Description: Inspection Test Report (ITR)

This inspection test report summarizes the inspection of coatings at a raw water treatment facilities project. The inspection checked for proper substrate preparation, concrete blinding, and membrane application. Several specific criteria were evaluated under each section, including surface alignment, voids or protrusions in the substrate, uniformity of blinding, overlaps of membrane sections, and sealing of joints. The inspection resulted in conditional acceptance, requiring some remedial actions before final approval.

Uploaded by

jay2kay5793
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
990 views2 pages

Description: Inspection Test Report (ITR)

This inspection test report summarizes the inspection of coatings at a raw water treatment facilities project. The inspection checked for proper substrate preparation, concrete blinding, and membrane application. Several specific criteria were evaluated under each section, including surface alignment, voids or protrusions in the substrate, uniformity of blinding, overlaps of membrane sections, and sealing of joints. The inspection resulted in conditional acceptance, requiring some remedial actions before final approval.

Uploaded by

jay2kay5793
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Inspection Test Report (ITR)

Contract No.: REP-BPXO-14-0668 Contract Title: Raw Water Treatment Facilities


Contractor: Sarooj Construction Company Company: BP/Jacobs
RFI No.: ITR No.: KZ01-CW-ITR03-S2V-XXXX
COATING CHECKLIST
Drawing No.: Specification:

Location: Inspection Date/Time:

Inspection Result
Section Description Comment
Yes No N/A

Substrate Preparation,temporary shutter


1

is Surface more than 12mm out of alignment?


1.a
is surface uniform and regular with no voids or
1.b sharp protrusions ?

2 Concrete Blinding

2.a is concrete blinding uniform and monolithic?

is concrete blinding free from large


2.b voides/depressions,loose aggregates or sharp
protrusions?

3 Application

3.a is white HPDE film facing prepared substrate?

is adhesive white coating facing concrete to be


3.b
placed?

was membrane installed in convenient lengths,


3.c
with staggered overlaps?

is membrane overlapped exactly to blue guideline


3.d
to prevent fish mouth opening?

was release liner removed and side laps


3.e overlapped 75mm to blue guideline and firmly
rolled?
have all batten fixing been covered with membrane
3.f
and preprufe tape HC?

has preprufe CJ Tape HC and Adcor 500T been


3.g
installed at all construction joints?
were the cut and end laps overlapped 75mm and
3.h
sealed with preprufe tape HC?
4 Junction and Termination

does the junction between preprufe 300R and


4.a bituthene 8000HC have recommended 150mm
overlap?

has the overlapping membrane to adjacent salb or


4.b wall pour been temporarily protected from site
works damages?

Note:

Inspection Result: c Accept


c c Conditional Accept c Reject

Inspected by: Sarooj Veolia BP/Jacobs


Name:
Position
Signature:
Date: