Day1 Agenda
• Introduction to ABB robot
• Safety
• Definition of Industrial Robot
• Description of Manipulator
• Description of Controller
• Description of Flexpendent
• Pictorial description of Robot Connection
• Jogging
– Motion Mode
– Coordinate System
• Practice
© ABB Group
December 15, 2011 | Slide 2
ROBOT SPECIFICATION
• ABB robots are specified using a designation IRB say for example, IRB140, IRB1400, IRB2400,
IRB1600, IRB6600, IRB340 etc.
• IRB stands for Industrial Robot Body
Some important specifications to look for in a
Robot are:
1.Payload
2.Reach
3.Supplementary load.
4.Speed
© ABB Group
December 15, 2011 | Slide 3
Robots Overview
6 axis robots Paint robots Dedicated 4 axis robots
Picking
Packing
Palltizing
© ABB Group
December 15, 2011 | Slide 4
Small robot family
Pay load 5kg to 60kg
6kg 0.81m 5kg 1.44m 6-8kg 1.2/1.45m
Integrated Dressing
IRB 1600ID IRB 2400 IRB 4400
© ABB Group
December 15, 2011 | Slide 5
Robots
New family of mid range robots – IRB 4600
45 or 60kg 2.05m 40kg 2.55m 20kg 2.5m
• 4 robots in one
• Fast, accurate, robust, compact, large working range
• Flexible mounting – floor, tilted 15 degrees , inverted, shelf
• Protection with IP67, Clean Room, Foundry Plus, Foundry Prime,
Wash Down
• Fieldbus on upper arm. Electronic Position Switches (EPS)
© ABB Group
December 15, 2011 | Slide 6
Large robot family
Pay load 90kg to 650kg*
150kg 2.2m 205kg 1.9m 130kg 3.1m
IRB 6620 IRB 6660 Pre Machining IRB 6660 Press Tending
* 650kg capacity
IRB 6650S IRB 6640 IRB 7600 with wrist down
© ABB Group
December 15, 2011 | Slide 7
New 150kg capacity rail mounted robot
IRB 6620LX – Linear Axis
© ABB Group
December 15, 2011 | Slide 8
Paint robot family
With dedicated controller
All ABB paint Compact Flexwrist & CP prog. Hollow Wrist
robots, paint
controllers and
paint
programming
units are
Explosion
Protected.
See data sheets
for more
information.
© ABB Group
December 15, 2011 | Slide 9
Dedicated 4 axis robot family
Overview - picking, packing, palletizing
High speed picker Top loading packer Palletizer
1-3kg 1.13m or 1.6m 30kg 1.5m 180-250kg 3.15m
Serving fully
integrated
packing lines
© ABB Group
December 15, 2011 | Slide 10
The FlexPicker family
Now extended with new “long arm” version
Existing pickers New picker variant
© ABB Group
December 15, 2011 | Slide 11
Robot control family
Overview
Modular version Panel mount version Paint version
FlexPendant
graphical user
interface
© ABB Group
December 15, 2011 | Slide 12
DEFINITION OF AN INDUSTRIAL ROBOT
© ABB Group
December 15, 2011 | Slide 13
ABB Safety Solutions – an Overview
• Emergency stop
• Operating mode
– Auto
– Manual < 250 mm/s
– Manual 100%
• Enabling device
(Dead mans grip)
• Hold-to-run
• Safeguard stop
(Auto and Manual)
• Limiting the workspace
© ABB Group
December 15, 2011 | Slide 14
Accident Risks
• Fault tracing
• Repair
• Change of
program
• Test run
© ABB Group
December 15, 2011 | Slide 16
Hold-to-Run
Enabling device
Hold-to-run buttons
(for left or right hand)
© ABB Group
December 15, 2011 | Slide 17
Safeguard Stop
• The connection of safeguard stop enables inter-locking of external safety equipment, such
as: doors, photo-electric trip device, photo cells or sensible mats
• There are two categories of Safeguard stop:
– Manual – the safeguard stop is active regardless of operating modes (Emergency Stop,
General Stop, Superior Stop)
– Auto – the safeguard is active when automatic mode is selected (Auto Stop)
• It is possible to activate Delayed Safeguard Stop.
