Axis: 1 Storey: 2: Bending (Top Edge) ..
Axis: 1 Storey: 2: Bending (Top Edge) ..
Axis: 1 Storey: 2: Bending (Top Edge) ..
ROOF BEAM DESIGN Orion Building Design System 18.0 (04.2012) / Page: BD-1
Axis: 1 Storey: 2 Material: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))
2B26 L=1970mm 2B25 L=4280mm
BwxH (mm) 250 x 1050 250 x 1050
Flange BfxHf 0 x 0 - 120 x 150 0 x 0 - 280 x 150
7.856.776.696.636.666.676.67
6.3 6.48 5.69
2.24 6.65 6.656.475.98
5.46 5.07
4.23 1.56 1.8 1.85 1.621.941.911.9 1.9 1.911.91 1.9 1.9 1.851.711.453.16
1.38 1.21 0.9 0.620.22
0.4 0.180.06
Loads Q=-0.09 0.39 0.67 0.98 1.3 1.58 1.97
G=-0.32
UDL G=6.06 Q=0.19 kN/m UDL G=6.06 Q=0.19 kN/m
44.078
8.473
Shear
Force
(Env.)
-26.736
-39.638
Moment
(Env.)
-25.311
-60.942
Bending (Top Edge) ...
M (kN.m) 0.0
d (mm) 1007.0
K/K' 0.00
x (mm) 111.89
As (mm2) 0.00
As' (mm2) 0.00
As-min 592.20 592.20 592.20 592.20 592.20 592.20
Bending (Bottom Edge) ...
M (kN.m) 9.5 24.7 25.3 48.4 60.9 29.2
d (mm) 1007.0 1007.0 1007.0 1007.0 1007.0 1007.0
K/K' 0.01 0.02 0.02 0.04 0.05 0.02
x (mm) 111.89 111.89 111.89 111.89 111.89 111.89
As (mm2) 24.94 64.64 66.14 126.54 159.26 76.35
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 387.45 387.45 387.45 387.45 387.45 387.45
Shear and Torsion Design ...
Vd (kN) 26.7 8.5 39.6 44.1
Vd @d(kN) 10.9 8.5 15.3 27.9
v (N/mm2) 0.11 0.03 0.16 0.18
vc (N/mm2) 0.42 0.42 0.42 0.42 0.42 0.42
v-max (N/mm2) 4.38 4.38 4.38 4.38
Vnom (kN) 315.9 315.9
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links T10-300 T10-300 T10-300 T10-300 T10-300 T10-300
Deflection Check ...
L/d 1.96 < 55.85 OK 4.25 < 55.85 OK
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 603.19 603.19 603.19
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Top Bar 3T16 3T16
Top SupBar 3T16 3T16
Top SupBar
Project: L1267_NBC_IKEJA_PLANT_UPS_ROOM
UPS BUILDING AT NBC IKEJA PLANT, IKEJA SO&P Consulting Limited (*1CM-4XLU-UH28-PFQS)
ROOF BEAM DESIGN Orion Building Design System 18.0 (04.2012) / Page: BD-2
Axis: 2 Storey: 2 Material: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))
2B28 L=1970mm 2B27 L=4280mm
BwxH (mm) 250 x 500 250 x 500
Flange BfxHf 120 x 150 - 120 x 225 280 x 150 - 280 x 225
27.48 25.95
24.89 27.05
26.66 26.6725.8924.16
16.55 19.72 19.95.796.016.166.246.16 6 5.6321.7718.52
6.42
11.45 4.67 4.65 5.12 4.4114.53
6.53 2.83
3.98 3.5310.023.48
0.45 1.7 2.5
0.2 0.97
45.029 51.997
Shear
Force -1.735
(Env.)
-104.234
32.019 35.468
Moment
(Env.) -0.587
-76.929
Bending (Top Edge) ...
M (kN.m) 4.8 17.0 32.0 35.5 0.0
d (mm) 457.0 457.0 457.0 457.0 457.0
K/K' 0.02 0.07 0.13 0.15 0.00
x (mm) 50.78 50.78 50.78 50.78 50.78
As (mm2) 27.60 97.92 184.38 204.24 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 369.00 369.00 369.00 369.00 369.00 369.00
Bending (Bottom Edge) ...
M (kN.m) 0.5 0.6 30.3 76.9 37.1
d (mm) 457.0 457.0 457.0 457.0 457.0
K/K' 0.00 0.00 0.04 0.10 0.05
x (mm) 50.78 50.78 50.78 50.78 50.78
As (mm2) 2.94 3.27 174.60 442.99 213.90
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 184.50 184.50 184.50 253.00 253.00 253.00
Shear and Torsion Design ...
