Lifting Plan - Chimney

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

Greenmind – Assessoria e Serviços, Lda.

CRITICAL LIFT PLAN Doc #

Ref Doc GM-OP-001-LRP

Prepered by: Herlander Matos Location


ALNG - Soyo
Position Date

Job Description INCINERATOR DESMANTLING - CHIMNEY REMOVAL

Type Of Lif Simple


Crane Specification Load Details
Manufacturer MANITOWOC weight 11.44 t
Model GROVE GMK 4100-L Dimension lenght m
Gross Load 48 t width/rad 1.5
m
Counter Weight 26.1 t height 2.5
m
Max Net Capacity 100 t Centre of Gravity Central

Radius (min-max) 2,5 - 50 m x m

Boom Lenght (min- 11.65 - 60 m y m


max)

Capacity (max radius) 0.9 t z m

Capacity (min radius) 100 t

Max Outrigger 700% m


Extension

Boom angle (min-max)

Max allowed Wind m/s


Speed
Jibs Used No Lenght m

offset m @

Capacity t

Lifing Details
Load Weight 11.44 t Max Bearing Pressure 300 KN/m²
Main Block Weight 0.567 t Outrigger Extension 100% 7m
Max Outrigger Load
Aux Block Weight
t @ working extension 86.507 t
Lifing Beam Weight t Outrigger Mats dim 4m
Weight of Shackles 0.4 t Pressure under Mats 21.62675 t/m²
Jig/ext Weight t Working Radius 8m
Others t Capacity @ Radius 32 t
TOTAL 12.407 t % Capacity 38.771875 %

Hazzard Analisys
Type of Hazzard verification coments
High Voltage or Yes Disconneted By ALNG
Electrical Hazzards
Obstruction to Lif or
Swing N/A

Ground Condition N/A will be used standard Bearing Values BS:8004 for stiff clays
Process Lines Yes Disconneted By ALNG
Water Drain and Pipes Yes Cleared by ALNG

Rigging Accessories
Equip Dimension Equip Dimension
Chain Slings 2 x Chains Slings x 10 mm Beams
Wire Slings Shackles
Web Slings Other

Personal Required
Role Full Name Signature
Team Leader Rui Lopes
Crane Operator
Rigger
Addition Personnel

Method Statement Extended Attached yes


Activity (sequential) Description
Name signature data
Prepered By Herlander Matos
Revised By
Approved By (Lifting
Eng)
Gross Load Calculation value Unit Crane Utilization
Net Load 11.44 t Gross Load
Accessories 0.4 t 2 SWL @ radius worked
1
Hook Block 0.567 t Utilization
Jib (extended or Stored) t
Gross Load 12.407 t

Crane Selection value Unit Crane Matt Calculation


Conterweight 26.1 t Weigth of Crane
Boom Length Used 28.25 m Conterweight
Length of fly Jib Used m Crane Gross Load
3 Angle of Fly Jib Ground Bearing Allowance
4
Maximum Radius @ Boom 8m Minimum Area Required
Length Used
SWL @ Radius Used 32 t Actual Area of Mat Size Used
Outrigger spread 7m Dimension (Square)
radius Dimension (Circular )
Actual Bearing Pressure value Unit
Under selected Mat
5 Maximum Point Loading 86.507 t
Area of Mat to be used 4 m²
Resulting Pressure 21.62675 t/m²
value Unit
12.407 t
32 t
38.77188 %

value Unit
48 t
26.1 t
86.507 t
300 KN/m²

2.828779 m²

4 m²
1.681897 m
0.948847 m
Pre-Lif Check List
Item YES NO N/A COMMENTS
Crane Inspection
Rigging Inspection
Crane Setup
Overhead hazzard Check
Swing Check
Counterweight check
Operator Qualification
Signal Person Qualification
Rigger Qualification
Load Chart in Crane
Load Test
Tag Lines
Wind Condition
Traffic Hazzard Check
Site Control
SIMOPS check

Signatures
Team Leader
Crane Operator
Rigger
Jibs lift outrigger
Yes Simple 0
No Complicated 50%
Complex 100%

offset COG Hazzard


Yes Central Yes
No Offset No
N/A

Method statement
Simple yes
Extended no