RFI Log EPC045 - Draft From Jiojo

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 124

Inspection Notif

RFI Inspection Week


S.No. RFI/IN Number Contractor Discipline Submitted Date Number
Date

1 IN-HSS-C-0001 EPC045 Civil ###18-July,2016 21-Jul-16 30

2 IN-HSS-C-0003 EPC045 Civil ###28-July,2016 30-Jul-16 31

3 IN-HSS-C-0004 EPC045 Civil ###30-July,2016 30-Jul-16 31

4 IN-HSS-C-0005 EPC045 Civil ###31-July,2016 30-Jul-16 31

5 IN-HSS-C-0006 EPC045 Civil ###31-July,2016 1-Aug-16 32

6 IN-HSS-C-0007 EPC045 Civil ###31-July,2016 2-Aug-16 32

7 IN-HSS-C-0008 EPC045 Civil ###31-July,2016 3-Aug-16 32

1st
8 IN-HSS-C-0009 EPC045 Civil ###August,2016 4-Aug-16 32

2nd
9 IN-HSS-C-0011 EPC045 Civil ###August,2016 6-Aug-16 32

2nd
10 IN-HSS-C-0012 EPC045 Civil ###August,2016 7-Aug-16 33

4th
11 IN-HSS-C-0015 EPC045 Civil ###August,2016 8-Aug-16 33
4th
12 IN-HSS-C-0016 EPC045 Civil ###August,2016 8-Aug-16 33

6th
13 IN-HSS-C-0018 EPC045 Civil ###August,2016 9-Aug-16 33

6th
14 IN-HSS-C-0020 EPC045 Civil ###August,2016 9-Aug-16 33

6th
15 IN-HSS-C-0022 EPC045 Civil ###August,2016 10-Aug-16 33

6th
16 IN-HSS-C-0024 EPC045 Civil ###August,2016 10-Aug-16 33

8th
17 IN-HSS-C-0026 EPC045 Civil ###August,2016 11-Aug-16 33

8th
18 IN-HSS-C-0029 EPC045 Civil ###August,2016 13-Aug-16 33

9th
19 IN-HSS-C-0031 EPC045 Civil ###August,2016 13-Aug-16 33

9th
20 IN-HSS-C-0033 EPC045 Civil ###August,2016 14-Aug-16 34

11th
21 IN-HSS-C-0035 EPC045 Civil ###August,2016 15-Aug-16 34

11th
22 IN-HSS-C-0036 EPC045 Civil ###August,2016 16-Aug-16 34

###13th2016
August,
23 IN-HSS-C-0038 EPC045 Civil 18-Aug-16 34

###15th2016
August,
24 IN-HSS-C-0041 EPC045 Civil 20-Aug-16 34

###15th2016
August,
25 IN-HSS-C-0043 EPC045 Civil 20-Aug-16 34
###15th2016
August,
26 IN-HSS-C-0045 EPC045 Civil 21-Aug-16 35

17th
27 IN-HSS-C-0047 EPC045 Civil ###August,2016 22-Aug-16 35

17th
28 IN-HSS-C-0050 EPC045 Civil ###August,2016 22-Aug-16 35

17th
29 IN-HSS-C-0052 EPC045 Civil ###August,2016 23-Aug-16 35

17th
30 IN-HSS-C-0053 EPC045 Civil ###August,2016 23-Aug-16 35

20th
31 IN-HSS-C-0055 EPC045 Civil ###August,2016 24-Aug-16 35

20th
32 IN-HSS-C-0056 EPC045 Civil ###August,2016 27-Aug-16 35

23rd
33 IN-HSS-C-0058 EPC045 Civil 28-Aug-16 36
August,2016

23rd
34 IN-HSS-C-0061 EPC045 Civil 29-Aug-16 36
August,2016

23rd
35 IN-HSS-C-0062 EPC045 Civil 28-Aug-16 36
August,2016

24th
36 IN-HSS-C-0065 EPC045 Civil 30-Aug-16 36
August,2016

25th
37 IN-HSS-C-0068 EPC045 Civil 29-Aug-16 36
August,2016

27th
38 IN-HSS-C-0070 EPC045 Civil 31-Aug-16 36
August,2016

27th
39 IN-HSS-C-0074 EPC045 Civil 1-Sep-16 36
August,2016
27th
40 IN-HSS-C-0077 EPC045 Civil 30-Aug-16 36
August,2016

27th
41 IN-HSS-C-0079 EPC045 Civil 31-Aug-16 36
August,2016

27th
42 IN-HSS-C-0081 EPC045 Civil 31-Aug-16 36
August,2016

27th
43 IN-HSS-C-0083 EPC045 Civil 3-Sep-16 36
August,2016

29th
44 IN-HSS-C-0085 EPC045 Civil 3-Sep-16 36
August,2016

30th
45 IN-HSS-C-0089 EPC045 Civil 3-Sep-16 36
August,2016

30th
46 IN-HSS-C-0090 EPC045 Civil 4-Sep-16 37
August,2016

31st
47 IN-HSS-C-0092 EPC045 Civil 5-Sep-16 37
August,2016

48 IN-HSS-C-0094 EPC045 Civil 1st Sept.,2016 5-Sep-16 37

49 IN-HSS-C-0097 EPC045 Civil 1st Sept.,2016 6-Sep-16 37

50 IN-HSS-C-0101 EPC045 Civil 3rd Sept.,2016 6-Sep-16 37

51 IN-HSS-C-0102 EPC045 Civil 3rd Sept.,2016 6-Sep-16 37

52 IN-HSS-C-0104 EPC045 Civil 3rd Sept.,2016 6-Sep-16 37

53 IN-HSS-C-0106 EPC045 Civil 4th Sept.,2016 7-Sep-16 37


54 IN-HSS-C-0108 EPC045 Civil 4th Sept.,2016 7-Sep-16 37

55 IN-HSS-C-0111 EPC045 Civil 4th Sept.,2016 8-Sep-16 37

56 IN-HSS-C-0114 EPC045 Civil 5th Sept.,2016 9-Sep-16 37

57 IN-HSS-C-0115 EPC045 Civil 5th Sept.,2016 10-Sep-16 37

58 IN-HSS-C-0118 EPC045 Civil 6th Sept.,2016 10-Sep-16 37

59 IN-HSS-C-0121 EPC045 Civil 6th Sept.,2016 15-Sep-16 38

60 IN-HSS-C-0125 EPC045 Civil 6th Sept.,2016 14-Sep-16 38

61 IN-HSS-C-0130 EPC045 Civil 6th Sept.,2016 15-Sep-16 38

62 IN-HSS-C-0131 EPC045 Civil 6th Sept.,2016 17-Sep-16 38

63 IN-HSS-C-0132 EPC045 Civil 6th Sept.,2016 15-Sep-16 38

64 IN-HSS-C-0133 EPC045 Civil 6th Sept.,2016 17-Sep-16 38

65 IN-HSS-C-0135 EPC045 Civil 6th Sept.,2016 15.9.2016 #VALUE!

10th
66 IN-HSS-C-0138 EPC045 Civil 15-Sep-16 38
Sept.,2016

10th
67 IN-HSS-C-0141 EPC045 Civil 15-Sep-16 38
Sept.,2016
10th
68 IN-HSS-C-0144 EPC045 Civil 15-Sep-16 38
Sept.,2016

10th
69 IN-HSS-C-0146 EPC045 Civil 17-Sep-16 38
Sept.,2016

10th
70 IN-HSS-C-0150 EPC045 Civil 15-Sep-16 38
Sept.,2016

10th
71 IN-HSS-C-0154 EPC045 Civil 17-Sep-16 38
Sept.,2016

10th
72 IN-HSS-C-0155 EPC045 Civil 18-Sep-16 39
Sept.,2016

10th
73 IN-HSS-C-0157 EPC045 Civil 18-Sep-16 39
Sept.,2016

10th
74 IN-HSS-C-0159 EPC045 Civil 19-Sep-16 39
Sept.,2016

17th
75 IN-HSS-C-0161 EPC045 Civil 19-Sep-16 39
Sept,2016

17th
76 IN-HSS-C-0162 EPC045 Civil 20-Sep-16 39
Sept,2016

17th
77 IN-HSS-C-0164 EPC045 Civil 20-Sep-16 39
Sept,2016

17th
78 IN-HSS-C-0166 EPC045 Civil 21-Sep-16 39
Sept,2016

18th
79 IN-HSS-C-0171 EPC045 Civil 21-Sep-16 39
Sept,2016

18th
80 IN-HSS-C-0172 EPC045 Civil 21-Sep-16 39
Sept,2016

19th
81 IN-HSS-C-0174 EPC045 Civil 22-Sep-16 39
Sept,2016
19th
82 IN-HSS-C-0177 EPC045 Civil 22-Sep-16 39
Sept,2016

19th
83 IN-HSS-C-0180 EPC045 Civil 22-Sep-16 39
Sept,2016

20th
84 IN-HSS-C-0182 EPC045 Civil 24-Sep-16 39
Sept,2016

20th
85 IN-HSS-C-0184 EPC045 Civil 24-Sep-16 39
Sept,2016

20th
86 IN-HSS-C-0187 EPC045 Civil 24-Sep-16 39
Sept,2016

20th
87 IN-HSS-C-0190 EPC045 Civil 25-Sep-16 40
Sept,2016

21st
88 IN-HSS-C-0193 EPC045 Civil 25-Sep-16 40
Sept,2016

22nd
89 IN-HSS-C-0195 EPC045 Civil 25-Sep-16 40
Sept,2016

22nd
90 IN-HSS-C-0196 EPC045 Civil 25-Sep-16 40
Sept,2016

24th
91 IN-HSS-C-0198 EPC045 Civil 26-Sep-16 40
Sept,2016

24th
92 IN-HSS-C-0201 EPC045 Civil 27-Sep-16 40
Sept,2016

24th
93 IN-HSS-C-0206 EPC045 Civil 27-Sep-16 40
Sept,2016

24th
94 IN-HSS-C-0209 EPC045 Civil 26-Sep-16 40
Sept,2016

24th
95 IN-HSS-C-0212 EPC045 Civil 28-Sep-16 40
Sept,2016
24th
96 IN-HSS-C-0214 EPC045 Civil 29-Sep-16 40
Sept,2016

