222 34-10-7 Well Testing Report DST2

Download as pdf or txt
Download as pdf or txt
You are on page 1of 62

Well Testing eport

R I G "ROSS ISLE" DST NO. 2

Client : STATOIL
Field : GULLFAKS Well: 34110-7
Zone : COOK SAND Date : JUNE/JULY 1983
T 1 client : STATOIL

INDEX

a 1 - TEST PROCEDURE -
2 - MAIN RESULTS -
A N D MEASURING CONDITIONS -
a 3-OPERATING
a 4-SURFACE
E Q U I P M E N T DATA -

a 5 - W EC OL
M PL
LETION DATA -
a 6-SEQUENCE OF EVENTS -
(jil 7-
WELL T E S T I N G DATA -

Flopetrol chief operator Client representative


N am e : GALBRUN/SKAGEN N a m e : KARL GJERDE
- TEST -
I PROCEDURE

DST # 2

AFTER GEOVANN TOP GUN PERFORATES INTERVAL 1833.37 - 1863.37 M I N COOK


ZONE; FLOPETROL RUN I N HOLE TO SET SDP GAUGES.

THE WELL WAS OPENED FOR A CLEAN UP ON A 40/64" FIXED CHOKE ON WHICH
CHOKE IT SHOULD REMAIN DURING ENTIRE now PERIOD. AFTER THE WELL WAS
CLEAN THE FLOW WAS SWITCHED THROUGH THE SEPARATOR.

AFTER ENOUGH INFORMATION WAS GAINED FROM T H I S ZONE, THE SEPARATOR WAS
BYPASSED AND THE WELL SHUT I N BOTH DOWNHOLE AND AT SURFACE FOR A
PRESSURE BUILD UP.

I
AFTER THE PRESSURE BUILD UP, THE CLIENT INTENDED TO DO AN INJECTION
TEST ON T H I S WELL FOR FUTURE PURPOSES.

I .AFTER CLEANING THE SURFACE L I N E S , FILTERED SEAWATER WAS PUMPED DOWN AT


270 ,3/DAY.
THE WELL WAS THEN SHUT I N FOR A FALL OFF AND WHEN PRESSURE WAS
STABILIZED THE PUMPS WERE STARTED AGAIN, T H I S TIME TO PUMP CHEMICALS
ADDED SEAWATER AND RATES WERE INCREASED SEVERAL TIMES. AFTER
INJECTION TEST, A FRACTURE T E S T WAS DONE.
Field : GULLFAKS Page : 3
3ase : NWB well : 34/10-7 Report NO: 83/2301/29b

-MAIN RESULTS -
Tested interval : CXMlK SAND Perforations : 1833.37-1863.37

Bottom hole Well head


Operation Duration pressure pressure Oil prod. rate Gas prod. rate G.O.R.

Units MIN BARA BARG M~ /DAY M3 /DAY M3 /M3

CLEAN UP
40164" POS

MAIN FLOW
40164" POS

BUILD UP

1ST INJEC-
TION

FALL OFF

2ND INJEC-
TION ON
DIFFERENT
RATES

Depth of bottom hole measurements : L828C60- Reference : RKB


Temperature : 75.6OCf ~ O W ~ ~ $ ~ C1828.60
S I gpth
Separator gas gravity (air : I)at choke size :
0.681 40164" FIXED CHOKE

gravity at choke size 0.8264 40164'' FIXED CHOKE

BSW : 0 - Water cut :--


0
- -
REMARKS AND OTHER OPERATIONS

ALL FIGURES ARE LAST DATED I N THE EVENTS,


BOTTOM HOLE PRESSURES TAKEN FROM SDP NO. 82014
Base : NWB I
Field : GULLFAKS
Well : 34/10-7
4
No:w ? n n 1 / 7 4

- OPERATING AND MEASURING CONDITIONS -


A - TYPE OF GAUGE -
BOTTOM HOLE :
Pressure : 2 x SDP 10000 P s i 3 x SPERRY SUN
Temperature : 2 X SDP 0-150°F 3 x SPERRY SUN

WELL HEAD :
Pressure ~ 0 ~ ~ an f ~;non -
t n P ~G IDW 0-10000 PSI SPERRY SUN MR. SIX
Temperature : FOXBORO 0-200°F

SEPARATOR :
Pressure : BARTON 0-1 500 PSLG, O- 00 H
W
Temperature : 0-30O0F

B - PRODUCTION RATE CONDITIONS AND SOURCES -


O I L PRODUCTION RATE
0 Tank Floco R_eeLegee_ _c o_ndLt isn_ss, -
Sh$ n_kggge -mga&u~emect,
3 Meter 0 Separator Q W i t h tank
Dump Rotron IJ Atmospheric t]W i t h shrinkage
0 pressure 60-F tester