Vd (kN) 10.2 45.0 104.2 52.0
Vd @d(kN) 10.2 23.5 76.0 49.5
v (N/mm2) 0.09 0.39 0.91 0.46
vc (N/mm2) 0.47 0.47 0.47 0.47 0.54 0.54
v-max (N/mm2) 4.38 4.38 4.38 4.38
Vnom (kN) 149.9 157.7
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links T10-300 T10-300 T10-300 T10-300 T10-300 T10-300
Deflection Check ...
L/d 4.31 < 57.46 OK 9.37 < 41.2 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Top Bar 2T16 2T16
Top SupBar 2T16 2T16
Top SupBar
Side Bars
Project: L1267_NBC_IKEJA_PLANT_UPS_ROOM
UPS BUILDING AT NBC IKEJA PLANT, IKEJA SO&P Consulting Limited (*1CM-4XLU-UH28-PFQS)
ROOF BEAM DESIGN Orion Building Design System 18.0 (04.2012) / Page: BD-3
Axis: 5 Storey: 2 Material: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))
2B29 L=6250mm
BwxH (mm) 250 x 1050
Flange BfxHf 600 x 225 - 0 x 0
18.52 20.37
19.89 19.92
18.51
16.12
13.51 16.16
4.234.334.243.94 13.5
9.81 3.433.94 3.442.87
9.69
5.72.092.88 5.77
2.06
1.16
G=0.33 1.21 1.22 0.33
1.23
Q=0.070.25 0.26 0.07
Loads -0.43 5 -0.43
-2 -2
UDL G=5.83 Q=0.19 kN/m
86.704
Shear
Force
(Env.)
-86.693
Moment
(Env.)
-172.656
Bending (Top Edge) ...
M (kN.m) 0.0
d (mm) 1007.0
K/K' 0.00
x (mm) 111.89
As (mm2) 0.00
As' (mm2) 0.00
As-min 592.20 592.20 592.20
Bending (Bottom Edge) ...
M (kN.m) 84.1 172.7 84.1
d (mm) 1007.0 1007.0 1007.0
K/K' 0.07 0.15 0.07
x (mm) 111.89 111.89 111.89
As (mm2) 219.69 451.20 219.68
As' (mm2) 0.00 0.00 0.00
As-min 531.30 531.30 531.30
Shear and Torsion Design ...
Vd (kN) 86.7 86.7
Vd @d(kN) 73.5 73.5
v (N/mm2) 0.34 0.34
vc (N/mm2) 0.42 0.42 0.42
v-max (N/mm2) 4.38 4.38
Vnom (kN) 315.9
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links T10-300 T10-300 T10-300
Deflection Check ...
L/d 6.21 < 31.88 OK
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19
Bottom Edge 603.19 603.19 603.19
Steel Bars ...
Top Bar 3T16
Top SupBar
Top SupBar
Project: L1267_NBC_IKEJA_PLANT_UPS_ROOM
UPS BUILDING AT NBC IKEJA PLANT, IKEJA SO&P Consulting Limited (*1CM-4XLU-UH28-PFQS)
ROOF BEAM DESIGN Orion Building Design System 18.0 (04.2012) / Page: BD-4
Axis: A Storey: 2 Material: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))
2B21 L=2500mm 2B22 L=3130mm 2B23 L=5500mm
BwxH (mm) 250 x 1050 250 x 1050 250 x 1050
Flange BfxHf 150 x 150 - 0 x 0 190 x 225 - 0 x 0 350 x 225 - 0 x 0
22.47 21.59
21.21
19.85 19.18 22.56
22.37 22.49
22.45 22.4622.4 22.51
22.46 22.89
22.56 22.64
22.29
22.19
20.08
15.23 17.2218.74 4.78 4.824.744.72
4.764.84.784.784.784.774.784.794.84.87
5.89 9.08 12.51 3.24 3.66 3.99 4.22 4.084.514.59 4.27
0.84 2.73
5.23
1.68
5.22 2.78 0.8 1.67 5.39 1.93 2.66
0.24 0.78
1.49 1.49 0.79 0.23 0.36 1.15
Loads 0.25 0.5
Q=-0.150.25 0.86 1.25 1.64 2 2.25 -0.29
2.5 -0.54
-0.24 0.31 0.63 0.92 1.23 1.57 1.9 2.21 2.5 2.82 3.13 1.1 5.5
G=-0.51 -1.01
-1.26 -2.53
UDL G=6.06 Q=0.19 kN/m UDL G=5.83 Q=0.19 kN/m UDL G=5.83 Q=0.19 kN/m
144.012
62.299
35.649
Shear
Force -10.776
(Env.) -36.784
-121.347
140.112
78.069 72.315
43.064 42.29
Moment 22.093
(Env.) -5.169 -16.041
-89.516
Top SupBar
Project: L1267_NBC_IKEJA_PLANT_UPS_ROOM
UPS BUILDING AT NBC IKEJA PLANT, IKEJA SO&P Consulting Limited (*1CM-4XLU-UH28-PFQS)
ROOF BEAM DESIGN Orion Building Design System 18.0 (04.2012) / Page: BD-5
Axis: A Storey: 2 ... Material: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))
2B24 L=5630mm
BwxH (mm) 250 x 1050
Flange BfxHf 360 x 225 - 0 x 0
G=26.16
22.89
22.44
22.31
22.362221.8421.43
20.69
19.74 16.59
Q=5.57
4.87
4.77 4.764.684.654.564.4 4.218.43
4.75 14.33
3.923.53 11.46
3.052.44 8 4.09
0.19 0.37
1.70.87
0.04 0.08
Loads -0.49
-2.32
UDL G=5.83 Q=0.19 kN/m
60.672
Shear
Force
(Env.)