24th
97 IN-HSS-C-0216 EPC045 Civil 28-Sep-16 40
Sept,2016

24th
98 IN-HSS-C-0218 EPC045 Civil 28-Sep-16 40
Sept,2016

25th
99 IN-HSS-C-0220 EPC045 Civil 28-Sep-16 40
Sept,2016

25th
100 IN-HSS-C-0221 EPC045 Civil 28-Sep-16 40
Sept,2016

26th
101 IN-HSS-C-0223 EPC045 Civil 29-Sep-16 40
Sept,2016

26th
102 IN-HSS-C-0226 EPC045 Civil 29-Sep-16 40
Sept,2016

26th
103 IN-HSS-C-0229 EPC045 Civil 1-Oct-16 40
Sept,2016

27th
104 IN-HSS-C-0234 EPC045 Civil 1-Oct-16 40
Sept,2016

27th
105 IN-HSS-C-0239 EPC045 Civil 4-Oct-16 41
Sept,2016

27th
106 IN-HSS-C-0241 Civil 5-Oct-16 41
Sept,2016

27th
107 IN-HSS-C-0243 EPC045 Civil 4-Oct-16 41
Sept,2016

27th
108 IN-HSS-C-0245 EPC045 Civil 5-Oct-16 41
Sept,2016

27th
109 IN-HSS-C-0247 EPC045 Civil 6-Oct-16 41
Sept,2016
27th
110 IN-HSS-C-0248 EPC045 Civil 3-Oct-16 41
Sept,2016

27th
111 IN-HSS-C-0250 EPC045 Civil 3-Oct-16 41
Sept,2016

29th
112 IN-HSS-C-0252 EPC045 Civil 3-Oct-16 41
Sept,2016

29th
113 IN-HSS-C-0255 EPC045 Civil 3-Oct-16 41
Sept,2016

29th
114 IN-HSS-C-0258 EPC045 Civil 4-Oct-16 41
Sept,2016

1st
115 IN-HSS-C-0262 EPC045 Civil 5-Oct-16 41
Oct,2016

03
116 IN-HSS-C-0267 EPC045 Civil 6-Oct-16 41
Oct,2016

03
117 IN-HSS-C-0270 EPC045 Civil 6-Oct-16 41
Oct,2016

04
118 IN-HSS-C-0276 EPC045 Civil 8-Oct-16 41
Oct,2016

04
119 IN-HSS-C-0279 EPC045 Civil 8-Oct-16 41
Oct,2016

120 IN-HSS-C-0281 EPC045 Civil 42607 9-Oct-16 42

05
121 IN-HSS-C-0283 EPC045 Civil 10-Oct-16 42
Oct,2016

05
122 IN-HSS-C-0285 EPC045 Civil 11-Oct-16 42
Oct,2016

05
123 IN-HSS-C-0287 EPC045 Civil 12-Oct-16 42
Oct,2016
05
124 IN-HSS-C-0289 EPC045 Civil 13-Oct-16 42
Oct,2016

05
125 IN-HSS-C-0291 EPC045 Civil 10-Oct-16 42
Oct,2016

05
126 IN-HSS-C-0293 EPC045 Civil 10-Oct-16 42
Oct,2016

06
127 IN-HSS-C-0295 EPC045 Civil 11-Oct-16 42
Oct,2016

08
128 IN-HSS-C-0298 EPC045 Civil 12-Oct-16 42
Oct,2016

08
129 IN-HSS-C-0301 EPC045 Civil 12-Oct-16 42
Oct,2016

08
130 IN-HSS-C-0304 EPC045 Civil 13-Oct-16 42
Oct,2016

11
131 IN-HSS-C-0309 EPC045 Civil 15-Oct-16 42
Oct,2016

12
132 IN-HSS-C-0312 EPC045 Civil 15-Oct-16 42
Oct,2016

13
133 IN-HSS-C-0317 EPC045 Civil 17-Oct-16 43
Oct,2016

13
134 IN-HSS-C-0319 EPC045 Civil 16-Oct-16 43
Oct,2016

13
135 IN-HSS-C-0321 EPC045 Civil 19-Oct-16 43
Oct,2016

13
136 IN-HSS-C-0323 EPC045 Civil 20-Oct-16 43
Oct,2016

13
137 IN-HSS-C-0325 EPC045 Civil 16-Oct-16 43
Oct,2016
13
138 IN-HSS-C-0327 EPC045 Civil 16-Oct-16 43
Oct,2016

13
139 IN-HSS-C-0330 EPC045 Civil 17-Oct-16 43
Oct,2016

15
140 IN-HSS-C-0334 EPC045 Civil 18-Oct-16 43
Oct,2016

15
141 IN-HSS-C-0337 EPC045 Civil 19-Oct-16 43
Oct,2016

15
142 IN-HSS-C-0340 EPC045 Civil 20-Oct-16 43
Oct,2016

17
143 IN-HSS-C-0347 EPC045 Civil 22-Oct-16 43
Oct,2016

19
144 IN-HSS-C-0352 EPC045 Civil 23-Oct-16 44
Oct,2016

19
145 IN-HSS-C-0355 EPC045 Civil 24-Oct-16 44
Oct,2016

20
146 IN-HSS-C-0361 EPC045 Civil 22-Oct-16 43
Oct,2016

20
147 IN-HSS-C-0364 EPC045 Civil 24-Oct-16 44
Oct,2016

20
148 IN-HSS-C-0366 EPC045 Civil 25-Oct-16 44
Oct,2016

20
149 IN-HSS-C-0368 EPC045 Civil 25-Oct-16 44
Oct,2016

20
150 IN-HSS-C-0371 EPC045 Civil 25-Oct-16 44
Oct,2016

20
151 IN-HSS-C-0373 EPC045 Civil 26-Oct-16 44
Oct,2016
23
152 IN-HSS-C-0377 EPC045 Civil 26-Oct-16 44
Oct,2016

23
153 IN-HSS-C-0381 EPC045 Civil 27-Oct-16 44
Oct,2016

24
154 IN-HSS-C-0384 EPC045 Civil 27-Oct-16 44
Oct,2016

24
155 IN-HSS-C-0387 EPC045 Civil 29-Oct-16 44
Oct,2016

25
156 IN-HSS-C-0389 EPC045 Civil 29-Oct-16 44
Oct,2016

25
157 IN-HSS-C-0392 EPC045 Civil 31-Oct-16 45
Oct,2016

27
158 IN-HSS-C-0398 EPC045 Civil 29-Oct-16 44
Oct,2016

27
159 IN-HSS-C-0402 EPC045 Civil 31-Oct-16 45
Oct,2016

27
160 IN-HSS-C-0404 EPC045 Civil 1-Nov-16 45
Oct,2016

27
161 IN-HSS-C-0406 EPC045 Civil 1-Nov-16 45
Oct,2016

29
162 IN-HSS-C-0410 EPC045 Civil 1-Nov-16 45
Oct,2016

29
163 IN-HSS-C-0414 EPC045 Civil 2-Nov-16 45
Oct,2016

30
164 IN-HSS-C-0418 EPC045 Civil 2-Nov-16 45
Oct,2016

30
165 IN-HSS-C-0422 EPC045 Civil 3-Nov-16 45
Oct,2016
31
166 IN-HSS-C-0425 EPC045 Civil 3-Nov-16 45
Oct,2016

31
167 IN-HSS-C-0429 EPC045 Civil 5-Nov-16 45
Oct,2016

1
168 IN-HSS-C-0431 EPC045 Civil 5-Nov-16 45
Nov,2016

1
169 IN-HSS-C-0435 EPC045 Civil 6-Nov-16 46
Nov,2016

2
170 IN-HSS-C-0436 EPC045 Civil 6-Nov-16 46
Nov,2016

2
171 IN-HSS-C-0438 EPC045 Civil 6-Nov-16 46
Nov,2016

2
172 IN-HSS-C-0442 EPC045 Civil 7-Nov-16 46
Nov,2016

5
173 IN-HSS-C-0446 EPC045 Civil 7-Nov-16 46
Nov,2016

5
174 IN-HSS-C-0450 EPC045 Civil 8-Nov-16 46
Nov,2016

5
175 IN-HSS-C-0452 EPC045 Civil 8-Nov-16 46
Nov,2016

5
176 IN-HSS-C-0456 EPC045 Civil 9-Nov-16 46
Nov,2016

6
177 IN-HSS-C-0460 EPC045 Civil 9-Nov-16 46
Nov,2016

6
178 IN-HSS-C-0464 EPC045 Civil 10-Nov-16 46
Nov,2016

7
179 IN-HSS-C-0468 EPC045 Civil 10-Nov-16 46
Nov,2016
7
180 IN-HSS-C-0472 EPC045 Civil 12-Nov-16 46
Nov,2016

9
181 IN-HSS-C-0477 EPC045 Civil 12-Nov-16 46
Nov,2016

9
182 IN-HSS-C-0481 EPC045 Civil 13-Nov-16 47
Nov,2016

10
183 IN-HSS-C-0485 EPC045 Civil 13-Nov-16 47
Nov,2016

10
184 IN-HSS-C-0489 EPC045 Civil 14-Nov-16 47
Nov,2016

10
185 IN-HSS-C-0491 EPC045 Civil 14-Nov-16 47
Nov,2016

10
186 IN-HSS-C-0495 EPC045 Civil 15-Nov-16 47
Nov,2016

12
187 IN-HSS-C-0501 EPC045 Civil 15-Nov-16 47
Nov,2016

12
188 IN-HSS-C-0505 EPC045 Civil 16-Nov-16 47
Nov,2016

13
189 IN-HSS-C-0507 EPC045 Civil 16-Nov-16 47
Nov,2016

13
190 IN-HSS-C-0511 EPC045 Civil 17-Nov-16 47
Nov,2016

14
191 IN-HSS-C-0515 EPC045 Civil 17-Nov-16 47
Nov,2016

14
192 IN-HSS-C-0519 EPC045 Civil 19-Nov-16 47
Nov,2016

15
193 IN-HSS-C-0523 EPC045 Civil 19-Nov-16 47
Nov,2016
15
194 IN-HSS-C-0527 EPC045 Civil 20-Nov-16 48
Nov,2016

