Widening and Improvement of Road and Construction of Flyover at Mirpur Cantt. Estimation For Soil Investigation

The document provides an estimation for soil investigation work for the widening and improvement of a road and construction of a flyover in Mirpur Cantt. It includes boring work with SPT tests to depths of 40m and 20m, laboratory testing of disturbed and undisturbed soil samples, roadside soil exploration with pits and tests, and exploration of soft soil with drilling and testing. The total estimated cost for all the soil investigation work is 1,934,000 Taka.

Uploaded by

Golam Masud
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views5 pages

Widening and Improvement of Road and Construction of Flyover at Mirpur Cantt. Estimation For Soil Investigation

The document provides an estimation for soil investigation work for the widening and improvement of a road and construction of a flyover in Mirpur Cantt. It includes boring work with SPT tests to depths of 40m and 20m, laboratory testing of disturbed and undisturbed soil samples, roadside soil exploration with pits and tests, and exploration of soft soil with drilling and testing. The total estimated cost for all the soil investigation work is 1,934,000 Taka.

Uploaded by

Golam Masud
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Widening and Improvement of Road and Construction of Flyover at Mirpur Cantt.

Estimation for Soil Investigation

Description of work Rate(App) No. Amount, Taka

BORING [5 nos]
Drilling and SPT for 50m BH; SPT @1.5m
interval Including equipment mobilisation 15,000 5 75,000
and demobilisation

Lab test on disturbed soil (3 Nos) 3,500 5 17,500


Lab test on undisturbed soil (1 No) 3,500 5 17,500
Reporting 20,000 1 20,000

ROADSIDE SOIL EXPLORATION [4]


Making pits to 1.5m approx. 2,000 4 8,000
Classification, Compac. &CBR tests 8,500 4 34,000

PAV'T MATERIAL SURVEY


DCP test and m/c tests incl. pit excavation 2,500 10 25,000
LAA test 3,000 1 3,000

GRAND TOTAL: 200,000


t Mirpur Cantt.
Widening and Improvement of Road and Construction of Flyover at Mirpur Cantt.

Estimation for Soil Investigation

Description of work Rate(App) No. Amount, Taka

BORING [30 nos]


Drilling and SPT to 40m BH; SPT @1.5m
interval Including equipment mobilisation and 37,000 10 370,000
demobilisation

Drilling and SPT to 20m BH; SPT @1.5m


interval Including equipment mobilisation and 18,000 20 360,000
demobilisation

Lab test on disturbed soil (3 samples/BH) 3,500 30 105,000


Lab test on undisturbed soil (1 sample/BH) 3,500 30 105,000
Reporting 40,000 1 40,000

ROADSIDE SOIL EXPLORATION [#8]


Making pits to 1.5m approx. 2,000 8 16,000
Classification, Compac. &CBR tests 8,500 8 68,000

EXISTING PAV'T MATERIAL SURVEY


DCP test and m/c tests incl. pit excavation at 2,500 10 25,000
road edge

EXPLORATION OF SOFT SOIL


Drilling and SPT to 8m BH; SPT @1.5m interval
Including equipment mobilisation and 6,400 8 51,200
demobilisation

Lab test on disturbed soil (2 samples/BH) 2,500 8 20,000


Lab test on undisturbed soil (1 sample/BH) 3,500 8 28,000
Reporting

GRAND TOTAL(TAKA): 1,188,200

* All work shall include "reporting"


Widening and Improvement of Road and Construction of
Flyover at Mirpur Cantt.

Estimation for Soil Investigation Work


Description of work Rate(App) No. Amount, Taka

BORING [30 nos]


Drilling and SPT to 40m BH; SPT @1.5m
interval Including equipment mobilisation 60,000 10 600,000
and demobilisation

Drilling and SPT to 20m BH; SPT @1.5m


interval Including equipment mobilisation 30,000 20 600,000
and demobilisation

Lab test on disturbed soil (3 samples/BH) 3,500 30 105,000


Lab test on undisturbed soil (1 sample/BH) 4,000 30 120,000
Reporting 80,000 1 80,000

Subtotal: 1,505,000

ROADSIDE SOIL EXPLORATION [#8]


Making pits to 1.5m approx. , carrying 6,000 8 48,000
samples etc., Classification, Comp. & CBR 16,000 8 128,000

Subtotal: 176,000

EXISTING PAVEMENT MATERIAL SURVEY


DCP test and m/c tests incl. pit excavation
6,500 10 65,000
at road edge
Subtotal: 65,000

EXPLORATION OF SOFT SOIL


Drilling and SPT to 8m BH; SPT @1.5m
interval Including equipment mobilisation 10,000 8 80,000
and demobilisation

Lab test on disturbed soil (2 samples/BH) 2,500 8 20,000


Lab test on undisturbed soil (1 sample/BH) 6,000 8 48,000
Reporting 40,000 1 40,000
Subtotal: 188,000

GRAND TOTAL(TA): 1,934,000


Note
The rate mentioned above includes costs
of sampling, marking, preservation, tools,
transportation, personels, etc.