GAS PRODUCTION RATE


Orifice meter - ---
----conditions,
Standard

14.698 PSI
59°F
WATER PRODUCTION RATE
Tank

C- WELL DATA -
WELL STATE DURING SURVEY =
Well producing through : 3 1/2 tubing /*DtfKprW IWSM8
Main casing size 7" set at WFIII.IFaD Total w e l l d e p t h
Tubing s i z e 7.75" I.D. set at Packer R T ' Z S T ' Z S s eatt - l l W A l l
~_etoOya coEsL
, Zone COOK F r o m A 3 3 . 3 7 t o l K U . 7 From to
- Zone From to From to

WELL STATE BEFORE TEST : RE-ENTRY

Well closed since


owell f l o w i n g since Producing zone
Choke size
FL T 1client :STATOIL

Field ,
-
a
: :5
Base : NWB N':&1/7301 /7(

RFACE EQUIPMENT LAYOUT -


- WELL COMPLETION DATA ,

RTTS CIRC. VAL\

820 -69 YETERS

--
I
Client : STATOIL f action : 5
Field : GULLFAKS h ge : L
Base -:- NWB -
Well : 3W0-7 Report N':=

- WELL COMPLETION DATA ,

! l ! l l l l , l ! l i ! l l l i l l !
l i l l l l ! i 1 ! ! ~ l ! . i i i '
l i l ' l l l l l l l l ! 1 1 1 1 1 1 1

DATUM

REMARKS ,;

CLEARANCE BETWEEN TOP OFF M.P.RAMS AND COLLAR ON SLICK JOINT = 39 CM


CLEARANCE FROM TOP OFF UNLATCH POINT TO BOTTOM OFF SHEAR RAMS = 24 CM
TIME OPERATION

CREW LEAVE STAVANGER TO BERGEN - STANDBY IN BERGEN.


A. GALBRUN, TERSE AASLAND, STEVE BREZINA, A. TURTON
ARRIVE ON RIG.
INSTALLATION OF LODGE BOXES ON BOTH BURNERS.
FUNCTION TEST OF LODGE BOX.
INVENTORY AND OVERALL CHECK OF FIXED EQUIPMENT.
ALL EQUIPMENT ARRIVE WITH SUPPLY BOAT.
RIGGED UP RUPTURE DISC ON SEPARATOR.
RIGGED UP RUPTURE DISC ON STEAM EXCHANGER.
-- -

FIXED UP VALVE ON SIDE GLASS SEPARATOR.


RIGGED UP FLOWLINE TO PRESSURE TEST FIXED SURFACE
EQUIPMENT.
RIGGED UP FLOWHEAD.
RIGGED UP LUBRICATOR VALVE.
START PRESSURE TEST OF FIXED SURFACE EQUIPMENT ACCORDING
TO AND SUPERVISED BY STATOIL.
END OF PRESSURE TEST. ONE LEAK OBSERVED ON RIG VALVE.
PRESSURE TEST AND FUNCTION TEST OF LUBRICATOR VALVE: TEST
OK.
CALIBRATION OF FLOCO AND ROTRON METER.
END OF CALIBRATION.
--

RIG UP EZ-TREE.

PRESSURE TEST OF FLOWHEAD.


PRESSURE TEST OF EZ-TREE.
PRESSURE TEST OF CHOKE MANIFOLD.

PRESSURE TEST OF GLYCOL INJECTION UNIT.

INSTALLATION OF LAB CABIN.

INST- OF =CE W N C
TIME OPERATION

INSTALLATION OF GAS SUPPLY ON BURNER.

PRESSURE TEST OF CHOKE MANIFOLD (CONTINUED). OK

CALIBRATION OF FOXBORO.

CALIBRATION OF BARTON.

INSTALLATION OF DEGASSING UNIT.

TIDY UP EQUIPMENT.

REST OF CREW, 0 . SKAGEN, G. HEITMAN, A. ENDEBAKEN,


K. VARGEVIK, A. AUSTLID ARRIVE RIG,

RIGGED UP OF PRESSURISATION UNIT FOR LAB CABIN.

RIGGED UP OF RUPTURE D I S C OM STEAM EXCHANGER.

RIGGED UP OF SDP GAUGES AND CHECK. OK.

TEST OF GEOVAN F I R E BAR. SPACE OUT I N FLOPETROL

FLOWHEAD. OK.

PRESSURE TEST OF 1502 CHICKSANS TO 5000 PSI.

FLUSHED COOLING WATER THROUGH BURNERS.

P I C K UP FLOWHEAD TO TORQUE UP CONNECTIONS + SINGLE.


FLOWHEAD ON PIPEDECK.

P I C K UP LUBRICATOR VALVE AND PUP J O I N T S TO BE TORQUED

UP.

LUBRICATOR VALVE ON P I P E DECK.

P I C K UP EZ-TREE + PUP J O I N T TO BE TORQUED UP.

EZ-TREE TORQUED UP AND RUN I N HOLE FOR DUMMY RUN.

CLOSE MIDDLE P I P E RAMS. POOH.

EZ-TREE ON SURFACE,

EZ-TREE ON PIPEDECK.
-
- - - - - -- -

BUNDLE CARRIER WITH SPERRY SUN GAUGES ON STRING.