16
195 IN-HSS-C-0531 EPC045 Civil 20-Nov-16 48
Nov,2016

16
196 IN-HSS-C-0535 EPC045 Civil 21-Nov-16 48
Nov,2016

17
197 IN-HSS-C-0540 EPC045 Civil 21-Nov-16 48
Nov,2016

17
198 IN-HSS-C-0544 EPC045 Civil 22-Nov-16 48
Nov,2016

17
199 IN-HSS-C-0545 EPC045 Civil 22-Nov-16 48
Nov,2016

19
200 IN-HSS-C-0548 EPC045 Civil 23-Nov-16 48
Nov,2016

20
201 IN-HSS-C-0555 EPC045 Civil 24-Nov-16 48
Nov,2016

21
202 IN-HSS-C-0565 EPC045 Civil 27-Nov-16 49
Nov,2016

23
203 IN-HSS-C-0580 EPC045 Civil 26-Nov-16 48
Nov,2016

204 IN-HSS-C-0585 EPC045 Civil 42697 28-Nov-16 49

205 IN-HSS-C-0587 EPC045 Civil 42697 28-Nov-16 49

206 IN-HSS-C-0592 EPC045 Civil 42698 28-Nov-16 49

207 IN-HSS-C-0596 EPC045 Civil 42698 27-Nov-16 49


208 IN-HSS-C-0600 EPC045 Civil 42700 29-Nov-16 49

209 IN-HSS-C-0601 EPC045 Civil 42700 29-Nov-16 49

26
210 IN-HSS-C-0603 EPC045 Civil 29-Nov-16 49
Nov,2016

26
211 IN-HSS-C-0607 EPC045 Civil 30-Nov-16 49
Nov,2016

27
212 IN-HSS-C-0612 EPC045 Civil 30-Nov-16 49
Nov,2016

27
213 IN-HSS-C-0616 EPC045 Civil 1-Dec-16 49
Nov,2016

214 IN-HSS-C-0617 EPC045 Civil 27 Nov,2017 1-Dec-16 49

28
215 IN-HSS-C-0620 EPC045 Civil 3-Dec-16 49
Nov ,2016

28
216 IN-HSS-C-0624 EPC045 Civil 30-Nov-16 49
Nov,2016

28
217 IN-HSS-C-0626 EPC045 Civil 1-Dec-16 49
Nov,2016

28
218 IN-HSS-C-0628 EPC045 Civil 3-Dec-16 49
Nov,2016

219 IN-HSS-C-0630 EPC045 Civil 28 Nov,2016 3-Dec-16 49

29
220 IN-HSS-C-0632 EPC045 Civil 4-Dec-16 50
Nov,2016

29
221 IN-HSS-C-0635 EPC045 Civil 3-Dec-16 49
Nov,2016
30
222 IN-HSS-C-0639 EPC045 Civil 5-Dec-16 50
Nov,2016

04
223 IN-HSS-C-0643 EPC045 Civil 4-Dec-16 50
Dec,2016

01
224 IN-HSS-C-0647 EPC045 Civil 6-Dec-16 50
Dec,2016

01
225 IN-HSS-C-0651 EPC045 Civil 6-Dec-16 50
Dec,2016

05
226 IN-HSS-C-0655 EPC045 Civil 7-Dec-16 50
Dec,2016

03
227 IN-HSS-C-0659 EPC045 Civil 6-Dec-16 50
Dec,2016

06
228 IN-HSS-C-0661 EPC045 Civil 8-Dec-16 50
Dec,2016

03
229 IN-HSS-C-0665 EPC045 Civil 7-Dec-16 50
Dec,2016

04
230 IN-HSS-C-0669 EPC045 Civil 10-Dec-16 50
Dec,2016

07
231 IN-HSS-C-0674 EPC045 Civil 10-Dec-16 50
Dec,2016

06
232 IN-HSS-C-0675 EPC045 Civil 10-Dec-16 50
Dec,2017

06
233 IN-HSS-C-0678 EPC045 Civil 11-Dec-16 51
Dec,2016

07
234 IN-HSS-C-0682 EPC045 Civil 11-Dec-16 51
Dec,2016

07
235 IN-HSS-C-0686 EPC045 Civil 12-Dec-16 51
Dec,2016
10
236 IN-HSS-C-0690 EPC045 Civil 12-Dec-16 51
Dec,2016

