Section A
a. Scope – The facilities that we will make use of are quite in adequate condition and
have easy access to them.
ii. The type of services that we will make use of is telecoms networking services and tn
mobile Wi-Fi services as well.
iv. The approximate location of the services are at the college as well as the equipment.
b. Existing telecoms services –we already have tn mobile Wi-Fi and Telecom
services already on the college premises to make use of for the conference.
d. Power and environmental services –the Architecture building has sufficient mains
outlets but how ever a bit more will be added to a few rooms and environmental
services to accommodate the conference are however a bit of a little fixing up needed to
get to its proper use of them.
e. Building structure – there are about 6 rooms and one very far as it is at the next
campus and there rooms that are near each other are not set to make going to them
easy to find and under number of rooms, type of rooms, purpose of accommodation
required to meet the conference’s needs.
Section B
external:
- 2x Existing CW1308b telephone feeds
- Existing fibre optic cable feed.
Internal:
- 2x Existing fibre optic cables
- Existing CW1308 telephone feed
external:
- Sports Centre
- Architecture BDF
- Architecture building
Internal:
- room 1.21
- room G22
external:
-320 pair telephone feed spare capacity= 60%
-100 pair telephone feed spare capacity= 20%
-16 core fibre optic cable spare capacity= 75%
Internal:
-50 pair telephone feed spare capacity= 20%
-8 core fibre optic cable spare capacity=75%
-16 core fibre optic cable spare capacity=75%
d.Current utilisation of existing external/internal feeds for voice and data
services:
external:
-40% in use (320 pair telephone feed)
-80% in use (100 pair telephone feed)
-25% in use (fibre optic cable 16 core).
Internal:
-80% in use (50 pair telephone feed)
-25% in use (fibre optic cable 8 core).
-25% in use (fibre optic cable 16 core).
e.Current utilisation of existing data racks within Architecture:
-80% in use (50 pair telephone feed) Architecture data rack in room 1.21
-80% in use (50 pair telephone feed) Architecture data rack in room G22
Section C
a) Cost of materials
External:
320 pair telephone feed of N$11000.00
16 core fiber optic cable of N$12500.00
Internal:
50 pair telephone feed of N$5000.00
8 core fiber optic cable of N$4200.00
External:
For the outside work its N$30000.00 which include dismantle of roof work cabling and
ground work cabling and fixing everything afterword’s
Internal:
The college has a internal set up that’s well optimize so its cost is less with N$9500.00