BUNDLE CARRIER WITH SPERRY SUN GAUGES I N HOLE.

EZ-TREE ON R I G FLOOR.

FUNCTION TEST LATCH + A AND B LINE.


RUN I N HOLE WITH EZ-TREE.
OPERATION

LUBRICATOR VALVE ON R I G FLOOR.

RUN I N HOLE.

TEST STRING PRESSURE TESTED TO TOP OF LUBRICATOR VALVE.

FLOWHEAD ON R I G FLOOR. R I G UP K I L L AND FLOWLINE.

F I L L L I N E S WITH WATER TO PRESSURE TEST DOWN HOLE

EQUIPMENT. *

PRESSURE TEST EZ-TREE VALVE.

PRESSURE TEST LUBRICATOR VALVE.

FLUSH FLOWLINE TO BURNERS.

PRESSURE TEST CHOKE MANIFOLD INLET VALVES.

PRESSURE TEST HEATER INLET AND BY-PASS..

PRESSURE TEST CHOKE MANIFOLD DOWNSTREAM VALVES.

PRESSURE TEST BURNERS.

SET PACKER.

START R I G UP SCHLUMBERGER.

CLOSE LUBRICATOR VALVE.

OPEN SWAB VALVE.

OPEN MASTER VALVE.

R I G UP SCHLUMBERGER. TOOL STRING THROUGH BOP..

CLOSE CHOKE MANIFOLD FOR PRESSURE TEST.

OPEN CHOKE MANIFOLD TO BLEED OFF. LEAK I N BOP.

CLOSE CHOKE MANIFOLD.

OPEN CHOKE MANIFOLD.

CLOSE CHOKE MANIFOLD.

PRETEST SCHLUMBERGER BOP TO 2000 PSIG. OK.

PRETEST SCHLUMBERGER STUFFING BOX TO 2000 P S I G . OK.

OPEN CHOKE MANIFOLD.

OPEN LUBRICATOR VALVE.


-- - --

SCHLUMBERGER R I H WITH CCL.

CLOSE CHOKE MANIFOLD.


FLOPETROL

OPERATION

PRESSURED UP TOOL STRING TO 2000 PSI


OPEN LPRN
START RUN THROUGH LPRN VALVE
THROUGH LPRN.
START POOH
ON SURFACE.
CLOSE LUB VALVE
-

BLEED DOWN TO 700 PSIG


SCHLUMBERGER START RIG DOWN.
CLOSE SWAB VALVE
START RIG UP BOP AND LUBRICATOR
CLOSE CHOKE MANIFOLD
CLOSE MASTER VALVE
OPEN SWAB VALVE
START PRESSURE TEST LUBRICATOR TO 2000 PSIG
BLEED OFF. PRESSURE TEST OK
OPEN CHOKE MANIFOLD
CLOSE SWAB vALvE/OPEN MASTER VALVE
LUBRICATOR OFF BOP
GEOVANN FIRING BAR ON SWAB VALVE
LUBRICATOR ON BOP. CLOSE CHOKE MANIFOLD.
PRESSURE UP AGAINST LUBRICATOR VALVE TO 1900 PSIG.
OPEN LUBRICATOR VALVE.
CLOSE KILL VALVE. START BLEED OFF TO 500 PSIG
OPEN SWAB VALVE AND DROP FIRING BAR
CLOSE SWAB VALVE
TOP GUN FIRED
CLOSE LUBRICATOR VALVE

OPEN CHOKE MANIFOLD. BLEED OFF PRESSURE

START RIG UP V.L.


- -

TIME OPERATION

OPEN SWAB VALVE

LUBRICATOR OFF BOP.

GAUGES ON STRING. 1 x S P E W SUN MRPG + 2 FLOPETROL SDP


+ 82014 + * 82016.
OPEN K I L L VALVE

PRESSURE UP TO 1900 P S I ABOVE LUBRICATOR VALVE

CLOSE KILL VALVE

OPEN LUBRICATOR VALVE

START R I H TO SET GAUGES I N "F" NIPPLE.

WIRELINE TOOLS I N LUBRICATOR.

DISCONNECT LUBRICATOR AND R I G DOWN WIRELINE.

CLOSE SWAB VALVE.

OPEN LUBRICATOR VALVE.

OPEN WELL ON 40164" FIXED CHOKE.

GAS BUBBLES AT SURFACE

MUD TO SURFACE

BURNER IGNITED

CRUDE O I L AT SURFACE

SWITCH FLOW THROUGH SEPARATOR.

START SEPARATOR READINGS

SWITCH TO SURGE TANK METER FACTOR + SHRINKAGE

SWITCH FLOW BACK TO BURNER

SWITCH FLOW TO SURGE TANK, PUMP OUT TO BURNER.

SWITCH FLOW TO BURNER.

SWITCH FLOW TO TANK FOR METER AND SHRINKAGE FACTOR.

SWITCH FLOW TO BURNER.

SWITCH FLOW TO TANK. PUMP OUT TO BURNER.

SWITCH FLOW BACK TO BURNER.