237 IN-HSS-C-0692 EPC045 Civil 9 Dec, 2016 12-Dec-16 51

08
238 IN-HSS-C-0697 EPC045 Civil 13-Dec-16 51
Dec,2016

08
239 IN-HSS-C-0701 EPC045 Civil 13-Dec-16 51
Dec,2016

08
240 IN-HSS-C-0704 EPC045 Civil 14-Dec-16 51
Dec,2016

10
241 IN-HSS-C-0708 EPC045 Civil 14-Dec-16 51
Dec,2016

11
242 IN-HSS-C-0711 EPC045 Civil 15-Dec-16 51
Dec,2016

11
243 IN-HSS-C-0715 EPC045 Civil 15-Dec-16 51
Dec,2016

12
244 IN-HSS-C-0718 EPC045 Civil 16-Dec-16 51
Dec,2016

12
245 IN-HSS-C-0722 EPC045 Civil 14-Dec-16 51
Dec,2016

246 IN-HSS-C-0723 EPC045 Civil 12 Dec, 2016 15-Dec-16 51

247 IN-HSS-C-0725 EPC045 Civil 12 Dec, 2016 13-Dec-16 51

248 IN-HSS-C-0727 EPC045 Civil 12 Dec,2016 14-Dec-16 51

249 IN-HSS-C-0729 EPC045 Civil 12 Dec,2016 15-Dec-16 51


250 IN-HSS-C-0730 EPC045 Civil 12 Dec,2016 15-Dec-16 51

14
251 IN-HSS-C-0733 EPC045 Civil 14-Dec-16 51
Dec,2016

13
252 IN-HSS-C-0735 EPC045 Civil 18-Dec-16 52
Dec,2016

14
253 IN-HSS-C-0738 EPC045 Civil 17-Dec-16 51
Dec,2016

14
254 IN-HSS-C-0742 EPC045 Civil 19-Dec-16 52
Dec,2016

15
255 IN-HSS-C-0744 EPC045 Civil 18-Dec-16 52
Dec,2016

15
256 IN-HSS-C-0748 EPC045 Civil 18-Dec-16 52
Dec,2016

257 IN-HSS-C-0750 EPC045 Civil 15-Dec-16 14-Dec-16 51

258 IN-HSS-C-0752 EPC045 Civil 18-Dec-16 13-Dec-16 51

259 IN-HSS-C-0753 EPC045 Civil 17-Dec-16 20-Dec-16 52

260 IN-HSS-C-0754 EPC045 Civil 17-Dec-16 20-Dec-16 52

261 IN-HSS-C-0758 EPC045 Civil 17-Dec-16 20-Dec-16 52

262 IN-HSS-C-0762 EPC045 Civil 17-Dec-16 21-Dec-16 52

263 IN-HSS-C-0765 EPC045 Civil 18-Dec-16 20-Dec-16 52


264 IN-HSS-C-0769 EPC045 Civil 18-Dec-16 22-Dec-16 52

265 IN-HSS-C-0772 EPC045 Civil 19-Dec-16 22-Dec-16 52

266 IN-HSS-C-0776 EPC045 Civil 19-Dec-16 24-Dec-16 52

267 IN-HSS-C-0779 EPC045 Civil 20-Dec-16 24-Dec-16 52

268 IN-HSS-C-0783 EPC045 Civil 21-Dec-16 21-Dec-16 52

269 IN-HSS-C-0785 EPC045 Civil 20-Dec-16 24-Dec-16 52

270 IN-HSS-C-0786 EPC045 Civil 20-Dec-16 24-Dec-16 52

271 IN-HSS-C-0791 EPC045 Civil 21-Dec-16 25-Dec-16 53

272 IN-HSS-C-0795 EPC045 Civil 21-Dec-16 25-Dec-16 53

273 IN-HSS-C-0798 EPC045 Civil 22-Dec-16 24-Dec-16 52

274 IN-HSS-C-0802 EPC045 Civil 22-Dec-16 24-Dec-16 52

275 IN-HSS-C-0804 EPC045 Civil 22-Dec-16 26-Dec-16 53

276 IN-HSS-C-0805 EPC045 Civil 22-Dec-16 26-Dec-16 53

277 IN-HSS-C-0810 EPC045 Civil 24DEC216 29-Dec-16 53


278 IN-HSS-C-0814 EPC045 Civil 28-Dec-16 27-Dec-16 53

279 IN-HSS-C-0818 EPC045 Civil 25-Dec-16 27-Dec-16 53

280 IN-HSS-C-0822 EPC045 Civil 25-Dec-16 27-Dec-16 53

281 IN-HSS-C-0828 EPC045 Civil 26-Dec-16 28-Dec-16 53

282 IN-HSS-C-0829 EPC045 Civil 26-Dec-16 28-Dec-16 53

283 IN-HSS-C-0832 EPC045 Civil 27-Dec-16 28-Dec-16 53

284 IN-HSS-C-0836 EPC045 Civil 27-Dec-16 29-Dec-16 53

285 IN-HSS-C-0838 EPC045 Civil 27-Dec-16 29-Dec-16 53

286 IN-HSS-C-0839 EPC045 Civil 27-Dec-16 31-Dec-16 53

287 IN-HSS-C-0842 EPC045 Civil 28-Dec-16 31-Dec-16 53

288 IN-HSS-C-0844 EPC045 Civil 28-Dec-16 31-Dec-16 53

289 IN-HSS-C-0845 EPC045 Civil 28-Dec-16 31-Dec-16 53

290 IN-HSS-C-0848 EPC045 Civil 29-Dec-16 31-Dec-16 53

291 IN-HSS-C-0852 EPC045 Civil 29-Dec-16 2-Jan-17 1


292 IN-HSS-C-0855 EPC045 Civil 29-Dec-16 31-Dec-16 53

293 IN-HSS-C-0859 EPC045 Civil 29-Dec-16 2-Jan-17 1

294 IN-HSS-C-0862 EPC045 Civil 29-Dec-16 2-Jan-17 1

295 IN-HSS-C-0868 EPC045 Civil 31-Dec-16 3-Jan-17 1

296 IN-HSS-C-0872 EPC045 Civil 31-Dec-16 3-Jan-17 1

297 IN-HSS-C-0874 EPC045 Civil 31-Dec-16 4-Jan-17 1

298 IN-HSS-C-0878 EPC045 Civil 31-Dec-16 4-Jan-17 1

299 IN-HSS-C-0880 EPC045 Civil 2-Jan-17 5-Jan-17 1

300 IN-HSS-C-0884 EPC045 Civil 2-Jan-17 3-Jan-17 1

301 IN-HSS-C-0885 EPC045 Civil 2-Jan-17 3-Jan-17 1

302 IN-HSS-C-0886 EPC045 Civil 2-Jan-17 5-Jan-17 1

303 IN-HSS-C-0887 EPC045 Civil 2-Jan-17 5-Jan-17 1

304 IN-HSS-C-0892 EPC045 Civil 3-Jan-17 7-Jan-17 1

305 IN-HSS-C-0896 EPC045 Civil 3-Jan-17 7-Jan-17 1


306 IN-HSS-C-0898 EPC045 Civil 3-Jan-17 8-Jan-17 2

307 IN-HSS-C-0902 EPC045 Civil 3-Jan-17 5-Jan-17 1

308 IN-HSS-C-0903 EPC045 Civil 3-Jan-17 9-Jan-17 2

309 IN-HSS-C-0904 EPC045 Civil 3-Jan-17 9-Jan-17 2

310 IN-HSS-C-0907 EPC045 Civil 4-Jan-17 9-Jan-17 2

311 IN-HSS-C-0910 EPC045 Civil 4-Jan-17 7-Jan-17 1

312 IN-HSS-C-0918 EPC045 Civil 4-Jan-17 10-Jan-17 2

313 IN-HSS-C-0921 EPC045 Civil 7-Jan-17 10-Jan-17 2

314 IN-HSS-C-0923 EPC045 Civil 8-Jan-17 11-Jan-17 2

315 IN-HSS-C-0927 EPC045 Civil 8-Jan-17 7-Jan-17 1

316 IN-HSS-C-0930 EPC045 Civil 5-Jan-17 11-Jan-17 2

317 IN-HSS-C-0933 EPC045 Civil 8-Jan-17 12-Jan-17 2

318 IN-HSS-C-0937 EPC045 Civil 8-Jan-17 10-Jan-17 2

319 IN-HSS-C-0943 EPC045 Civil 8-Jan-17 12-Jan-17 2


320 IN-HSS-C-0944 EPC045 Civil 8-Jan-17 12-Jan-17 2

321 IN-HSS-C-0949 EPC045 Civil 9-Jan-17 14-Jan-17 2

322 IN-HSS-C-0958 EPC045 Civil 11-Jan-17 14-Jan-17 2

323 IN-HSS-C-0960 EPC045 Civil 11-Jan-17 15-Jan-17 3

324 IN-HSS-C-0963 EPC045 Civil 12-Jan-17 15-Jan-17 3

325 IN-HSS-C-0965 EPC045 Civil 12-Jan-17 16-Jan-17 3

326 IN-HSS-C-0975 EPC045 Civil 12-Jan-17 16-Jan-17 3

327 IN-HSS-C-0977 EPC045 Civil 12-Jan-17 16-Jan-17 3

328 IN-HSS-C-0979 EPC045 Civil 12-Jan-17 17-Jan-17 3

329 IN-HSS-C-0980 EPC045 Civil 12-Jan-17 17-Jan-17 3

330 IN-HSS-C-0983 EPC045 Civil 14-Jan-17 17-Jan-17 3

331 IN-HSS-C-0985 EPC045 Civil 14-Jan-17 18-Jan-17 3

332 IN-HSS-C-0988 EPC045 Civil 14-Jan-17 18-Jan-17 3

333 IN-HSS-C-0990 EPC045 Civil 14-Jan-17 19-Jan-17 3


334 IN-HSS-C-0993 EPC045 Civil 14-Jan-17 19-Jan-17 3

335 IN-HSS-C-0995 EPC045 Civil 14-Jan-17 20-Jan-17 3

336 IN-HSS-C-0998 EPC045 Civil 14-Jan-17 21-Jan-17 3

337 IN-HSS-C-1000 EPC045 Civil 14-Jan-17 21-Jan-17 3

338 IN-HSS-C-1003 EPC045 Civil 15-Jan-17 21-Jan-17 3

339 IN-HSS-C-1005 EPC045 Civil 15-Jan-17 17-Jan-17 3

340 IN-HSS-C-1016 EPC045 Civil 16-Jan-17 22-Jan-17 4

341 IN-HSS-C-1018 EPC045 Civil 15-Jan-17 23-Jan-17 4

342 IN-HSS-C-1020 EPC045 Civil 16-Jan-17 23-Jan-17 4

343 IN-HSS-C-1022 EPC045 Civil 16-Jan-17 23-Jan-17 4

344 IN-HSS-C-1025 EPC045 Civil 16-Jan-17 24-Jan-17 4

345 IN-HSS-C-1027 EPC045 Civil 16-Jan-17 24-Jan-17 4

346 IN-HSS-C-1030 EPC045 Civil 16-Jan-17 25-Jan-17 4

347 IN-HSS-C-1032 EPC045 Civil 16-Jan-17 25-Jan-17 4


348 IN-HSS-C-1044 EPC045 Civil 1/182017 26-Jan-17 4

349 IN-HSS-C-1046 EPC045 Civil 18-Jan-17 19-Jan-17 3

350 IN-HSS-C-1048 EPC045 Civil 17-Jan-17 21-Jan-17 3

351 IN-HSS-C-1049 EPC045 Civil 17-Jan-17 26-Jan-17 4

352 IN-HSS-C-1050 EPC045 Civil 18-Jan-17 28-Jan-17 4

353 IN-HSS-C-1057 EPC045 Civil 21-Jan-17 28-Jan-17 4

354 IN-HSS-C-1059 EPC045 Civil 21-Jan-17 23-Jan-17 4

355 IN-HSS-C-1061 EPC045 Civil 21-Jan-17 23-Jan-17 4

356 IN-HSS-C-1064 EPC045 Civil 22-Jan-17 28-Jan-17 4

357 IN-HSS-C-1066 EPC045 Civil 22-Jan-17 29-Jan-17 5

358 IN-HSS-ME-007 EPC045 Mechanical 19-Jan-17 23-Jan-17

359 IN-HSS-ME-010 EPC045 Mechanical 25-Jan-17 26-Jan-17 4

360 IN-HSS-ME-011 EPC045 Mechanical 26-Jan-17 29-Jan-17 5


ection Notification Status (PMC) - EPC 045 - H

ITP
Month Year Location Shop/Field
Intervention

Jul 2016 Laboratory W SHOP

Jul 2016 43A YARD W SHOP

Jul 2016 43A YARD W SHOP

Jul 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP


Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP


Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W shop

Aug 2016 43A YARD W shop

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP


Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Aug 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD SHOP


Sep 2016 43A YARD WS SHOP

Sep 2016 43A YARD WS SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

15.9.2016 #VALUE! 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP


Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

Sep 2016 43A YARD W SHOP

43A SHEAR KEY


Sep 2016 W SHOP
Precast Yard

43A SHEAR KEY


Sep 2016 W SHOP
Precast Yard

43A CORE-LOC
Sep 2016 W SHOP
Precast Yard

43A CORE-LOC
Sep 2016 W SHOP
Precast Yard

Sep 2016 43A Precast Yard W SHOP

43A SHEAR KEY


Sep 2016 W SHOP
Precast Yard

43A
Sep 2016 W SHOP
Precast Yard
43A CORE-LOC
Sep 2016 W SHOP
Precast Yard

43A CORE-LOC
Sep 2016 W SHOP
Precast Yard

43A CORE-LOC
Sep 2016 W SHOP
Precast Yard

43A CORE-LOC
Sep 2016 W SHOP
Precast Yard

43A CORE-LOC
Sep 2016 W SHOP
Precast Yard

43A
Sep 2016 W SHOP
Precast Yard

43A CORE-LOC
Sep 2016 W SHOP
Precast Yard

Sep 2016 43A Precast Yard W SHOP

Sep 2016 43A Precast Yard W SHOP

43A
Sep 2016 W SHOP
Precast Yard

43A
Sep 2016 W SHOP
Precast Yard

43A
Sep 2016 W SHOP
Precast Yard

43A
Sep 2016 W SHOP
Precast Yard

43A CORE-LOC
Sep 2016 W SHOP
Precast Yard
43A CORE-LOC
Sep 2016 W SHOP
Precast Yard

43A CORE-LOC
Sep 2016 W SHOP
Precast Yard

43A CORE-LOC
Sep 2016 W SHOP
Precast Yard

Sep 2016 43A Precast Yard W SHOP

Sep 2016 43A Precast Yard W SHOP

43A
Sep 2016 W SHOP
Precast Yard

43A
Sep 2016 W SHOP
Precast Yard

43A
Oct 2016 W SHOP
Precast Yard

43A
Oct 2016 W SHOP
Precast Yard

Oct 2016 43A Precast Yard W SHOP

Oct 2016 43A Precast Yard

Oct 2016 43A Precast Yard W SHOP

Oct 2016 43A Precast Yard

Oct 2016 43A Precast Yard W SHOP


Oct 2016 43A Precast Yard W SHOP

Oct 2016 43A Precast Yard W SHOP

43A
Oct 2016 W SHOP
Precast Yard

43A
Oct 2016 W SHOP
Precast Yard

43A
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

ACICO Remicon
Laboratory &
Oct 2016 W SHOP
Concrete Batch
Plant

Oct 2016 43A Precast Yard W SHOP

Oct 2016 43A Precast Yard W SHOP

Oct 2016 43A Precast Yard W SHOP


Oct 2016 43A Precast Yard W SHOP

Oct 2016 43A Precast Yard W SHOP

Oct 2016 43A Precast Yard W SHOP

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

Oct 2016 43A Precast Yard W SHOP

Oct 2016 43A Precast Yard W SHOP

Oct 2016 43A Precast Yard W SHOP

Oct 2016 43A Precast Yard W SHOP

Oct 2016 43A Precast Yard W SHOP


Oct 2016 43A Precast Yard W SHOP

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

Oct 2016 43A Precast Yard W SHOP

Oct 2016 43A Precast Yard W SHOP

Oct 2016 43A Precast Yard W SHOP

Oct 2016 43A Precast Yard W SHOP

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard
43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

Oct 2016 43A Precast Yard W SHOP

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

Oct 2016 43A Precast Yard W SHOP

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

43A CORE-LOC
Oct 2016 W SHOP
Precast Yard

Oct 2016 43A Precast Yard W SHOP

Nov 2016 43A Precast Yard W SHOP

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP


43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard
Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard
Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

Mina Al-Zour Acico


Nov 2016 Baching plant W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP


Unit 98 Revetment
Nov 2016 W SHOP
CH- 020 CH-160

Unit 98 Revetment
Nov 2016 W SHOP
CH- 020 CH-160

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

43A CORE-LOC
Nov 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

Dec 2016 HSS-JV Site Store W SHOP

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Nov 2016 43A Precast Yard W SHOP

Unit 98 Revetment
Dec 2016 W SHOP
CH- 020 CH-160

Unit 98 Revetment
Dec 2016 W SHOP
CH- 160 CH-300

Unit 98 Revetment
Dec 2016 W SHOP
CH- 160 CH-300

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP


43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

43A Wave Wall


Dec 2016 Shear Key Pre-Cast W SHOP
Yard

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

Dec 2016 43A Precast Yard W SHOP


Dec 2016 43A Precast Yard W SHOP

Unit 98 Revetment
Dec 2016 W SHOP
Area

Dec 2016 43A Precast Yard W SHOP

Dec 2016 43A Precast Yard W SHOP

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

Unit 98 Revetment
Dec 2016 W SHOP
Area

Unit 98 Revetment
Dec 2016 W SHOP
Area

Unit 98 Revetment
Dec 2016 W SHOP
Area

Unit 98 Revetment
Dec 2016 W SHOP
Area
Unit 98 Revetment
Dec 2016 W SHOP
Area

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

Dec 2016 43A Precast Yard W SHOP

Dec 2016 HSS-JV Site Store W SHOP

Unit 98 Revetment
Dec 2016 W SHOP
Area

Unit 98 Revetment
Dec 2016 W SHOP
Area

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard
Dec 2016 43A Precast Yard W SHOP

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

Unit 98 Revetment
Dec 2016 W SHOP
Area

Unit 98 Revetment
Dec 2016 W SHOP
Area

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

Unit 98 Revetment
Dec 2016 W SHOP
Area

Unit 98 Revetment
Dec 2016 W SHOP
Area

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard
43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

Unit 98 Revetment
Dec 2016 W SHOP
Area

Unit 98 Revetment
Dec 2016 W SHOP
Area

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Dec 2016 43A Precast Yard W SHOP

Unit 98 Revetment
Dec 2016 W SHOP
Area

Unit 98 Revetment
Dec 2016 W SHOP
Area

Dec 2016 43A Precast Yard W SHOP

Unit 98 Revetment
Dec 2016 W SHOP
Area

Unit 98 Revetment
Dec 2016 W SHOP
Area

43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP


43A CORE-LOC
Dec 2016 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

Jan 2017 43A Precast Yard W SHOP

Unit 98 Revetment
Jan 2017 W SHOP
Area

Unit 98 Revetment
Jan 2017 W SHOP
Area

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP


43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

Unit 98 Revetment
Jan 2017 W SHOP
Area

Unit 98 Revetment
Jan 2017 W SHOP
Area

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Unit 98 Revetment
Jan 2017 W SHOP
Area

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

Unit 98 Revetment
Jan 2017 W SHOP
Area
Unit 98 Revetment
Jan 2017 W SHOP
Area

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Unit 99 Revetment
Jan 2017 W SHOP
Area

Unit 98 Revetment
Jan 2017 W SHOP
Area

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard
Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Unit-99 Temporary
Jan 2017 W SHOP
Jetty

Batching Plant
Jan 2017 W SHOP
Barge

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard
Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 43A Precast Yard W SHOP

Jan 2017 43A Precast Yard W SHOP

Unit 99 Revetment
Jan 2017 W SHOP
Area

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Unit 99 Revetment
Jan 2017 W SHOP
Area

Jan 2017 43A Precast Yard W SHOP

43A CORE-LOC
Jan 2017 W SHOP
Precast Yard

Jan 2017 Welding Shop W SHOP

Jan 2017 Welding Shop W SHOP

Jan 2017 Welding Shop W SHOP


PMC) - EPC 045 - HSSJV

Result
Description Assigned To (A/R/P/O)

ACC (With
Concrete Trial Mix M Jayabalan Comments)

1-Embedment Lifting Rope/Hook and


2-Size,Level and Shape of Precast concrete Shear Key (3Nos) M Youness ACC
Shear Key.No:01,02,03 - 36mm Wire Rope

Concrete Sampling and Placing Inspection of C-40-OPC for the Wave M Youness REJ
wall Shear key - 3nos-Shear Key No:01,02,03.
1-Form work
Wave Wall Shear Key 8Nos
2-Embedment Lifting Rope and M Jayabalan ACC
3-Size,Level and Shape of Precast concrete Shear Key (8Nos)
Shear Key.No:04,05,06,07,08,09,10,11
36mm Wire Rope
Concrete Sampling and Placing Inspection of C-40-OPC for the Wave M Jayabalan ACC
wall Shear key - 8nos-Shear Key No:04,05,06,07,08,09,10,11.

1-Form work
Wave Wall Shear Key 8Nos S Bilal CANCELED
2-Size,Level and Shape of Precast concrete Shear Key(8Nos) Shear Key
No:12,13,14,15,16,17,18,19.

Embedment Lifting Rope(16Nos) for Precast concrete Shear Key


Shear Key No:12,13,14,15,16,17,18,19. M Jayabalan ACC
36mm Wire Rope

Concrete Sampling and Placing Inspection of C-40-OPC for the Wave wall Shear key - 8nos
Shear key Tag.No:12,13,14,15,16,17,18,19 M Jayabalan ACC

Embedment Lifting Rope(16Nos) for Precast concrete Shear Key


Tag.No:20 TO 27 M Jayabalan ACC
36mm Wire Rope

Concrete Sampling and Placing Inspection of C-40-OPC for the Wave wall Shear key - 8nos
Shear key Tag.No:20 TO 27 M Jayabalan ACC

Embedment Lifting Rope(6Nos) for Precast concrete Shear Key


Tag.No:28 TO 30 M Jayabalan ACC
22mm Wire Rope
Concrete Sampling and Placing Inspection of C-40-OPC for the Wave wall Shear key - 3nos
Shear key Tag.No:28 TO 30 M Jayabalan ACC

Surface Concrete after Form removal Dimension/Elevation Inspection


Post pour inspection for the Shear Key Tag No:001,002,003 M Jayabalan ACC

Embedment Lifting Rope(6Nos) for Precast concrete Shear Key


Tag.No:31,32,33 M Jayabalan ACC
22mm Wire Rope

Surface Concrete after Form removal Dimension/Elevation Inspection


Post pour inspection for the Shear Key Tag No::004,005,006,007,008,009,010,011 M Jayabalan ACC

Concrete Sampling and Placing Inspection of C-40-OPC for the Wave wall Shear key - 3nos
Shear key Tag.No:31,32,33 CANCELED

Surface Concrete after Form removal and Dimension/Elevation Inspection


Post pour inspection for the Shear Key Tag No:012,013,014,015,016,017,018,019 M Jayabalan ACC

Embedment Lifting Rope(14Nos) for Precast concrete Shear Key


Tag.No:034,035,036,037,038,039,040. M Jayabalan ACC
22mm Wire Rope

Surface Concrete after Form removal and Diamension/Elevation Inspection


Post pour inspection for the Shear Key Tag No::020,021,022,023,024,025,026,027 M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC for the Wave wall Shear key - 10nos Tag.No:31,32,33,34,35,36,37,38,39,40 M Jayabalan ACC

Embedment Lifting Rope(20Nos) for Precast concrete Shear Key M Jayabalan ACC
Tag.No:041,042,043,044,045,046,047,048,049,050.22mm Wire Rope

Concrete Sampling and Placing Inspection


of C-40-OPC for the Wave wall Shear key - 10nos Tag.No:41,42,43,44,45,46,47,48,49,50 M Jayabalan ACC

Surface Concrete after Form removal and Diamension/Elevation Inspection


Post pour inspection for the Shear Key Tag No::028,029,030 M Jayabalan ACC

Embedment Lifting Rope(20Nos) for Precast concrete Shear Key


Tag.No:051,052,053,054,055,056,057,058,059,060.22mm Wire Rope M Jayabalan ACC

Surface Concrete after Form removal and Diamension Inspection


Post pour inspection for the Shear Key Tag ACC (With
M Jayabalan
No::031,032,033,034,035,036,037,038, Comments)
039,040
Concrete Sampling and Placing Inspection
of C-40-OPC for the Wave wall Shear key - 10nos M Jayabalan ACC
Tag.No:51,52,53,54,55,56,57,58,59,60

Embedment Lifting Rope(20Nos) for Precast concrete Shear Key


Tag.No:061,062,063,064,065,066,067,068,069,070.22mm Wire Rope M Jayabalan ACC

Surface Concrete after Form removal and Diamension Inspection ACC (With
Post pour inspection for the Shear Key Tag No::041,042,043,044,045,046,047,048, M Jayabalan
049,050 Comments)

Concrete Sampling and Placing Inspection


of C-40-OPC for the Wave wall Shear key - 10nos Tag.No:61,62,63,64,65,66,67,68,69,70 M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - 3nos Tag.No:0001,0002 M Jayabalan ACC

Embedment Lifting Rope(20Nos) for Precast concrete Shear Key


Tag.No:071,072,073,074,075,076,077,078,079,080.22mm Wire Rope M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC for the Wave wall Shear key - 10nos Tag.No:71,72,73,74,75,76,77,78,79,80 M Jayabalan ACC

Surface Concrete after Form removal and Diamension Inspection ACC (With
Post pour inspection for the Shear Key Tag No::061,062,063,064,065,066,067,068, M Jayabalan
069,060 Comments)

Embedment Lifting Rope(20Nos) for Precast concrete Shear Key


Tag.No:081,082,083,084,085,086,087,088,089,090.22mm Wire Rope M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC for the Wave wall Shear key - 10nos Tag.No:81,82,83,84,85,86,87,88,89,90 M Jayabalan ACC

Concrete Sampling and Placing Inspection ACC (With


BALA
of C-40-OPC+GGBS for the Core Loc - 2nos Tag.No:0003,0004 Comments)

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - 2nos Tag.No:0005,0006 BALA ACC

Surface Concrete after Form removal and Diamension/Elevation Inspection


Post pour inspection for the Shear Key Tag No::061,062,063,064,065,066,067,068, M Jayabalan ACC
069,070

