0% found this document useful (0 votes)
653 views7 pages

Synchro Check Relay Test Repor

Refernbce format

Uploaded by

aravindhana1a1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
653 views7 pages

Synchro Check Relay Test Repor

Refernbce format

Uploaded by

aravindhana1a1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 7
‘SITE ACCEPTANCE TEST FORMAT FOR SYNCHRO CHECK RELAY ~ RMS-2SY212 recieNT: reece Gee Gerrteay WeseCemorten (CONSULTANT: iE THAIN CONTRACTOR SIEMENS ENERGOPROJEKT — QATAR POWER TRANSMISSION SYSTEM EXPANSION | Contract No GroeKsA2016 PHASE 12 SUBSTATIONS - PACKAGES 1, 92, 86887 [paw 02012017 Name ofSubstaion > (9018/11 KVWAKRAH REPALCEMENT SS [Bay Number 415V LVAC = ABO Name of Eaupreit 1 256-SVHHCH CHECK RELAY Manufactver = SIEWENS List of Content Sl.No Description Page No 1 Relay Oatalls 2 2 vrodtais 2 3 Wisval Check, 2 4 Watchdog Contact Checks. 2 s Measured Value Test. 3 5.4, VT Measurement 3 6 Synchro check test 3 6.1, LVAG-Synch Check Relay... 3 6.1.1 Voltage Difference 4 6.1.2 Phase Angle Difference 4 6.1.3 Frequency Difference 4 6.1.4 Energzation (Threshold) Check 5 6.1.5 Synchro Block Check. s 7 Binary Inputs Test 5 & Binary Outputs Test 6 LED Indication Test 6 10 Scheme Check 7 11 Instruments Used 7 SIEMENS ENERGOPROJEKT-ENTEL | KAHRAMAR ete a4 sone | Name M.Shaker - Name M.Umapathy. Date (02/0172017 Date 02/0172017 | DociNo. | PHI2 Vi (V)= 5.0 Setting Vi < Vs (V) = 0 Range: 2V to 4aV in 0.5 V steps Bus i vokage | Une VEvaone | vag gee vot (ots) (volts) Expected actual av = 5 Since syne O« Vi= 110 AV =5.2 ‘Sync Fail ‘Sync Fail vis no a aa sync sync 0« v= 10 aves syne Fil syneFeil 105.2 AV =4.8 Sync Ok ‘Sync Ok “V.= 105 viento aves sync Fa syncFall viens venta aves syne Ok sync Oe 1152 vente aves Sync Fi Smell Acceptance Norm: Tolerance iV of AV — SEMENS- ENERGOPROJEKT/ENTELT KAHRAWAA Sonaure | > somue | po [name | M.Shaker Name | M.Umapathy _ tate | e2nwa017 nie | e2nva017 Doc No. _| PHI2-3A-10-36-P041 Rev. 0 Annexure [1 Page No. 30f7 SITE ACCEPTANCE TEST FORMAT FOR SYNCHRO CHI |ECK RELAY ~ RMS-28Y212 ec [SONSULTANT: WAI CONTRACTOR ramon Ul A Mapilenats gl ME ENERGOPROJEKT wr esta nas EEN cam QATAR POWER TRANSMISSION SYSTEM EXPANSION | Comtact No. Groiesaw2014 PHASE 12 SUBSTATIONS - PACKAGES 1, 82, 86&S7 [date (21012017 [Name of Substation 782165/11 KV WAKRAH REPALCEMENT SS Bay Number 415V LVAG - ABO. Name ofEqupment ___258-SYNCH CHECK RELAY Monvlactuer SIEMENS 6.1.2, PHASE ANGLE DIFFERENCE (4a): ‘ba = function: jetting 02 > a1 (°) = 20° Setting o2< a: (°) 20° Range: 5° to 90° In 1* steps Bee Vrsnole S| nev anale eae oid canki (dearee/*) (deoree/*) (degree/*) ~[ Aetuat o1=0° a2 = 20.6 ‘ha = 20.6 ‘Syne Ok a2 = 20.7 ‘Sync Fal ‘Syne Fail a2 = -19.2 | syne ok syne Ok a2 = 19.4 Sync Fail ‘Syne Fail a= 0 7 Syne Ok ‘Sync Ok as= 0° ‘Syne Fail Sync Fall a= 0 ‘syne Ok “sync Ok re Syne Fail ‘Syne Fall Acceptance Norm: Tolerance + 1¢ of Aa 6.1.3, FREQUENCY DIFFERENCE (Af) ‘Af = function setting fi > fr (Hz) = A Setting f< fs (Hz) = 0.1 Range: 0.05 to 2.00Hz in 0.01Hz rraquaney(tt) | Frequency (t2)_|_itterence (40 Swctonaises (Hz) (Hz) (Hz) Expected Actual f= 50.00 Hz f= 50.11 ‘Syne Ok Sync Ok fi = 50.00 He fe =50.12 Syne Fall Syne Fall fi = 50,00 Hz fo =49,89 syne Ok sync Ok f= 50.00 Hz Syne Fail Syne Fal fi =50.11 ‘Syne Ok Syne Ok fz =50.12 ‘Sync Fail ‘Syne Fail f2 =49.89 Sync Ok Syne Ok f=49.88 Syne Fall Sync Fall ‘eceptance Norm: Tolerance 10.05Hz of AF ‘SIEMENS ENERGOPROJEKT-ENTEL / KAHRAMAA Signature aan sonaure | Q-— Name M Shaker Name MUmapathy. vate | ozoveor7 ee Doone | PHI2-3A.1035 POH a oe Pages 4ot7 ecienr car sen Sin oo apr ores Qua Gerlich se Conention NSULTANT: ENERGOPROJEKT TWAIN CONTRACTOR: SIEMENS SITE ACCEPTANCE TEST FORMAT FOR SYNCHRO CHECK RELAY ~ RMS-2SY212 QATAR POWER TRANSMISSION SYSTEM EXPANSION eOMisaeR Os SIGINT PHASE 12 SUBSTATIONS ~ PACKAGES S1,$2,$6&S7 | date 02012017 Name ofSubstaion 1328/11 KV WAKRAH REPALCEMENT SS [Bay Number 416V LVAG ABO Name offquipment_- 256-SYNCH CHECK RELAY Manulactuer SIEMENS 6.1.4, ENERGIZATION CHECK: Minimum Voltage for Synchronisation: Setting of Threshold Vs, Vwithout vltage = 45 oy Setting of Thresnold Vi, Vit voltage =v vi v2 Test for Syne Condition 80 45 | viv anava< | live Bus - Dead tine Ok 45 a5 |_vicana vez | bead Bus - Dead Line Natok | 80 80 | Vir ond Var | Live Bus Line Line Ok 45 80 | Vieandva>_| Dead Bus Live Line Ok 6.1.5, Synchro Function Block SL.No. _| Function Description Tested () | Remarks B.L5.1 | Selected LVAC Line VT MCB Off /Trioned ao WA 5.1.5.2 | Selected LVAC Line VF in Test Postion og WA 5.15.3 | Selected LYAC Bus VT NCB Off / Tipped oO NA 5.1.5.4 | Selected LVAC Bus VT in Test Postion oa 5.1.5.5 _ | V1 Selection Switch S05 in IN Postion oD Wa 7, BINARY INPUT: Binary Input check: BE No, [oF Assigned woos por approved schematic @anings Tesiea(SS) | Remarks 1 Symchroriom check noble a _ 2 Srochvoriem check Stat a > Shnchvoritm check bypass ge enable a 4 emote reset Oo SIEMENS ENERGOPROJEKT-ENTEL) KAHRAMAA Sones ah sonave | Nae | MShaker Wane | N.Umapathy Dae [02012017 pate | oaoweorr Doce | PHI2aA-1036POa1 nev [0 __[ Arnone wi B07 SITE ACGEPTANGE TEST FORMAT FOR SYNCHRO CHECK RELAY ~ RMS-287212 ace SoEUTTANT: TI COMTARCTOR: ENERGOPROJEKT venous no oe a | AE SIEMENS QATAR POWER TRANSMISSION SYSTEM EXPANSION ‘Contract No. GTCIGASA/2014 PHASE 12 SUBSTATIONS - PACKAGES $1, S2, $6 & S7 Date 0210 1/2017 Narre of Subsaton 15268711 RV WAKRAH REPALGENENT SS Bay Number s18V LVAD Nore of Equprert 266-6YNCII CHECK RELAY Warafucuror SIEMENS 8. BINARY OUTPUT: Binary Output check: BONe. __ | BO Assigned to as per approved Schematic drawings Tested (E2) 1 Synchronism check Close IC-1 a Syachronism check Close 8C ‘Synchronism check Close IC-2 QN3 ACB test synch relay OK QHZ ACE test synch relay OK a Ey QUI ACB test syach relay OK a a a a wve Contact | Check Contact change over from NC to NO during Unhealthy LED INDICATION: LED Indication check: LEO No. | LED Assigned to a3 per approved Schem: Tested (1) | Remarks tne | check synch Cove ze [Synch enabie a RED | Synch bypass enabled & 4-RED Healthy Bw S-RED ‘Synchronized a ERED | Under votape cose Bozk B rereen | Heatny ened | senice ‘SIEMENS ENERGOPROJEKT-ENTEL/ KAHRAMAA Sgnature a Sanave | Name [ WShaker Name | MUmapathy one | o2ov20W date | oaioveosr DocNo | PH12-3A.10-36-P04T Rev Q Annexure [1 Page No 6of7 ‘CONSULTANT: Fn A Mays | E ENERGOPROJEKT TEE aHecined ck awe oprtin SITE ACCEPTANCE TEST FORMAT FOR SYNCHRO CHECK RELAY ~ RMS-25Y212 WAINGONTRACTOR: SIEMENS QATAR POWER TRANSMISSION SYSTEM EXPANSION | Contact No. PHASE 12 SUBSTATIONS - PACKAGES St, 82, 86&S7 [pate Name of Substation 132/65/1KV WAKRAN REPALCEMENT SS [Bay Number: 416 LVAC-ABO [name or Eavpment : 258-SYNCH CHECK RELAY Menvfadiwer SIEMENS 10, SCHEME CHECK: Scheme Check: St.No. | Function Description [Tested (21) | Remarks 10. MCB Operation checked for VT Teolation a 10. ‘Synch Check Enable in Auto/tanual a 10. Relay found healthy Ey 11, INSTRUMENTS USED: sh Equipment Calibration due Ag | Description | Make / Model pe Calibration date ues 4 rnjection e_| Omécran 256 Bu627F Isjt0/.6 141017 2 Mutimeter | Fluke 25100177, 20/09/16 27/08/17 Remarks: _ cn ne SIEMENS ENERGOPROJEKT-ENTEL / KAHRAMAA Signature ay sirawe | Nane | WShaker Name | MiUmapathy. bate _| 2012017 bate | 021012017 pn Doe. | Pii23a 1036 POM a oo Baga Tol7

You might also like