Packard KV2 Maintenance Manual
Packard KV2 Maintenance Manual
Packard KV2 Maintenance Manual
ASSEMBLY PROCEDURE FOR THE TWO PIECE 3.9 Insert wave Spring into the Sub.
KELLY VALVES
3.10 Insert Seat into the Sub with radial
1.0 SCOPE surface toward Ball.
1.1 This procedure will provide general
instructions regarding assembling the 3.11 Use operating wrench to turn ball to the
Two Piece Kelly valves with the IDs: half open position.
• 2”
• 2-7/16” 3.12 Apply suitable thread dope to the middle
• 2-3/4” connection of Sub and Body.
• 3-1/4”
3.13 Recommended: Dope base to include
40% to 60% (by weight) finely powdered
2.0 REFERENCES
zinc or lead.
2.1 The latest revision of the following
3.14 Screw Upper Sub into the Lower Sub.
specifications may be used to obtain
Make-up shoulders by hand with chain
additional information regarding this
tongs or equivalent.
procedure.
3.15 Torque Lower Sub to Upper Sub:
• Packard Quality Procedures Manual.
• API Specification 7-1 latest edition. • For Standard / H2S Trim Service:
• Bill of materials. Middle Connection
ID OD TORQUE IN FT/LBS
3.0 ASSEMBLY PROCEDURE
+500 / -0
4.5” 7,500
3.1 Clean valve body & sub and all internal 2”
parts. 5” 16,960
2-7/16” 4-7/8 9,800
3.2 Visually Inspect for sign of damage or 6-3/8” 33,350
2-3/4”
wear. 6-3/4” 41500
6-3/4” 26,250
3.3 If a stem with one ear is used on the 7-1/2” 54,500
3-1/4”
valve, discard it and use the new style 7-3/4” 61,750
two ears stem with the supplied stop ring 8-1/2” 83,700
Note: there is no need for the stop ring This is a generic table for products with Standard
To be installed if the valve was delivered API service connections. Request make-up torque
with the new stem style installed in the value information from Packard when the valve has
body. Proprietary high torque service connections.
3.6 Insert Seat into the Body. The Ball will HYDROSTATIC TESTING PRESSURES
ride on radial surface of Seat.
MAXIMUM WORKING MAXIMUM HYDROSTATIC
3.7 Insert Operator (stem). The V mark on PRESSURE RATING SHELL TEST PRESSURE
the stem should be towards the close psi MPa psi MPa
mark on the valve, representing closed 5000 34.5 10,000 68.9
position of Ball. 10,000 68.9 15,000 103.4
15,000 103.4 22,500 155.1
3.8 Insert Ball in closed position. Note: test pressure shall be stabilized prior to the
timing start for holding pressure
22397 White Oak Drive • Conroe, Texas 77306-8859 • Tel: 281-399-8771 • Fax: 281-399-8773 • www.packardusa.com
1/5
TWO PIECE KELLY VALVES
OPERATION AND MAINTENANCE PROCEDURE REV 2 –
01/2012
Seat Test :
22397 White Oak Drive • Conroe, Texas 77306-8859 • Tel: 281-399-8771 • Fax: 281-399-8773 • www.packardusa.com
2/5
TWO PIECE KELLY VALVES
OPERATION AND MAINTENANCE PROCEDURE REV 2 –
01/2012
22397 White Oak Drive • Conroe, Texas 77306-8859 • Tel: 281-399-8771 • Fax: 281-399-8773 • www.packardusa.com
3/5
TWO PIECE KELLY VALVES
OPERATION AND MAINTENANCE PROCEDURE REV 2 –
01/2012
MAINTENANCE
3.4 How the valve is used and the
1.0 SCOPE frequency of maintenance become the
priority in ensuring long operating life.
1.1 This procedure will provide general The valve should be operated at
instructions regarding the maintenance balanced pressure. If the valve is closed
of the two Piece Kelly Valve when the mud pumps are started and it
is opened with pressure from above, the
2.0 REFERENCES operating life will be shortened.
22397 White Oak Drive • Conroe, Texas 77306-8859 • Tel: 281-399-8771 • Fax: 281-399-8773 • www.packardusa.com
5/5