Surface Concrete after Form removal and Diamension/Elevation Inspection


Post pour inspection for the Core Loc M Jayabalan ACC
Tag No::0001 - 0002
Concrete Sampling and Placing Inspection
of C-40-OPC+GGBS for the Core Loc - 2nos Tag.No:0007,0008 and (0009,0010) M Jayabalan ACC

Embedment Lifting Rope(20Nos) for Precast concrete Shear Key


Tag.No:091,092,093,094,095,096,097,098,099,100.22mm Wire Rope M Jayabalan ACC

Surface Concrete after Form removal and Diamension/Elevation Inspection


Post pour inspection for the Shear Key Tag No::071,072,073,074,075,076,077,078, M Jayabalan ACC
079,080

Concrete Sampling and Placing Inspection


of C-40-OPC for the Wave wall Shear key - 10nos Tag.No:91,92,93,94,95,96,97,98,99,100 BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - 2nos Tag.No:0009,0010 and (0007,0008) M Jayabalan ACC

Embedment Lifting Rope(20Nos) for Precast concrete Shear Key


Tag.No:101,102,103,104,105,106,107,108,109,110.22mm Wire Rope M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC for the Wave wall Shear key - 10nos M Jayabalan ACC
Tag.No:101,102,103,104,105,106,107,108,109,110

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - 30nos Tag.No:00011 TO 00040 M Jayabalan ACC

Surface Concrete after Form removal and Diamension/Elevation Inspection


Post pour inspection for the Shear Key Tag No::081,082,083,084,085,086,087,088, M Jayabalan ACC
089,090

Surface Concrete after Form removal and Diamension/Elevation Inspection


Post pour inspection FOR CORE LOC Tag-00003,00004 M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - 30nos Tag.No:00041 TO 00070 M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - 30nos Tag.No:00071 TO 00100 M Jayabalan ACC

Embedment Lifting Rope(20Nos) for Precast concrete Shear Key


Tag.No:111,112,113,114,115,116,117,118, M Jayabalan ACC
119,120.22mm Wire Rope

Concrete Sampling and Placing Inspection


of C-40-OPC for the Wave wall Shear key - 10nos Tag.No:111,112,113,114,115,116,117,118,119, M Jayabalan ACC
120
Surface Concrete after Form removal and Diamension/Elevation Inspection ACC (With
Post pour inspection for the Shear Key Tag No::091,092,093,094,095,096,097,098, M Jayabalan
099,100 Comments)

Surface Concrete after Form removal and Dimension/Elevation Inspection


Post pour inspection FOR CORE LOC Tag-00005,00006 M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - 30nos M Jayabalan ACC
CORE LOCTag.No:00101 TO 00130

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - 30nos M Jayabalan ACC
CORE LOC Tag.No:00131 TO 00160

Surface Concrete after Form removal and Diamension/Elevation Inspection


Post pour inspection for the Shear Key Tag No::101,102,103,104,105,106,107,108, M Jayabalan ACC
109,110

Surface Concrete after Form removal and Diamension/Elevation Inspection


Post pour inspection FOR CORE LOC Tag-00007,00008,00009,00010 M Jayabalan ACC

Surface Concrete after Form removal and Diamension/Elevation Inspection


Post pour inspection FOR CORE LOC M Jayabalan ACC
Tag-00011 TO 000040

Embedment Lifting Rope(20Nos) for Precast concrete Shear Key


Tag.No:121,122,123,124,125,126,127,128, M Jayabalan ACC
129,130.22mm Wire Rope

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - 40nos BALA ACC
CORE LOC Tag.No:00161 TO 00200

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - 40nos BALA ACC
CORE LOC Tag.No:00201 TO 00240

Concrete Sampling and Placing Inspection


of C-40-OPC for the Wave wall Shear key - 10nos Tag.No:121,122,123,124,125,126,127,128,129, BALA ACC
130

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - 40nos BALA ACC
CORE LOC Tag.No:00241 TO 00280

Surface Concrete after Form removal and Diamension/Elevation Inspection


Post pour inspection FOR CORE LOC M Jayabalan ACC
Tag-00041 TO 000070

Surface Concrete after Form removal and Diamension/Elevation Inspection


Post pour inspection FOR CORE LOC M Jayabalan ACC
Tag-00071 TO 000100
Surface Concrete after Form removal and Diamension/Elevation Inspection
Post pour inspection for the Shear Key Tag No::111,112,113,114,115,116,117,118, M Jayabalan ACC
119,120

Surface Concrete after Form removal and Diamension/Elevation Inspection


Post pour inspection FOR CORE LOC M Jayabalan ACC
Tag-00101 TO 000130

Surface Concrete after Form removal and Diamension/Elevation Inspection


Post pour inspection FOR CORE LOC M Jayabalan ACC
Tag-00131 TO 000160

Embedment Lifting Rope(20Nos) for Precast concrete Shear Key


Tag.No:131,132,133,134,135,136,137,138, M Jayabalan ACC
139,140.22mm Wire Rope

Concrete Sampling and Placing Inspection


of C-40-OPC for the Wave wall Shear key - 10nos Tag.No:131,132,133,134,135,136,137,138,139, BALA ACC
140

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - 40nos BALA ACC
CORE LOC Tag.No:00281 TO 00340

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - 40nos BALA ACC
CORE LOC Tag.No:00341 TO 00405

Embedment Lifting Rope(20Nos) for Precast concrete Shear Key


Tag.No:141-150. M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC for the Wave wall Shear key - 10nos Tag.No:141-150. M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (65 Nos) - Tag no.00406 TO 00470. M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.00471 TO 00565. M Jayabalan ACC

Embedment Lifting Rope(20Nos) for Precast concrete Shear Key


Tag.No:141-150. M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC for the Wave wall Shear key - 10nos Tag.No:151-160. M Jayabalan ACC

Surface Concrete after Form removal Tag-00121 TO 00130 Diamension/Elevation Inspection


Tag-00121 TO 00130 M Jayabalan ACC
Surface Concrete after Form removal Tag-00161 TO 00200. Diamension/Elevation Inspection
Tag-00161 TO 00200 M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.00566 TO 00660. M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.00661 TO 00755. M Jayabalan ACC

Surface Concrete after Form removal Tag-00201 TO 00240. Diamension/Elevation Inspection M Jayabalan ACC
Tag-00201 TO 00240.

Surface Concrete after Form removal Tag-Tag - 00241 TO 00280. Diamension/Elevation


Inspection M Jayabalan ACC
Tag - 00241 TO 00280.

Surface Concrete after Form removal Tag-Tag - 00131 TO 00140. Diamension/Elevation


Inspection M Jayabalan ACC
Tag - 00131 TO 00140.

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.00756 TO 00850. BALA ACC

Embedment Lifting Rope(20Nos) for Precast concrete Shear Key


Tag.No:161-170. M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC for the Wave wall Shear key - 10nos Tag.No:161-170. BALA ACC

Surface Concrete after Form removal Tag-Tag - 00281 TO 00340. Diamension/Elevation


Inspection M Jayabalan ACC
Tag - 00281 TO 00340.

Surface Concrete after Form removal Tag-Tag - 00341 TO 00405. Diamension/Elevation


Inspection M Jayabalan ACC
Tag - 00341 TO 00405.

Surface Concrete after Form removal Tag-Tag - 00406 TO 00470. Diamension/Elevation


Inspection M Jayabalan ACC
Tag - 00406 TO 00470.

Surface Concrete after Form removal Tag-Tag - 00141 to 00150. Diamension/Elevation


Inspection M Jayabalan ACC
Tag - 00141 to 00150.

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.851-945. M Jayabalan ACC
Concrete Sampling and Placing Inspection
of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.946-1040. M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.1041-1135. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.1136-1230. BALA ACC

Embedment Lifting Rope(20Nos) for Precast concrete Shear Key


Tag.No:171-180. M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC for the Core Loc - (10 Nos) - Tag no.171-180. BALA ACC

Surface Concrete after Form removal Tag-Tag - 00471 - 00565. Diamension/Elevation


Inspection M Jayabalan ACC
Tag - 00471 - 00565.

Surface Concrete after Form removal Tag-Tag - 151 - 160. Diamension/Elevation Inspection
Tag - 151 - 160. M Jayabalan ACC

Surface Concrete after Form removal Tag-Tag - 00566-00660.. Diamension/Elevation Inspection


Tag - 00566-00660.. M Jayabalan ACC

Surface Concrete after Form removal Tag-Tag - 00661-00755. Diamension/Elevation Inspection


Tag - 00661-00755. M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.1231-1325. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.1326-1420.. M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.1421-1515. M Jayabalan ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.1516-1610.. BALA ACC

Embedment Lifting Rope(30Nos) for Precast concrete Shear Key


Tag.No .181-195. M Jayabalan ACC
Concrete Sampling and Placing Inspection
of C-40-OPC for the Wave wall shear key - (15 Nos) - Tag no.181-195. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.1611-1705. BALA ACC

Surface Concrete after Form removal Tag-Tag - 00756-00850. Diamension/Elevation Inspection


Tag - 00756-00850. M Jayabalan ACC

Surface Concrete after Form removal Tag-Tag - 00161-170. Diamension/Elevation Inspection


Tag - 00161-170. M Jayabalan ACC

Surface Concrete after Form removal Tag-Tag - 00851-00945. Diamension/Elevation Inspection


Tag - 00851-00945. M Jayabalan ACC

Surface Concrete after Form removal Tag-Tag - 00946-01040. Diamension/Elevation Inspection


Tag - 00946-01040. M Jayabalan ACC

Surface Concrete after Form removal Tag-Tag - 01041-01135.. Diamension/Elevation Inspection


Tag - 01041-01135.. M Jayabalan ACC

Surface Concrete after Form removal Tag-Tag - 01136-1230. Diamension/Elevation Inspection


Tag - 01136-1230. M Jayabalan ACC

Surface Concrete after Form removal Tag-Tag - 0171-180. Diamension/Elevation Inspection


Tag - 0171-180. M Jayabalan ACC

Surface Concrete after Form removal Tag-Tag - 01231-1325.. Diamension/Elevation Inspection


Tag - 01231-1325. M Jayabalan ACC

Concrete Mix Design 1. Max acid Soluble Chloride ion. 2.Water


absorption & permeable voids in hardened concrete test. 3.Amount of water M Jayabalan ACC
soluble ion penetration into hardened concrete test.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.1706-1800. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.1801-1895. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.1896-1900. BALA ACC
Concrete Sampling and Placing Inspection
of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.1991-2085. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.2086-2180. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.2181-2275. BALA ACC

Surface Concrete after Form removal Tag-Tag - 01326-1420. Diamension/Elevation Inspection


Tag - 01326-1420. M Jayabalan ACC

Surface Concrete after Form removal Tag-Tag - 1421-1515. Diamension/Elevation Inspection


Tag - 1421-1515. M Jayabalan ACC

Surface Concrete after Form removal Tag-Tag - 1516-1610. Diamension/Elevation Inspection


Tag - 1516-1610. BALA ACC

Surface Concrete after Form removal Tag-Tag - 0181-0195. Diamension/Elevation Inspection


Tag - 0181-0195. M Jayabalan ACC

Surface Concrete after Form removal CORE-LOC


Tag -1611-1705. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -1611-1705.