A delayed stop gives a smooth stop. The robot stops in the same way as at a normal program
stop with no deviation from the programmed path. After approx. 1 second the power
supplied to the motors shuts off.
© ABB Group
December 15, 2011 | Slide 18
Limiting the Workspace
© ABB Group
December 15, 2011 | Slide 19
Safety Regarding Grip Device
• All grip devices should be designed so the work piece will be held even on power failure and
other disturbances in the robot system
• There should be possibilities to release the work piece manually
© ABB Group
December 15, 2011 | Slide 20
Electrical Safety
© ABB Group
December 15, 2011 | Slide 21
Safety Regarding Releasing the Breaks
© ABB Group
December 15, 2011 | Slide 22
MANIPULATOR
© ABB Group
December 15, 2011 | Slide 23
DESCRIPTION OF A MANIPULATOR
© ABB Group
December 15, 2011 | Slide 24
Block Diagram of Robot
Resolver Cable
EXTERNAL AXIS
R
Y
B 3 Phase 415VAC
© ABB Group
December 15, 2011 | Slide 25
Six Axis Robot Movement
© ABB Group
December 15, 2011 | Slide 26
DEGRES OF FREEDOM
The number of independent movements a robot can make is known as the degree of
freedom of the robot manipulator. In other words the number of rotary axes a
manipulator has is known as its degree
of freedom.
© ABB Group
December 15, 2011 | Slide 27
THE MAJOR AND MINOR AXES OF A ROBOT
• The first 3 axes (axis 1/2/3/) of a robot are known as the major axes because they help in
positioning the wrist at a required point on the workpiece.
• The last 3 axes (4/5/6) of a robot are called as the minor axes because they allow the wrist to
reorient in any required direction without changing its position.
© ABB Group
December 15, 2011 | Slide 28
CONTROLLERS
© ABB Group
December 15, 2011 | Slide 29
Controllers
S1 1974 - 1982 S2 1983 - 1991 S3 1987 - 1996 S4 1994 - 1999
© ABB Group
December 15, 2011 | Slide 30
IRC5 – the 5th generation Robot Controller
© ABB Group
December 15, 2011 | Slide 31
Single Cabinet Controller
Drive and control functions combined in one cabinet
Clean AluZinc cabinet
(only front painted)
resistant to environmental
influence
self healing if scratched
Dimensions 970 x 725 x 710 (H x D x W)
Full option range, including MultiMove
Max 2 internal I/O units
900
© ABB Group
December 15, 2011 | Slide 32
Pictorial description of Controller (Outside)
Main Disconnect
E-Stop
Motors On
Mode Selector
Hour Meter
© ABB Group
December 15, 2011 | Slide 33
OPERATING MODES OF A ROBOT
Power ON/OFF
Manipulator signal
interface
Operator´s panel
Service ports
USB (option)
Drive unit Customer (I/O) space
Ethernet
section
FlexPendant
connection
Axis computer
Options: (right inside wall)
Duty Time Counter
230/120 V service
outlet Power intake
Motors On contactors Manipulator connections
and interface board
(left inside wall) Customer connections
(behind optional cover)
© ABB Group
December 15, 2011 | Slide 35
Single Cabinet Controller
© ABB Group
December 15, 2011 | Slide 36
Drive Module for MultiMove Requirements
© ABB Group
December 15, 2011 | Slide 37
Process Module
© ABB Group
December 15, 2011 | Slide 38
Module Family Concept
© ABB Group
December 15, 2011 | Slide 39
MultiMove Stand-Alone
© ABB Group
December 15, 2011 | Slide 40
Flexpendant
© ABB Group
December 15, 2011 | Slide 41
IRC5 – FlexPendant
Status bar
ABB Menu
Main menu
Windows style
“switch between Quickset or
open windows/views” © ABB Group “COG” Menu
December 15, 2011 | Slide 42
Graphical color touch screen
IRC5 – FlexPendant 4 Hard keys for fast access
Programmable
© ABB Group
December 15, 2011 | Slide 44
MODES OF JOGGING
© ABB Group
December 15, 2011 | Slide 45
Jogging the robot
Remember that the joystick assumes you are facing the front of the robot.