SWITCH now THROUGH TANK FOR METER AND SHRINKAGE FACTOR.

SWITCH FLOW BACK TO BURNER.


TIME OPERATION

START 1 S T SET PVT SAMPLES O I L BOTTLE NO. 1509, GAS BOTTLE

NO. A-14747.

F I N I S H 1 S T SET PVT SAMPLES.

START 2ND SET PVT SAMPLES. O I L BOTTLE NO. 1422. GAS

BOTTLE NO. A-14748.

F I N I S H 2ND SET PVT SAMPLES.

BY-PASS SEPARATOR.

SHUT I N WELL AT LPR AND CHOKE MANIFOLD.

EMPTY SURGE TANK.

CLOSE MASTER VALVE.

OPEN CHOKE MANIFOLD AND ADJUSTABLE CHOKE TO BLEED OFF.

PRESSURE ZERO.

OPEN K I L L VALVE AND FLUSH LINES.

STOP FLUSH LINES.

CLOSE CHOKE MANIFOLD AND PRESSURE UP TO 1600 P S I BETWEEN

MASTER VALVE AND CHOKE MANIFOLD.

CLOSE K I L L VALVE.

OPEN MASTER VALVE.

START BLEED OFF TUBING THROUGH CHOKE MANIFOLD TO BURNERS.

PRESSURE ZERO. CLOSE CHOKE MANIFOLD.

OPEN K I L L VALVE.

PRESSURE UP TUBING TO 1600 P S I .

CLOSE K I L L VALVE.

START BLEED OFF PRESSURE THROUGH CHOKE MANIFOLD TO

BURNERS.

PRESSURE ZERO. CLOSE CHOKE MANIFOLD.

OPEN K I L L VALVE.

PRESSURE UP TUBING TO 1600 P S I .

CLOSE K I L L VALVE.
FLOPETROL
- SEQUENCE OF EVENTS (, Continuation )
TIME OPERATION

06:55 OPEN K I L L VALVE.

0 7 :03 START INJECT SEAWATER.

INCREASE PUMPRATE.

INCREASE PUMPRATE.

STOP PUMPING. CLOSE K I L L VALVE AND OBSERVE FALL OFF.

OPEN K I L L VALVE.

START I N J E C T SEAWATER.

START ADDING GHEMICALS.

INCREASE PUMP RATE.

INCREASE PUMP RATE.

ONE PUMP STOPPED DUE TO OVERHEATING.

INCREASE PUMP RATE.

INCREASE PUMP RATE.

INCREASE PUMP RATE TO 7 5 0 l/min.

INCREASE PUMP RATE.

INCREASE PUMP RATE.

STOP PUMPING. CLOSE K I L L VALVE.

CLOSE MASTER VALVE. PRESSURE UP TO 2500 P S I G AGAINST

K I L L VALVE.

OPEN K I L L VALVE.

BLEED OFF PRESSURE THROUGH CHOKE MANIFOLD.

CHOKE MANIFOLD CLOSED. PRESSURE EQUALIZED. MASTER VALVE

OPEN.

START TO BULLHEAD TUBING CONTENT + 500 L I T E R OF MUD INTO

FORMATION.

F I N I S H BULLHEADING.

CLOSE K I L L VALVE.

OPEN APR-M CIRCULATING VALVE.

K I L L VALVE OPEN. START TO REVERSE OUT.

START CIRCULATING.
FLOPETROL

OPERATION

STOP CIRCULATING

START CIRCULATING WITH PIPERAMS OPEN.

STOP CIRCULATING.

CLOSE K I L L VALVE.

P I C K UP TEST STRING TO OPEN HYDRAULIC BY-PASS.

UNSEAT PACKER.

LAND I N WEAR BUSHING.

OPEN K I L L VALVE.

CLOSE K I L L VALVE. CLOSE MIDDLE P I P E RAMS.

BULLHEAD DOWN ANNULUS.

CLOSE MASTER VALVE. OPEN K I L L VALVE. FLUSH THROUGH

SURFACE LINES.

STOP FLUSHING.

CLOSE F A I L SAFE VALVE.

OPEN MASTER VALVE.

START PUMPING SLUGS.

CHOKE MANIFOLD AT P I P E DECK.

WIRELINE BOP OFF FLOWHEAD.

STOP PUMPING SLUGS.

FLOWHEAD AND SINGLE DISCONNECTED FROM TEST STRING.

LUBRICATOR VALVE AT SURFACE.

LUBRICATOR VALVE ON PIPEDECK.

EZ-TREE AT SURFACE.

EZ-TREE ON PIPEDECK.

SDP NO. 82014 AND SDP NO. 82016 AT SURFACE.