Surface Concrete after Form removal CORE-LOC


Tag -1706-1800. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -1706-1800.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.2276-2370. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.2371-2465. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.2466-2560. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.2561-2655. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.2656-2750. BALA ACC
Concrete Sampling and Placing Inspection
of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.2751-2845. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -1801-1895. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -1801-1895.

Surface Concrete after Form removal CORE-LOC


Tag -1896-1990. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -1896-1990.

Surface Concrete after Form removal CORE-LOC


Tag -1991-2085. Dimension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -1991-2085.

Surface Concrete after Form removal CORE-LOC


Tag -2086-2180. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -2086-2180.

Surface Concrete after Form removal CORE-LOC


Tag -2181-2275. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -2181-2275.

Surface Concrete after Form removal CORE-LOC


Tag -2276-2370. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -2276-2370.

Surface Concrete after Form removal CORE-LOC


Tag -2371-2465. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -2371-2465.

Surface Concrete after Form removal CORE-LOC


Tag -2466-2560. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -2466-2560.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.2846-2940. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.2941-3035. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.3036-3130. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.3131-3225. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -2561-2655. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -2561-2655.
Surface Concrete after Form removal CORE-LOC
Tag -2656-2750. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -2656-2750.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.3226-3320. M Jayabalan ACC

Surface Concrete after Form removal CORE-LOC


Tag -2751-2845. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -2751-2845.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.3321-3415. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -2846-2940. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -2846-2940.

Surface Concrete after Form removal CORE-LOC


Tag -2941-3035. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -2941-3035.

Surface Concrete after Form removal CORE-LOC


Tag -3036-3130. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -3036-3130.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.3416-3510. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.3511-3605. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.3606-3700. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -3131-3225. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -3131-3225.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.3701-3795. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -3226-3320. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -3226-3320.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.3796-3890. BALA ACC
Surface Concrete after Form removal CORE-LOC
Tag -3321-3415. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -3321-3415.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.3891-3985. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -3416-3510. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -3416-3510.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.3986-4080. BALA ACC

Final Inspection for Core-loc installation. Tag No. 614-846 M Jayabalan

Surface Concrete after Form removal CORE-LOC


Tag -3511-3605. Dimension/Elevation Inspection
CORE-LOC BALA ACC
Tag -3511-3605.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.4081-4175. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -3606-3700. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -3606-3700.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.4176-4270. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -3701-3795. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -3701-3795.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.4271-4365. M Jayabalan ACC

Surface Concrete after Form removal CORE-LOC


Tag -3796-3890. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -3796-3890.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.4366-4460. M Jayabalan ACC

Surface Concrete after Form removal CORE-LOC


Tag -3891-3985. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -3891-3985.
Concrete Sampling and Placing Inspection
of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.4461-4555. M Jayabalan ACC

Surface Concrete after Form removal CORE-LOC


Tag -3986-4080. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -3986-4080.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.4556-4650. M Jayabalan ACC

Surface Concrete after Form removal CORE-LOC


Tag -4081-4175. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -4081-4175.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.4651-4745. M Jayabalan ACC

Surface Concrete after Form removal CORE-LOC


Tag -4176-4270. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -4176-4270.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.4746-4840. M Jayabalan ACC

Surface Concrete after Form removal CORE-LOC


Tag -4271-4365. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -4271-4365.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.4841-4935. M Jayabalan ACC

Surface Concrete after Form removal CORE-LOC


Tag -4366-4460. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -4366-4460.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.4936-5030. M Jayabalan ACC

Surface Concrete after Form removal CORE-LOC


Tag -4461-4555. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -4461-4555.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.5031-5125. M Jayabalan ACC

Surface Concrete after Form removal CORE-LOC


Tag -4556-4650. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -4556-4650
Concrete Sampling and Placing Inspection
of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.5126-5220. M Jayabalan ACC

Surface Concrete after Form removal CORE-LOC


Tag -4651-4745. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -4651-4745.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.5221-5315. M Jayabalan ACC

Surface Concrete after Form removal CORE-LOC


Tag -4746-4840. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -4746-4840.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.5316-5410. M Jayabalan ACC

Concrete Trial Mix

Surface Concrete after Form removal CORE-LOC


Tag -4841-4935. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -4841-4935

Surface Concrete after Form removal CORE-LOC


Tag -4936-5030. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -4936-5030.

Surface Concrete after Form removal CORE-LOC


Tag -5316-5410. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -5031-5125

Surface Concrete after Form removal CORE-LOC


Tag -5126-5220. Diamension/Elevation Inspection
CORE-LOC M Jayabalan ACC
Tag -5126-5220.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.5696 -5790 BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.5791 -5885. M Jayabalan ACC

Surface Concrete after Form removal CORE-LOC


Tag -5221 - 5315. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -5221 - 5315

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.5886 - 5980. M Jayabalan ACC
Formwork and Survey Inspection prior to start Blinding (Shear Key Installation area) CH-020 to
CH-060 BALA ACC

Blinding Concrete Pouring for the Shear Key Intsllation form CH-020 to CH-060 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -5031-5125. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -5316-5410

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.5981-6075. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -5411-5505. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -5411-5505.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.6076-6170. BALA ACC

Material Receiving Inspection for Rebar 10MM,12MM,16MM,20MM and 25MM M Jayabalan ACC

Surface Concrete after Form removal CORE-LOC


Tag -5506-5600. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -5506-5600

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.6171-6265. BALA ACC

Top Elevation and Location (Survey) prior to start the shear key Installation From CH -020 to 160 BALA ACC

Formwork and Survey Inspection prior to start the shear key Installation From CH- 160 CH-300 BALA ACC

Top Elevation and Location (Survey) prior to start the shear key Installation From CH -160 to 300 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -5601-5695. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -5601-5695

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.6266-6360. BALA ACC
Surface Concrete after Form removal CORE-LOC
Tag -5696-5790. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -5696-5790

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.6361-6455. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -5791-5885. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -5791-5885

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.5221-5315. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -5886-5980. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -5886-5980

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.6551-6645. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -5981-6075. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -5981-6075

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.5221-5315. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -5981-6075. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -5981-6075

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.6741-6835. BALA ACC

Final Inspection for Wave Wall Shear Key Prior to Start Installation (Tag No. As per IN) BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -6171-6265. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -6171-6265

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.6836-6930. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -6266-6360. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -6266-6360.
Concrete Sampling and Placing Inspection
of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.6931-7025 BALA ACC

Top Elevation and Location for Wave Wall Blinding Concrete From CH-23.46 - 160.00 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -6391-6455. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -6391-6455.

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.7026-7120 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -6456 - 6550 . Diamension/Elevation Inspection BALA ACC
CORE-LOC Tag -6456 - 6550

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no.7121-7215 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -6551-6645. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -6551-6645

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no7216-7310 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -6646-6740. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -6646-6740

Concrete Sampling and Placing Inspection


of C-40-OPC-GGBS for the Core Loc - (95 Nos) - Tag no7311-7405 BALA ACC

Top Elevation and Location for Wave Wall Blinding Concrete From CH-160-210 BALA ACC

Top Elevation and Location for Wave Wall Blinding Concrete From CH-210-260 BALA ACC

Top Elevation and Location for Wave Wall Blinding Concrete From CH-260-300 BALA ACC

Reinforcement bar inspection for Wave Wall (Type SA) 2,4,6 Block No. BALA ACC
Formworks inspection for Wave Wall (Type SA) 2,4,6 Block No. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -6741-6835. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -6741-6835

Concrete Sampling and Placing for Wave Wall (Type SA) 2,4,6 Block No. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -6836-6930. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -6836-6930

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.7406-7500 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -6931-7025. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -6931-7025

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.7501-7595. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.7596-7690 BALA ACC

Material Receiving Inspection for Compressible Joint Filler Hydrocell XL


(1m x 2m, T=20mm) Fosroc (QTY : 781 sheet) BALA ACC

Formworks inspection for Wave Wall (Type SA) 8,10,12,14 Block No. BALA ACC

Reinforcement bar inspection for Wave Wall (Type SA) 8,10,12,14 Block No. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -7026 - 7120. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -7026 - 7120

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.7691 - 7785 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -7121 - 7215. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -7121 - 7215
Concrete Sampling and Placing Inspection
of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.7786 - 7880 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -7216 - 7310. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -7216 - 7310

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.7881 - 7975 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -7311 - 7405. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -7311 - 7405

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.7976 - 8070 BALA ACC

Formworks inspection for Wave Wall (Type SA) 3 ,5 Block No. BALA ACC

Reinforcement bar inspection for Wave Wall (Type SA) 3 ,5 Block No. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -7406 - 7500. Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -7406 - 7500.