© ABB Group
December 15, 2011 | Slide 46
Jogging the robot
+3 +4
-5
+6
-2
-3
-4 +5 -6
+2
+5
+2
-1 +1
-4 +4
-1 +1
+6 -6
+3 -3
-5
-2
+Z Z
Y
+Y
-X
-X
X
-Y +Y
-Y +Y
+Z -Z
+Z -Z +X
+X
+X
© ABB Group
December 15, 2011 | Slide 47
INCREMENTAL MODE
© ABB Group
December 15, 2011 | Slide 48
Coordinate Systems
TCPZ
Y
X
Tool coordinates
Z
Y
X
Base coordinates
Z Z
Y
Y
X WorkObject
World coordinates
X
© ABB Group
December 15, 2011 | Slide 49
Right Hand Rule
+Z
+X
+Y
© ABB Group
December 15, 2011 | Slide 50
Day-2 Agenda
• Defining a tool
• Defining a workobject
• Motion instruction
• Basic Programming Structure
• Practice
© ABB Group
December 15, 2011 | Slide 51
TOOL
© ABB Group
December 15, 2011 | Slide 52
Tool Definition
“Keeps Tool Frame
Directions same as
TCP Default Orient Tool0
Tool Definition
TCP & Z
© ABB Group
December 15, 2011 | Slide 53
Tool Coordinate System
X Z
Benefits using Tool:
Jogging
Re-orientation
Easy to change
Z
Y
Base coordinates
X © ABB Group
December 15, 2011 | Slide 54
Coordinate System
TCP
TCP
TCP
TOOL0
TCP
© ABB Group
December 15, 2011 | Slide 55
Define a Tool, 4-point Method
• tPen
Fixed point
© ABB Group
December 15, 2011 | Slide 56
Defining a Tool
TCP & Z x x 0 0
TCP Z & X x x x x
© ABB Group
December 15, 2011 | Slide 59
Origin & Frame Orientation
Y1
Y axis
X axis
X2
90°
Origin
X1
© ABB Group
December 15, 2011 | Slide 60
Work Object Coordinate System
TCP Z WorkObject
Y
X X
Tool coordinates
Z
Y
X
Base coordinates
© ABB Group
December 15, 2011 | Slide 61
Work Object Coordinate System
© ABB Group
December 15, 2011 | Slide 62
Create a Work Object
© ABB Group
December 15, 2011 | Slide 63
Create a Work Object
Origin y1
x2
wobjA4
© ABB Group
December 15, 2011 | Slide 64
WORK OBJECT DEFINITION
© ABB Group
December 15, 2011 | Slide 65
Activating a Work Object
© ABB Group
December 15, 2011 | Slide 66
Programs/Routines/Modules Structure
X Task PROGRAMS
Y Task
Created By Default
Mainmodule M N
Mainmodu P Q
le
R1( )
R1( )
R2 ( ) Main()
Main()
R6( ) R7( )
R2( )
R3( ) R5( )
ROUTINES
R6( )
R3( ) R7( )
R4( )
R4( )
R5( )
© ABB Group
December 15, 2011 | Slide 67
Create a program
• To Create a new program:
(If no program exists)
– Tap ABB
– Tap Program Editor
– Select Robot Task
– Tap New.
– Give your program a name
– Tap OK
© ABB Group
December 15, 2011 | Slide 68
Saving and Loading a program
To create a new program or load an existing program or Save a program:
•Tap ABB
•Tap Program Editor
•Select Robot Task
•Tap Tasks and Programs
•Select a Task if multiple
robots
•Tap File
© ABB Group
December 15, 2011 | Slide 69
Saving a program
The same
name
© ABB Group
December 15, 2011 | Slide 70
Changing a Program
Select item to
change by double
Tapping.
© ABB Group
December 15, 2011 | Slide 71
MOTION INSTRUCTION
© ABB Group
December 15, 2011 | Slide 72
MoveJ or MoveL?
MoveJ
Joint interpolation is often the fastest way to move between two points
as the robot axes follow the closest path between the start point and the
destination point (from the perspective of the axis angles). Use when in
open spaces such as moving from one fixture to another.