No DOP 109

FLOP 1 Client: STATOIL


-
I Section : 7 '

Base : NWB I
- - ---
Field
well
--
:
:
-
GULLFAKS
34/10-7
-

PRESSURE AND TEMPERATURE MEASUREMENTS


-
-WELL TESTING DATA SHEET

PROD RATES AND FLUID PROPERTIES GOR I


: 16
Report N-: 83/2301/29b
I

-- BOT' OIL OR
- CONDENSATE
- - I GAS
T~rne Curnu Temp Rate 1 Gravity ( BSW I Rate I Gravitl
HRS / M M MIN "C I I I

284.14
690

800
0
OPEN WELL THROUGH 41 '64" FIXE CHO

269.19 74 1450 MUD AT ~ R F A c : : .


270.85 82 1800

LIQUID FLOW RATE MEASURING CONDITIONS :


14.73 PSI AT 60°F
TESTED l NTERVAL
DEPTH REFERENCE
:
-.- RKB
COOK SAND 1833.z 1863.37 MFTUZS_ I
DEPTH OF B H MEASUREMENTS :-
1828.60
No.: DOP 110

PRESSURE AND TEMPERATURE MEASUREMENTS PROD RATES AND FLUID PROPERTIES I GOR
BOTTOM HOLE WELL HEAD I SEPARATOR

, ;

100 1677 LEAN FIN1 HED.

c WITCH LOW T OUCH


PJG DOP 1 1 0

I DATE -TIME PRESSURE AND TEMPERATURE MEASUREMENTS PROD RATES AND FLUID PROPERTIES
--
GOR
BOTTOM HOLE I WELL HEAD I SEPA ATOR GAS
-
remp 1Pressure I T g t e d T g press ICg press.lTernp. Press

807.4 .8327 0

801.2

800.5
.8312

SWITCH FI,OW TO SURGE

.8312

SWITCH F:.OW BAqK TO

SWITCH F ~ O WTH*
0

0 q
RNER .
1

128
BURNER,

SWITCH F:AOW
ho DOP 1 l n

I FLOPETROL I -WELL TESTING DATA SHEET-( Continuation I IPage : 20,


Report N-: 83/2301/2d s e c r i o n :
7

04:OO 795 75.6 251.76 127 1596 124 375 810.5 .a264 TRACE 98.9 ,681 122 0 0.5

04:09 804 75.7 251.63 F I N I S 3 2ND SET PVT SAESLES.

[04:10 805 75.7 251.63 127 BY-PALS SEP BATOR.

04:12 8071 75.7 251.63 127 1596 SHUT IN AT LPR-N AND (,I.IOKE Ir'ANIFOLI.

1 75.6 251.60 127 1900

2 75.6 282.16 126 1884

3 75.8 286.53 126 1877

8 76.0 292.02 126 1857


i - -
04:25 13 76.2 294.29 119 1821
ho DOP 110

PRESSURE AND TEMPERATURE MEASUREMENTS I PROD RATES AND FLUID PROPERTIES 1 GOR
TROL I-WELL TESTING DATA SHEET-( Continuation I
'La IPage
Report
: 22
8312301,293
Isection :

1 DATE - TIME. 1 PRESSURE AND TEMPERATURE MEASUREMENTS I PROD. RATES AND FLUID PROPERTIES I GOR I
-------
72.7 310.88 1574

72.7 310.88 1573

72.7 310.88 CLOSE b ASTER VAILVE

72.7 310.88 OPEN CI.OKE MANIFOLD ADJ' 'STABLE CHC KE TO BLEED.

72.7 310.88 0
ho DOP 110

L I
..WELL TESTING DATA SHEET..( Continuation I I Page --- _
24
Report Ne:83/2301129 b -
I~ection : I
I
L I
-WELL TESTING DATA SHEET-( Continuation I
a_.
I
Page ' : 25
Report No: 83/2307/29 p e ~ t i * " :
*" I
I
No DOP 110
No DOP 1 1 0

I FLOPETROL 1 -
-WELL TESTING DATA SHEET-I Continuation 1 1 Page : 27.
NO: 8312301 /2 4 sqction : 1I
PRESSURE AND TEMPERATURE MEASUREMENTS I PROD. RATES AND FLUID PROPERTIES I GOR 1
'LO DOP 1 1 0

PRESSURE AND TEMPERATURE MEASUREMENTS I PROD. RATES AND FLUID PROPERTIES I GOR I
f DATE -TIME. PRESSURE AND TEMPERATURE MEASUREMENTS I PROD. RATES AND FLUID PROPERTIES 1 GOR I
DATE -TIME. PRESSURE AND TEMPERATURE MEASUREMENTS PROD. RATES AND FLUID PROPERTIES 1 GOR I
n7-n7SI3 BOTTOM HOLE 1 WELL HEAD I SEPARATOR
T~me l~umul
PETROL I
I
-WELL TESTING
.
#
DATA SHEET-( Continuation ) I
I
Page : 31
No:83/2301/29 dI ~ e c t i o n : 7
PRESSURE AND TEMPERATURE MEASUREMENTS I PROD RATES AND FLUID PROPERTIES
I FLOPETROL I .-.
-WELL TESTING DATA SHEET-I Continuation 1 I Page :32
Report N-: 8 3 / 2 3 0 1 / 2 ~I ~ e c t i o n : 7
I DATE - T I M E * PRESSURE AND TEMPERATURE MEASUREMENTS ( PROD. RATES AND FLUID PROPERTIES 1 GOR
No.:DOP 110
-
IFLOPETROL I -WELL TESTING DATA SHEET-( Continuation I I
Page : 34
Report N-: 83/2301/29
No.: DOP 110
NO.:DOP 1 1 0
No. : DOP 110

