Construction Closeout Checklist

This construction contract close-out checklist ensures that all necessary tasks are completed before a project closes out. It verifies that all field issues are resolved, the site and building are clean, all building systems are tested and certified as complete and operational, all inspection reports and punch lists are issued and completed, operation and maintenance manuals and as-built drawings are submitted, and the project receives final evaluation. Completing this checklist indicates the project is ready for close-out.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
487 views1 page

Construction Closeout Checklist

This construction contract close-out checklist ensures that all necessary tasks are completed before a project closes out. It verifies that all field issues are resolved, the site and building are clean, all building systems are tested and certified as complete and operational, all inspection reports and punch lists are issued and completed, operation and maintenance manuals and as-built drawings are submitted, and the project receives final evaluation. Completing this checklist indicates the project is ready for close-out.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Construction Contract CLOSE-OUT Checklist Current Date:

Project Name & No. Const. Rep.:


Substantial Completion Date PM:
Contractor AE:

Yes ✔ All Field Issues are resolved.

Yes ✔ Site and Building clean per specifications.

Yes ✔ All Building systems tested and certified complete and operational per specification.
Electrical
Plumbing
Mechanical
TeleData
Special Systems
Life Safety Systems

Yes ✔ All Field Inspection Reports issued, signed by contractor and returned.

NA Balance Reports submitted, approved by A/E and turned over.

Yes ✔ All contract-required tools, spare parts and 'attic stock' submitted per contract.

NA All keys are turned over.

Yes ✔ All owner training completed.

Yes ✔ All regulatory documents properly submitted.

Yes ✔ All proposals and change orders have been fully executed.

Yes ✔ All disputes, claims, RFIs, etc. are resolved.

Yes ✔ All punch list items complete, certified, and filed in g:/drive.

Yes ✔ Complete “Construction Record Package” has been submitted & approved.
Operation and Maintenance Manuals/Warranties
As-built drawings
Manufacturer Instructions

NA A/E Evaluation Complete on WisBuild.