in accordance with the
requirements of NBIC NB23.
Edition: III
Section : 15
Page : 4 of 10
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
15.6.4. Drawings for alterations (and when required for repairs) shall be
approved by TOH. In addition to the applicable details given in Section-
4 , the drawings shall also indicate the original construction Code,
construction Code used for repairs/alterations, applicable National
Board Inspection Code addenda and name plate stamping details.
Distribution and revision to the drawings shall be controlled in the
manner described in Section-4 dealing with
Design,Calculation,Drawing and Specification.
15.6.7. All design documents shall be submitted to the AI for his review
before proceeding further with repairs or alterations.
15.7. Materials
15.7.4. Carbon or alloy steels having carbon content more than 0.35% shall
Edition: III
Section : 15
Page : 5 of 10
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
15.8.3. Standard WPS shown in Part 3, Table 2.3 of the NBIC NB23 can be
used for repairs or for performance qualification. Such WPS shall be
documented and certified by QC Head for use. When required, owners
or jurisdiction’s acceptance will be obtained for use of standard WPS.
15.9.1. All examination and tests required during and after repairs or
alterations shall be identified on the Repair procedure and ITP.
15.9.2. Requirements for the pressure tests including test medium, test
pressure, holding time, and temperature limits etc. shall be specified in
the repair procedure.
15.9.3. All pressure tests shall be witnessed by the QC Head and shall be
offered to the AI.
15.9.5. The metal temperature during Pressure Test shall not be less than
60°F (16°C) or more than 120°F (50°C). Care shall be taken to ensure
that the pressure relief devices on the equipment are either removed or
gaged before test. Test pressure shall be held for minimum of 10
Edition: III
Section : 15
Page : 7 of 10
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
15.9.6. When Liquid Pressure Test is not practicable the QC Head shall
obtain the acceptance of the AI and the owner/user for carrying out
alternative test as described in NBIC NB Part 3 Sec.4. This acceptance
shall be obtained and recorded before performing any alternative
examination or testing.
15.10. Non-Conformities
15.11. Calibration
15.11.1. All equipment and gauges used for inspection and examination
during repair and alterations shall be maintained and calibrated in
accordance with Section-11 of this Manual dealing with Calibration
Of Measurementand Test Equipment.
15.12. Procedure :
15.12.1. All repairs and alterations to Code pressure vessels are subject to
acceptance of the Authorized Inspector, who may require that evidence
of acceptance of the method and extent of repairs or alteration by the
jurisdiction or insurance carrier responsible for in-service inspection be
provided before starting work.
15.12.2. The Quality Control Manager, prior to the start of work, provides the
Authorized Inspector with drawings, calculations, procedures, Repair
Inspection and test plan (ITP), copy of the original Manufacturer’s Data
Report (for ASME Code stamped items) for the item and any other
documents necessary for the Authorized Inspector to review and accept
the method of repair or alteration and to designate his required
inspection points.
15.12.6. All examinations and tests required by the Code for the original
construction of the pressure vessel are required for repair or alteration,
except that if impossible or impracticable, alternative method
acceptable to the Authorized Inspector may be used.
15.13. Records :
15.13.4. All records referenced in this Section are available for review by the
Authorized Inspector. Forms R1 or R2 is distributed as described in
15.6.
15.14. Stamping :
Edition: III
Section : 15
Page : 9 of 10
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
(a) Witness the marking of a facsimile or rubbing of the old and new
stamping;
(b) Witness obliteration or removal of the old stamping, and transfer of
the stamping to the new part or location on the item, less the original
Code symbol/Certification Marking. The Code symbol/Certification
marking is not re-stamped.
15.14.3. The Quality Control Manager retains custody and control of the “R”-
Stamp. Stamping may either be on the Code item or on a name plate.
Marking shall be as indicated in Marking/Name Plate for ‘R’ stamp
(Exhibit No. 15-02.). This symbol is the property of the national Board
and shall be retained on demond to National Board.
Edition: III
Section : 15
Page : 10 of 10
QUALITY CONTROL MANUAL Rev. : 1
Date : 21 / 10 / 2012
15.17.1. When routine repairs, as defined in NBIC, Part 3, 3.3.2 are required,
the Quality Control Manager shall ensure that the routine repairs are
acceptable to the jurisdiction.
15.17.3. Repair procedure / ITP for routine repairs shall be prepared and
submitted to the AI for his acceptance and signature.
15.17.4. Form R-1 shall be prepared and certified by the Quality Control
Manager, and shall include a statement “Routine Repairs” in the
Remarks column in the R-Form. R-1 form shall be submitted to AI for
his signature
Edition: III