I DATE -TIME
No.: DOP 110

PROD RATES AND FLUID PROPERTIES


NO.: DOP 1 1 0
NO.: DOP l l n
N o . DOP 1 1 0
ho DOP 110
- 43
I FLOPETR L I
-WELL TESTING DATA SHEET..( Continuation I
-4
I
Page
83/2301/2
Jsqction :
1
GOR 1 I
ho DOP 110
NO.: DOP 110

I I

1 DATE - TIME PRESSURE AND TEMPERATURE MEASUREMENTS I PROD RATES AND FLUID PROPERTIES
Well Testing Report
Annexes -
Client = STATOIL
Field = GULLFAKS
Zone = COOK SAND
1 - BOTTOM HOLE PRESSURE AND TEMPERATURE MEASUREMENT -
1.1 - B. H. guge calibration -
1.2 - B. H, pressure calculation -
0 1.3 - B. H. temperature calculation -

2 - LIOUID PRODUCTION RATE MEASUREMENT -


-
2.1 Measurementswith tank -
El 2.2 - Measurements with meter -

Ed 3- GAS PRODUCTION RATE MEASUREMENT -

IXI 4 - SAMPLlNG SHEETS -


-
4.1 Bottom hole sampling -
4.2 - Surface sampling -

Q 'r> - CHARTS AND MISCELLANEOUS-


Section : Annex
I I Field : GULLFAKS n m Innrrv r r r m

-LIQUID PRODUCTION RATE MEASUREMENT -

2.1 - MEASUREMENT WlTH TANK -


Vo=VxK5(1-BSW)

Vo : Net oil volume at 60°F and atmospheric pressure.


V : Gross oil volume measured by tank gauging.
K : Volume correction factor to be applied between the
tank temperature during gauging and 60' F.
BSW : Basic sediments and water.

2.2 - MEASUREMENT WlTH METER -


--

a) Shrinkaqe factor is measured by shrinkage tester.

Vo : Net oil volume at 60' F and atmospheric pressure.


Vs : Gross oil volume measured by meter under separator conditions.
f : Meter correction factor = Volume measured in tank
Volume measured by meter
Shr : Percentage of oil volume reduction between separator and tank
conditions, reported to oil volume at separator conditions.
K :Volume correction factor to be applied between the finale
temperature during shrinkage measurement and 60°F.
BSW : Basic sediments and water.

b) Shrinkage factor i s measured with tank.

Vo, Vs, K and BSW : Same meaning as in a).


(1 Shr') : Shrinkage factor including meter correction factor.
No DOP 120

- OIL PRODUCTION RATE - rsec+ion: Annex I 1


Base :
Date - Time
NWB
Gauge
I Field :
Well :
GULLFAKS
34/IO-7
Tank v o l ~ m e ST0 Gravity
- MEASUREMENT WITH TANK -

Net volume Net ST0


Page :

Cumulative
-
Report NO : 83/2301/29b

-
Time I lntervai 9raduation Volume V Temp. Gravity I Temp. I Grav. 60°F of ST0 Vo product. rate production
RS CM BBLS OF- Idav Units

SWITCH FLOW

37.84

KAGE

KAGE

KAGE

ed
METER F CTOR SHRINKA E = 0.9647

Tested interval :
TANK GRADUATION 0.176 BBL/CM
Perforations :
No DOP 122

I
d

Section : Annex
- OIL PRODUCTION RATE -
- MEASUREMENT WITHMETER - Page : 51
Report No: 83/2301/29b

Meter
reading
1
I
Vs 1
I
BSW II I
1 - Shr
I
I
Gravity
Oil Gravity
I Temp. I Grav. 6 0 ' ~ K
of STO: Vo product. rate production
SCM/M~
GOR
BBLS I BBLS I % 1 BBLS I I OF I BBLS Units

--
93
246

-Shrinkage factor measured by Shrinkage tester 2 Tank FACTOR SHRINK/METER = 0.9169 Tested interval :
* V'o = Vs x f x (1 - BSW) = Net oil volume at separator conditions. f = Perforations :
- GAS PRODUCTION RATE MEASUREMENT by orifice meter -
Reference is made t o t h e rules and coefficients given in AGA gas measurement
Comittee Report No.3 for orifice metering .

a ) EQUATIONS -

Q : Production rate at reference conditions.


C : Orifice flow coefficient .
h w : Differential pressure in inches o f water.
P f : Flowing pressure i n psia.

Fu : Unit conversion factor in desired reference conditions .