MoveL
pCircle30
pCircle40
© ABB Group
December 15, 2011 | Slide 74
Circular Movement
• Circle with MoveC’s
pCircle20
pCircle30
pCircle50
pCircle40
Press Modify pos
© ABB Group
December 15, 2011 | Slide 75
Velocity and Zones
z
MoveL p40, v1000, z40, tool0;
© ABB Group
December 15, 2011 | Slide 76
Inserting Move Instructions
• To add instructions to your program:
– Tap Add Instruction
– Jog robot into position
– Tap MoveJ or MoveL
– Jog robot to next position
– Repeat
© ABB Group
December 15, 2011 | Slide 77
Modifying a Position
Tap
Modify Position
© ABB Group
December 15, 2011 | Slide 78
Day-3 Agenda
• Error handling
• Offset function
• Program Flow instruction
• Communication Instruction
• Backup
• Calibration
• Practice
© ABB Group
December 15, 2011 | Slide 79
ERROR HANDLING
© ABB Group
December 15, 2011 | Slide 80
Introduction
– Warning
– E.g: Manual movement full speed is selected.
The operator is informed about a potential risk.
– Error
– E.g: Motor On when Emergency Stop is active.
The system cannot operate before a measure is
carried out.
© ABB Group
December 15, 2011 | Slide 81
Error Message
• When the computer detects a problem or possible problem, it
generates an error message with description and action.
– Unacknowledged message is displayed in red on the status bar
Unacknowledged
message displayed
© ABB Group
December 15, 2011 | Slide 82
Event Log
Symbol Code Title Time stamp
© ABB University -99
© ABB Group
December 15, 2011 | Slide 83
Event Log
© ABB Group
December 15, 2011 | Slide 84
Event Log
• Logs are stored under different topics
• Tap view and select the topic of interest
– Topic common consist of a mixture of the last created loggs
© ABB Group
December 15, 2011 | Slide 85
Programmable Keys
• Setup a programmable key.
– Tap ABB : Control Panel : ProgKeys
– Select Key to setup.
– Select Type (usually Output)
– Select Output.
– Select Key Pressed
– Tap OK.
© ABB Group
December 15, 2011 | Slide 86
offset function
© ABB Group
December 15, 2011 | Slide 87
Function Offset
Function Offset
In the Move command position definition, choosing
function will enable move with offset (Offs). A
displacement of the robot position.
Example
Used to displace a position
Move type Speed
from original position
C, J, L Accuracy
© ABB Group
December 15, 2011 | Slide 88
Making a Perfect Circle
To Make a Perfect Circle
MoveL pStart, v500, fine, toolx;
MoveC Offs(pStart,-100,-100,0),Offs(pStart,-200,0,0),v500,z1,toolx;
MoveC Offs(pStart,-100,100,0), pStart,v500,z1,toolx;
CW or CCW
© ABB Group
December 15, 2011 | Slide 89
Offset Example
Example
© ABB Group
December 15, 2011 | Slide 90
Square with Offsets
MM X
Example 100
Which quadrant will
the square be drawn?
75
1 2
50 1 2 3 4
25
100 75 50 25 -25 -50 -75 -100
Y MM
-25 pSTART
-50
3 4
-75
-100
© ABB Group
December 15, 2011 | Slide 91
Debug
Program
Pointer (PP)
© ABB Group
December 15, 2011 | Slide 92
PROGRAM FLOW INSTRUCTIONS
• IF ELSE
• GOTO
• FOR
• COMPACT IF
• TEST CASE
© ABB Group
December 15, 2011 | Slide 93
COMPACT IF
© ABB Group
December 15, 2011 | Slide 94
IF ELSE
IF reg2=10 THEN
MoveJ *,v500,z80,tool0;
MoveL *,v1000,z50,tool0;
ELSE
MoveL *,v500,z20,tool0;
MoveC *,*,v500,z20,tool0;
ENDFOR
If a given condition is true it executes a set of instructions and if it is false then it executes
another set of instructions.
© ABB Group
December 15, 2011 | Slide 95
GOTO
GOTO start;
………….
………….