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.8071 - 8165 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -7501 - 7595.. Diamension/Elevation Inspection BALA ACC
CORE-LOC Tag -7501 - 7595

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.8166 - 8260 ACC

Formworks inspection for Wave Wall (Type SA) 16,18,20 &22 Block No. ACC

Reinforcement bar inspection for Wave Wall (Type SA) 16,18,20 &22 Block No. ACC

Surface Concrete after Form removal CORE-LOC


Tag -7596 - 7690 Diamension/Elevation Inspection
CORE-LOC ACC
Tag -7596 - 7690
Surface Concrete after Form removal CORE-LOC
Tag -7881 - 7975 Diamension/Elevation Inspection
CORE-LOC ACC
Tag -7881 - 7975

Surface Concrete after Form removal CORE-LOC


Tag -7691 - 7785 Diamension/Elevation Inspection
CORE-LOC ACC
Tag -7691 - 7785

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.8261 - 8355 ACC

Formworks inspection for Wave Wall (Type SA) 7, 9, 11 Block No. ACC

Reinforcement bar inspection for Wave Wall (Type SA) 7, 9, 11 Block No. ACC

Surface Concrete after Form removal CORE-LOC


Tag -7786 - 7880 Diamension/Elevation Inspection
CORE-LOC ACC
Tag -7786 - 7880

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.8356 - 8450 ACC

Formworks inspection for Wave Wall (Type SA) 24, 26, 28, 30 Block No. ACC

Reinforcement bar inspection for Wave Wall (Type SA) 24, 26, 28, 30 Block No. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.8451 - 8545 BALA ACC

Formworks inspection for Wave Wall (Type SA) 13, 15, 17 Block No. BALA ACC

Reinforcement bar inspection for Wave Wall (Type SA) 13, 15, 17 Block No. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -7976 - 8070 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -7976 - 8070

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.8546 - 8640 BALA ACC
Surface Concrete after Form removal CORE-LOC
Tag -8071 - 8165 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -8071 - 8165

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.8641 - 8735 BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.8736 - 8830 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -8166 - 8260 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -8166 - 8260

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.8831 - 8925 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -8261 -8355 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -8261 -8355

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.8926 - 9020 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -8356 - 8450 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -8356 - 8450

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.9021 - 9115 BALA ACC

Trial Mix for Barge Batching Plant (Marine) BALA

Formworks inspection for Wave Wall (Type SA) 19, 21, 23 Block No. BALA ACC

Reinforcement bar inspection for Wave Wall (Type SA) 19, 21, 23 Block No BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag -8451 - 8545 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -8451 - 8545

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.9116 - 9210 BALA ACC
Surface Concrete after Form removal CORE-LOC
Tag --8546 - 8640 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag --8546 - 8640

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.9211 - 9305 BALA ACC

Formworks inspection for Wave Wall (Type SA) 25, 27, 29 Block No. BALA ACC

Reinforcement bar inspection for Wave Wall (Type SA) 25, 27, 29 Block No. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.9306 -9400 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag --8736 - 8830 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag --8736 - 8830

Top Elevation and Location for Wave Wall Blinding.


From Ch- 720 To CH 790 BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no. 9401 - 9495 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag --8831 - 8925 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -- 8831 - 8925

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.9496 - 9590 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag --8546 - 8640 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -- 8546 - 8640

Surface Concrete after Form removal CORE-LOC


Tag --8926 - 9020 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -- 8926 - 9020

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.9591 - 9685 BALA ACC

Formworks inspection for Wave Wall (Type LD) 1,3,5,7 Block No. BALA ACC
Reinforcement bar inspection for Wave Wall (Type LD) 1,3,5,7 Block No. BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag --9021 - 9115 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -- 9021 - 9115

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.9686 - 9780 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag --9116 - 9210 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -- 9116 - 9210

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.9781 - 9875 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag --89211 - 9305 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -- 89211 - 9305

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.9876 - 9970 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag --9306 - 9400 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -- 9306 - 9400

Formworks inspection for Wave Wall (Type LD) 2, 4, 6 Block No. BALA ACC

Reinforcement bar inspection for Wave Wall (Type LD) 2, 4, 6 Block No. BALA ACC

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.9971 - 10065 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag --9401 - 9495 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -- 9401 - 9495

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.10066 - 10160 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag --9496 - 9590 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -- 9496 - 9590
Concrete Sampling and Placing Inspection
of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.10161 - 10255 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag --9591 -9685 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -- 9591 -9685

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.10256 - 10350 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag --9686 - 9780 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -- 9686 - 9780

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.10351 - 10445 BALA ACC

Surface Concrete after Form removal CORE-LOC


Tag --9781 -9875 Diamension/Elevation Inspection
CORE-LOC BALA ACC
Tag -- 9781 -9875

Barge Batching Plant Inspection for Welding, Electrical and Civil

Concrete Trial Mix for Barge Batching Plant (Marine)

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.10446 - 10540

Surface Concrete after Form removal CORE-LOC


Tag --9876 - 9970 Diamension/Elevation Inspection
CORE-LOC
Tag -- 9876 - 9970

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.10541 - 10635

Surface Concrete after Form removal CORE-LOC


Tag --9971 - 10065 Diamension/Elevation Inspection
CORE-LOC
Tag -- 9971 - 10065

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no.10636 - 10730

Surface Concrete after Form removal CORE-LOC


Tag --10066 - 10160 Diamension/Elevation Inspection
CORE-LOC
Tag -- 10066 - 10160
Concrete Sampling and Placing Inspection
of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no. 10731-10825

Surface Concrete after Form removal CORE-LOC


Tag --10161 - 10255 Diamension/Elevation Inspection
CORE-LOC
Tag -- 10161 - 10255

Surface Preparation Inspection prior to Joint Sealant Application at Wave Wall (LD) Block No. 1 to
7

Applied Joint Sealant Inspection prior to Backfilling works of Wave Wall (LD) Block No. 1 to 7

Top Elevation and Location for Wave Wall Concrete Blinding (LH)
From Ch- 1245 To CH 1415

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no. 10826 - 10920

Surface Concrete after Form removal CORE-LOC


Tag --10256-10350 Diamension/Elevation Inspection
CORE-LOC
Tag -- 10256-10350

Formworks inspection for Wave Wall (Type LH) 10, 12, 14 Block No.

Concrete Sampling and Placing Inspection


of C-40-OPC+GGBS for the Core Loc - (95 Nos) - Tag no. 10921-11015

Surface Concrete after Form removal CORE-LOC


Tag --10351-10445 Diamension/Elevation Inspection
CORE-LOC
Tag -- 10351-10445

Welder Qualification Test VIJAYRAHAVAN CANCELLED

Welder Qualification Test VIJAYRAHAVAN ACC

Welder Qualification Test VIJAYRAHAVAN ACC


Remarks
refer to IN-HSS-C-0033

Accepted with comments


Accepted with comments

postponed to 24/08/2016
07.00AM

Accepted with comments

Accepted with Comments


and Re-offered on
29/08/2016

ACCEPTED WITH
COMMENTS
SEE IN-0085 POURED ON
03/08/2016 NIGHT 10.55

see IN-0077 Poured on


3rd Aug. Night 10.55

started on 4th early


morning 1.05
Accepted with comments
Not Yet Signed (Awaiting new ITR
to get approved)
Not yet signed
IN NOT YET SIGNED
IN NOT YET SIGNED

IN NOT YET SIGNED

IN NOT YET SIGNED

IN NOT YET SIGNED


IN NOT YET SIGNED

IN NOT YET SIGNED

IN NOT YET SIGNED

IN NOT YET SIGNED

2G-3 Passed,1 Reject; 3G-4 Passed

2G- 6 Passed,2 Failed; 3G-


7 Passed, 1 Failed
INSPECTION STATUS SUMMARY - EPC045 (Weekly)
Enter the Week Number:- 30 2016

EPC045 WEEKLY RFI STATUS SUMMARY


6

Total Number of RFI; 5


5

Total Number ACC; 4


4

Total Numbers Canceled; 1


1
2

Total Numbers Canceled; 1


1

Total Numb
0
Tota l Number of RFI Total Number ACC Total
TotaNumber
l NumberREJ;
REJ 0 Total
TotaNumber
l NumberPost;
Post 0 Total
TotaNumbers
l NumbersOthers;
Others 0 Tota l Numbers Ca ncel ed Tota l Num

Discipline Wise Weekly RFI Status - EPC045

4.5

3.5

3
3.5

2.5

1.5

0.5

0
TOTAL ACC REJ POST OTHERS CANCELED ACC (Wi th Co

Inspector Wise Weekly Inspection Status - EPC045


4 4
4

3.5
Inspector Wise Weekly Inspection Status - EPC045
4 4
4

3.5

2.5

1.5

1 1
1

0.5

0
0TOTAL
0 0 0 0 0 0 ACC
0 0 0 0 0 0 0 REJ
0 0 0 0 0 0 0 POST
0 0 0 0 0 0 0OTHERS
0 0 0 0 0 CANCELED
0 0 0 0 0 0 ACC
0 (With
0 0Comm
0
0.5

0
0TOTAL
0 0 0 0 0 0 ACC
0 0 0 0 0 0 0 REJ
0 0 0 0 0 0 0 POST
0 0 0 0 0 0 0OTHERS
0 0 0 0 0 CANCELED
0 0 0 0 0 0 ACC
0 (With
0 0Comm
0
5 (Weekly)

Total Numbers Canceled; 1


Total Numbers Canceled; 1

Total Number Acc (With Comments); 0


Tota l Numbers Ca ncel ed Tota l Number Acc (Wi th Comments )
CANCELED ACC (Wi th Comments )
ANCELED
0 0 0 0 0 ACC
0 (With
0 0Comments
0 0 0)
ANCELED
0 0 0 0 0 ACC
0 (With
0 0Comments
0 0 0)
INSPECTION STATUS SUMMARY - EPC045 (Weekly)

SELECT MONTH/YEAR OCT 2016


EPC045 INSPECTION SUMMARY (Monthly)

0.9

0.8

0.7

0.6

0.5

0.4

0.3

0.2

0.1

0
0 0 0 0 0 0 0
0.2

0.1

0
0 0 0 0 0 0 0

Discipline Wise Monthly RFI Status - EPC045


1

0.9

0.8

0.7

0.6

0.5

0.4
0.6

0.5

0.4

0.3

0.2

0.1

0
0 0TOTAL
0 0 0 0 0 ACC
0 0 0 0 0 REJ
0 0 0 0 0 POST
0 0 0 0 OTHERS
0 0 0 0 0 CANCELED
0 0 0 0 ACC0(Wi0th Comments)
0 0 0

Inspector Wise Monthly Inspection Status - EPC045


1

0.9

0.8

0.7
0.8

0.7

0.6

0.5

0.4

0.3

0.2

0.1

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0
TOTAL ACC REJ POST OTHERS CANCELED ACC (With Comments)
0
0
Wi0th Comments)
0 0 0
0 0 0 0 0

With Comments)
Inspection Summary Status(Overall) - EPC 045

Tota l Number Acc (With Comments )


6

Tota l Numbers Canceled


2

0
Tota l Numbers Others

0
Total Number Post

Tota l Number REJ 17

Total Number ACC

Total Number of RFI

0 100 200 300 400 500 600 700 80


Overall) - EPC 045

814

872

600 700 800 900