Istaru-Booni Hydropower Project (72 MW) : Calculation Sheet Rev:0 Contract:Feasibilty Study of
Istaru-Booni Hydropower Project (72 MW) : Calculation Sheet Rev:0 Contract:Feasibilty Study of
Istaru-Booni Hydropower Project (72 MW) : Calculation Sheet Rev:0 Contract:Feasibilty Study of
Contract:Feasibilty Study of
52 MW Istaru-Booni
Hydropower Project By: Qurat-ul-Ain Date:15-08-2013
Component: INTAKE/INLET
Feature:Determination of Inlet
size, submegence and top & Checked: M.Iqbal
invert levels Gill Date:15-8-2013
Optimized
Design Discharge for Power Qdesign 94 Cumecs Discharge
18.8 Cumecs
Qtotal=Qdesign
Total Discharge Qtotal 112.8 Cumecs +Qflushing
Contract:Feasibilty Study of
52 MW Istaru-Booni
Hydropower Project By: Qurat-ul-Ain Date:15-08-2013
Component: INTAKE/INLET
Feature:Determination of Inlet
size, submegence and top & Checked: M.Iqbal
invert levels Gill Date:15-8-2013
Say W 6.3 m
Ht of Inlet H 3 m
Vinlet=Qinlet/Aone
Velocity in one inlet=Q/A Vinlet 2.98 m/sec inlet
3of 3
Contract:Feasibilty Study of
52 MW Istaru-Booni
Hydropower Project By: Qurat-ul-Ain Date:15-08-2013
Component: INTAKE/INLET
Feature:Determination of Inlet
size, submegence and top & Checked: M.Iqbal
invert levels Gill Date:15-8-2013
Submergence required to
prevent Vortex formation
S/d 1.21
S/d=C'(V/√gd)=
C'F
ASCE/EPRI
Submergence S 3.63 m Guides 1989
Say 3.70 m