L A N D U S E A N D ZO N I N G
XAVIER ESTATES
PHASE 1A
_____________________________
PARKING LOT
VICINITY MAP
_____________________________
XAVIER SPORTS
ARCHITECTURAL
AND COUNTRY
CLUB
RIDGEVIEW
CHALET
A BROWN
_____________________________
COMPANY INC.
STRUCTURAL/CIVIL
S A N I T A R Y
_____________________________
P L U M B I N G
_____________________________
ELECTRICAL
21.19 m
_____________________________
TECHNICAL DESCRIPTION
m
17.44
M EC HA NIC AL
FLOOR
AREA
16.39 m
_____________________________
FIRE DEPARTMENT
LOT A
RE A
22.64 m _____________________________
PERSPECTIVE E L E C T R O N I C S
_____________________________
LOT PLAN
G E O D E T I C
_____________________________
PROPOSED TWO-STOREY
UNIVERSITY OF SCIENCE AND
N A P A Y , P E A R L Y N E J O Y D .
RESIDENTIAL BUILDING ENGR. MARICEL P. SAMONTEZA 1
TECHNOLOGY OF SOUTHERN PHILIPPINES
YEAR:
SECTION:
F O U R T H
B S C E
Y E A R
4 A - b 1
DATE SUBMITTED:
M A R C H 1 7 , 2 0 1 8 Xavier Estates, Cagayan de Oro City
I N S T R U C T O R
6
FRONT ELEVATION LEFT-SIDE ELEVATION
SCALE 1:100 mts.
SCALE 1:100 mts.
REAR ELEVATION
SCALE 1:100 mts. RIGHT-SIDE ELEVATION
SCALE 1:100 mts.
FOUNDATION PLAN
SCALE 1:100 mts. ROOF PLAN
SCALE 1:100 mts.
BEAM DETAILS
SPACING O.C LENGTH (L) BEAM MARK
DIMENSION (m)
WIDTH HEIGHT
REBARS ( mm)
BARS @ 0.60m O.C. @
Every third Layers
L/3 L/3
22
21
20
19 L2
18
17
16
15
14
13
12
11 TYPICAL SLAB
10 SCALE 1:100 mts.
9
8
7
6
SCHEDULE OF SLABS
5
ALONG SHORT DIRECTION ALONG LONG DIRECTION
4 THICKNESS DIMENSIONS
SLAB MARK (m) SLAB
3 (mm) REBARS CONTINUOUS MID SPAN DISCONTINUOUS REBARS CONTINUOUS MID SPAN DISCONTINUOUS REMARKS
L B
2
1 S-1 1oo 6 4 10 10 2-WAY
3
4
rp
sp
1
2 Ampere Rating
1
S1
S2
S3
LIGHTING CIRCUIT LAY-OUT (GF)
SCALE 1:100 mts. LIGHTING CIRCUIT LAY-OUT (2F)
SCALE 1:100 mts.
S2 S1
S1
S1
S1
S1 S3
S3
S2
S3 S2
S3 S3
SCHEDULE OF LOADS: DESIGN COMPUTATION FOR MAIN FEEDER:
S1 E E
SWITCHING-OUTLET LAY-OUT (GF) 10 REFRIGERATOR OUTLET 1 180 0.82 30 2 20 mm EMT and a 60Amps main protection.
SCALE 1:100 mts. SWITCHING-OUTLET LAY-OUT (2F) 11 ACU - 1.5 HP 1 1119 5.09 30 2 20 mm
SCALE 1:100 mts. TOTAL 12,979 59.09
SEPTIC
VAULT
SCHEMATIC DIAGRAM