F b : Basic orifice factor ( Q in Cu. f t / hour ) .
Fg : Specific gravity factor.
Y : Expension factor
h f : Flowing temperature factor .
FPv: Supercompressibi I i t y factor ( estimated

7
Remarks

Fm:~anometer factor is equal one since only bellows type meters are used
F r :Reynolds factor is considered t o be one.

TABLE OF F u FACTOR
REFERENCE CONDITIONS
UNITS 60°F 0 'C 15'6 15 'C
1 4 . 7 3 psia 760mmHgw 760mmHg * 750mmHg *
Cu.ft /hour 1 0.9483 1.0004 1.01 3 7
Cu.ft / day 24 22.760 24.009 24.3 2 9
m 3 / hour 0.02832 0.02685 0,02833 0.02870
m 3 I dav 0.6796 0.6445 6%%0.6 8 8 9
* Mercury at 32'F

b ) M E T E R DATA-
Meter type ._ DANIELSR.
_ Flange t a p s - P f taken down/up strean
F l o w recorder type: I T T BARTON I D of meter tube : -5,761 "

c SPECIFIC GRAVITY SOURCE,


P Sampling point :- T Gravitometer type : K W +

d ) SUPFRCOMPRESSIBILITY FACTOR Fpv -


A l l coefficients are taken from AGA N X 19 manual for natural gas free of air, C 0 2
and H 2 S .More accurate values could only be determined by laboratory measurement.
No DOP 126

Orif~ce Gas
Y
Gas production I Cumulat~ve
diameter gravity Fb FS rate : 0 Product~on
I
( psla ("of wat.1

BY-PA!
,SURFACE SAMPLING -
Date of sampl~ng: 01.07.83 Service order : Samplrqg No : 1A
Sample nature : OIL Sampling point : SEPARATOR SIGHT GLASS

A, RESERVOIR AND WELL CHARACTERISTICS ,


Producing zone : COOK Perforattons: 1833 - I*6h Sampling interval : SAME

Depth o r i g l n : RKB
:225' IUM
Tubmg Dla
Shoe
. '"
2-75"
"*"
C a s ~ n gDia :.-m-, 6.284"
Surface e i e v a t ~ o n Shoe

Bottom hole h l t l a l pressure : 314.03BARA at depth: 1834.27M date : 30 06 83


0

-
statlc Latest przssure measured : 311-69BARA at depth: 1 8 3 4 0 2 7 ~ date : 02.07.53
condtt tons Temperature : 72.310~ at depth: 1836-77M date: 02-07-83

0 - MEASUREMENT AND SAMPLING CONDITIONS -


Time at whlch sample was taken: 0 2 :52 Time elapsed since stabilisat~on: 5 HRS 5 2

Bottom hole Choke s u e : 4 0 / 6 4 ! ! 1 n c e : 14:4%%h&d pressure : 1 5 9 8 P S 1 h i l head temp : 126OF


n a m c Bottom hole pressure : 2 5 1. 9 9 B m d e p t h : 1834.27M date : 01.07.8
c o n d ~ t ~ o n s Bottom hole temp : 75.6Oc at d e p t h : 1 8 3 6 . 2 7 # d a t e :0 1 . 0 7 . 8
I
Flow measurement of s a m p m g a s ,Grav~ty(a~r
1) : 0.681 - Factor Fpv = -1: 1.0284
Values used for calculat~ons: VZ

BSW: O/Q W L R :
I

Transfermg f l u ~ d: Hg Transfer duration : 29 M I N

F mal condit~onsof the shppmg bottle : 6 0 0 c c H g w i t h d r a w n f o r sample


Pressure : l8OPSIG Temp : 5S°F 70cc Hg w i t h d r a w n f o r gas gap
3 0 c c HE l e f t i n b o t t l e
C, IDENTIFICATION OF THE SAMPLE -
Shipptng bottle No : 1 5 0 9 sent o n : by: Shipptnq- order No :
Addressee :

I
I LIQUID GAS

Bottom hole samples No -1 --- I


Surface samples No

Measurement condit~ons,
Tank. m-
Meter.
a - c o r r e c t e d w ~ t hshrmkage tester. m, a- 3~m;j.
Corrected w ~ r htank.

\Ijsa Cbtef Gpe-a:cr

ALL READINGS FROM 03:30 HRS A. A u s t l i d


SHRINKAGE TAKEN AT SEPARATOR = 8% (Sampler)
Field : G U L L F A K C . - Page : 57
Base :- Well : 34/10-7 - Report N183/2301/29

,SURFACE SAMPLING -
Date of sarnpl~ng: n i - 0 7 - 8 3 Service order : Samplrng No : 1B
Sample nature : GAS Samplrng ~ o m :t - SEPARATOR GAS OUTLET

A - RESERVOIR AND WELL CHARACTERISTICS - SAME


Producing zone : COOK perforat ions : 1833-1863 Sampling interval :

Depth o r i g m =
T:,-ubmg Dia 2-75" Casing Dta 6.184"
Surface e l e v a t ~ o n.225.
. TOM Shoe I Shoe
-:
'

