Pressure Test Form

This document is a pressure test certificate for an electrical installation by HCY Engineering Services. It details the megger and pressure tests conducted on the circuit's phases and earth connections. The tests were performed according to regulations and witnessed by the client, with no issues found.

Uploaded by

Sopi Labu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Pressure Test Form

This document is a pressure test certificate for an electrical installation by HCY Engineering Services. It details the megger and pressure tests conducted on the circuit's phases and earth connections. The tests were performed according to regulations and witnessed by the client, with no issues found.

Uploaded by

Sopi Labu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Borang H (JPE)

PRESSURE TEST CERTIFICATE

Company Name HCY ENGINEERING SERVICES SDN BHD


( Electrical Services Contarctor )
Registration No ( TKL ) KPE / 458444M / 2006
Address NO.11, JALAN 9/152, TAMAN PERINDUSTRIAN OUG,
BATU 6, JALAN PUCHONG, 58200 KUALA LUMPUR

Client
Installation

Circuit
Pressure Test On

Reference No :

1. Meggertests (Megohms) Using 1000V Megger

Red & Earth : Red & Yellow :


Yellow & Earth : Yellow & Blue :
Blue & Earth : Blue & Red :

Note : Phase Colour Markings : Checked/ Not checked

2. PRESSURE TEST
(a) Between Red - Yellow - Blue and Earth/ Red and Yellow - Blue - Earth
Applied : KV DC/AC for Minutes
Time Started : p.m Leakage: mA final
.
(b) Between Yellow and Red - Blue - Earth/ Yellow and Red - Blue - Earth
Applied: KV DC/AC for minutes
Time Started : a.m/p.m Leakage: mA final

(c) Between Blue and Red - Yellow - Earth/Blue and Red - Yellow - Earth
Applied : KV DC/AC for minutes
Time Started : a.m/p.m Leakage: mA final

(d) Test across contacts with one side earthed and VCB opened
Applied : KV DC/AC for minutes
Time started: a.m Leakage : mA final

COMMISSIONING
RECALIBRATION
Tested By : Remark :

IR Tan Chee Kian Witness ( client ) by:


( Electrical Service Enginneer JP-T-2-B-0047-1995 ) Name :
Date :

Date :
* Note: Protection relay and device shall be tested and calibrated at least once in every two years.

You might also like