………….
start:
On seeing the instruction the program pointer goes to the line containing the
label start.
© ABB Group
December 15, 2011 | Slide 96
FOR
© ABB Group
December 15, 2011 | Slide 97
TEST
TEST reg1
Case 1: …………
…………
Case 2: ………….
…………
Case 3: …………
…………
ENDTEST
Executes set of instructions based on the integer values of a variable eg. reg1.
© ABB Group
December 15, 2011 | Slide 98
COMMUNICATION INSTRUCTIONS
© ABB Group
December 15, 2011 | Slide 99
TPWrite& TP Erase
• TPWrite instruction is used to write messages to the screen. Certain data values can also be
written.
• TPErase instruction is used to clear the screen.
© ABB Group
December 15, 2011 | Slide 100
Eg:-
© ABB Group
December 15, 2011 | Slide 101
TP Read Num
TPReadNum nfigures, “How many figures do you want?
© ABB Group
December 15, 2011 | Slide 102
TPReadFK
TPReadFK nFigure, “Is this a GOOD or BAD part?”, stEmpty, “GOOD”, stEmpty, “BAD”, stEmpty;
© ABB Group
December 15, 2011 | Slide 103
CALIBRATION
© ABB Group
December 15, 2011 | Slide 104
CALIBRATION
• An uncalibrated system.
© ABB Group
December 15, 2011 | Slide 105
REVOLUTION COUNTER
© ABB Group
December 15, 2011 | Slide 106
Updating Rev. Counters
© ABB Group
December 15, 2011 | Slide 107
Updating Rev. Counter Procedure
1. Jog the robot to the witness marks / Calibration position.
2. Tap ABB : Calibration
3. Select the robot to be calibrated.
4. Tap Update Revolution Counter
5. Tap YES to confirm this is what you want to do.
6. If needed select the axes to be updated.
7. Tap Update and Update again.
© ABB Group
December 15, 2011 | Slide 108
Checking Robot Calibration
• MoveAbsJ
– Create a new routine (GotoCalib)
– Insert MoveAbsJ instruction
– Choose star position, Edit / View Value, put all 6 axis to zero
© ABB Group
December 15, 2011 | Slide 109
Fine Calibration
• Fine Calibration
– Tells the current angle of engine shaft when robot is in sync position
– Is tuned in by ABB or on site with special equipment
– Only needs to be retuned if a motor / gearbox is replaced
© ABB Group
December 15, 2011 | Slide 110
Edit Motor Calibration Offsets
• Type in the fine calibration values manually
• Use moc.cfg values from Backup, Silver label in back of manipulator with 6 values, or original
Motor Calibration values on floppy shipped with system.
© ABB Group
December 15, 2011 | Slide 111
BACK UP
© ABB Group
December 15, 2011 | Slide 112
BACKUP
© ABB Group
December 15, 2011 | Slide 113
BACKUP
© ABB Group
December 15, 2011 | Slide 114
Day4 Agenda
• I/O Configuration
• I/O Instruction
• Practice
© ABB Group
December 15, 2011 | Slide 115
IRC5 I/O - System
I/O System includes
Field buses
IO-Definitions
I/O Configuration in RSO (Unit, Unit Type and Signals).
Unit Mapping
The Internals of an I/O Unit
Configuration Of Analog Signals
Access Level
Simple and Logical Cross Connection
I/O UNITS SUPPORTING DEVICENET COMMUNICATION
© ABB Group
December 15, 2011 | Slide 118
Parts
Item Description
A Status LEDS
X1 Digital Output
X2 Digital Output
X3 Digital Input
X4 Digital Input
X5 Device Net Connector
Technical data
© ABB Group
December 15, 2011 | Slide 119
Connector X1
Connection to X1
© ABB Group
December 15, 2011 | Slide 120
Connector X2
Connection to X2
© ABB Group
December 15, 2011 | Slide 121
Connector X3
Connection to X3
© ABB Group
December 15, 2011 | Slide 122
Connector X4
Connection to X4
© ABB Group
December 15, 2011 | Slide 123
Connector X5
© ABB Group
December 15, 2011 | Slide 124
CONFIGURING THE I/O S