-147.584
141.473
Moment
(Env.)
-100.784
Top SupBar
Project: L1267_NBC_IKEJA_PLANT_UPS_ROOM
UPS BUILDING AT NBC IKEJA PLANT, IKEJA SO&P Consulting Limited (*1CM-4XLU-UH28-PFQS)
ROOF BEAM DESIGN Orion Building Design System 18.0 (04.2012) / Page: BD-6
Axis: C Storey: 2 Material: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))
2B16 L=2500mm 2B17 L=3130mm 2B18 L=5500mm
BwxH (mm) 250 x 1050 250 x 1050 250 x 1050
Flange BfxHf 0 x 0 - 150 x 150 0 x 0 - 190 x 225 0 x 0 - 350 x 225
22.47 22.58
22.31
21.62
21.23 22.45
22.49
22.47
22.39
22.46
22.49 22.84
22.55 22.7822.2219.97
2.28
17.22 18.7 19.89 19.18
12.43 15.25 3.98 4.23 4.78 4.854.724.74
4.084.524.6 4.754.84.784.784.784.764.784.794.84.86 4.25
5.07 6.02 5.09 5.66 9.05 2.64 3.25 3.66
G=0.250.28 2.88 1.45 1.72 1.46
2.76 0.41 1.02 1.2 1.93
Q=0.070.08 0.82 0.79 0.12 0.22
Loads 0.25 0.5 0.86 1.25 1.64 2 2.25 -0.07
2.5 -0.35
-0.05 0.31 0.63 0.92 1.23 1.57 1.9 2.21 2.5 2.82 3.13 1.1 5.5
-0.37 -1.66
-0.29
UDL G=6.06 Q=0.19 kN/m UDL G=5.83 Q=0.19 kN/m UDL G=5.83 Q=0.19 kN/m
142.62
78.227
28.135
Shear
Force -24.037 -19.793
(Env.)
-124.928
139.136
99.729 89.297
24.333 23.235
Moment -10.587
(Env.) 8.925
-20.972 -15.587 -20.535
-81.845
Top SupBar
Project: L1267_NBC_IKEJA_PLANT_UPS_ROOM
UPS BUILDING AT NBC IKEJA PLANT, IKEJA SO&P Consulting Limited (*1CM-4XLU-UH28-PFQS)
ROOF BEAM DESIGN Orion Building Design System 18.0 (04.2012) / Page: BD-7
Axis: C Storey: 2 ... Material: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))
2B19 L=5630mm
BwxH (mm) 250 x 1050
Flange BfxHf 0 x 0 - 360 x 225
G=26.01
22.9
22.49 22.38
22.27 22.01
21.84
21.43
20.69
19.74 16.59
Q=5.53
4.87
4.78 4.764.684.654.564.4 4.218.43
4.74 3.923.5314.3
11.44
8.08
3.042.44 4.13
1.72 0.11 0.37
0.88
0.02 0.08
Loads -0.49
-2.32
UDL G=5.83 Q=0.19 kN/m
61.016
Shear
Force
(Env.)
-147.234
139.576
Moment
(Env.)
-101.686
Top SupBar
Project: L1267_NBC_IKEJA_PLANT_UPS_ROOM
UPS BUILDING AT NBC IKEJA PLANT, IKEJA SO&P Consulting Limited (*1CM-4XLU-UH28-PFQS)
ROOF BEAM DESIGN Orion Building Design System 18.0 (04.2012) / Page: BD-8
Project: L1267_NBC_IKEJA_PLANT_UPS_ROOM