Bottom hole lnittal pressure


statlc Latest prassure measured : 311*69BARA
cond~tions Temperature atdepth: 1834.27M date: 02.07883
A
0 - MEASUREMENT AND SAMPLING
s-astn' -
U-
CONDlTlONS - : 5 HRS 52
T ~ m eat w h ~ c hsample was taken :

Bottom hole Choke s u e :4 0 / 6 4 s ~ n c e :


dvnamrc Bottom hole pressure :
c o n d ~ t ~ o n s Bottom hole temp : 01.07.8
I -.
1.m4
Flow measurement of s a m p M g a 2 ,Gravity (atr 1 :

Tank temperature :
I I
BSW: 0 O
C
II WLR : O O/O
I

Transfermg f l u ~ d: VACUUM Transfer duration : 29-

Fmal conditions of the shigpmg bottle :


Pressure : 380PSIG Temp: 55OF

C, IDENTIFICATION OF THE SAMPLE


S h ~ p p ~ nbottle
g No :
- 7
,
F Shipping order No :
Addressee :

I LIQUID I GAS

Bottom hole samples No

Surface samples No
I I
Measurement cond~trons.
Tank.
m, @, M e t e r .
corrected w i t h shrrnkage tester- m- Corrected D-t h t a r k .
w
Dump.

D - REMARKS -
ALL READINGS FROM 03:30 HRS A. Austlid
SHRINKAGE TAKEN AT SEPARATOR = 8% (sampler)
IFLOPET ect ion :ANNEX

,SURFACE SAMPLING -
Date of sampling : 0 1 .07.83 S e r v ~ c eorder : Samplirlg No : 2A
Sample nature :4TT Sampling pomt : CWV-

A - RESERVOIR AND WELL CHARACTERISTICS ,


Producing zone,
-
n
\
l
n: P e r f o r a t l o n ~ : r ~ ~ - Sampl~ngInterval :

I Depth orlgln :--Tub~ng


:m-
Surface e l e v a t ~ o n Shoe
Dla :
:
a 7 c ~ ~ Casing Dla :
Shoe 1980M

I
Bottomhole l n ~ t ~pressure
al -
: at depth: 1871.77M date:_30.06.83
stat~c Latest przssure measured at depth : 181J.h- 77M date : 02m -83
condit ~ o n s Temperature - 0 ~ at depth: 1 8 W 7 M date: 02-07-83

I B - MEASUREMENT AND SAMPLING CONDlTlONS ,


T ~ m eat which sample was taken :

Bottom hole Choke size :


0 3 :48

40/64&1ce :
Time elapsed since s t a b ~ l ~ s a t ~ o n :

1 4 : ~ pressure:
e ~ ~1596PS1%ll
~ ~ head temp : 1260F
6 HRS 4 8

dvnam~c Bottom hole pressure : 2 5 1 76B- depth: 1834.27M date : 0 1 .07.8


condit~ons Bottom hole temp : 7596OC at depth: 1f W 2 Z K d a t e : Q L n
I
Flow measurement of S a m p K g a s ,Gravity(a~r1 ) : 0.681 FactorFpv=&: 1.0279
Values used for calculat~ons: v7

Transfermg f l u ~ d: HE Transfer durat~on: 2 1 MIN

Final cond~tronsof the s h i ~ p ~


Pressure : 180PSIG Temp:
bottle
g :
55OF II 6 0 0 c c H g w i t h d r a w n f o r sample
70cc Hg w i t h d r a w n f o r gas cap
3 0 c c Hg l e f t in b o t t l e
C- IDENTIFICATION OF THE SAMPLE ,
Sh~ppingbottle No : 1422 sent o n : by:.. Shtpw~ngorder No :
Addressee :

h~.leLmh LIQUID GAS

Bottom hole samples N o -

A-14748
Surface samples No
I
Measurement condit~ons,
Tank. @, M e t e r . B-Durp -
m - c o r r e c t e d w ~ t hshrmkage tes?er. a, Corrected wcrh lark..

D - REMARKS , 3 1 5 a C r , e f Gpcra:c-

ALL READINGS FROM 04:OO HRS A. A u s t l i d


SHRINKAGE TAKEN AT SEPARATOR = 8% (Sampler)
FLOPETROLI Client : STATOIL I ~ e cion
t :ANNEX 42
Field : GULLFAKS
- - Page : 59
Base :NWB Well : 34/10 7 - Report ~9-

-SURFACE SAMPLING -
Date of sampling 01-07*53 Service order : Sam 1v-i No 2B
sample nature -1 Sampling p a n t : ~~ S E E ~ R ~:GKSSOT~GET--
OR

A - RESERVOIR AND WELL CHARACTERISTICS


- - SAME
Producing zone : perforat ions : 1~331863 Sampl~nglnterval :

Depth origin :
Surface elevattonz25 - 70M Tubing Dia :
Shoe :
2-75"
1864M
Casing ~ t :a
S hoe
6-184''
1980M

Bottom hole Inctial pressure ,


314.03BARA ,Idepth: 1834.27M date : 30.06.83
stattc Latest prassure measured :311*69BARA at depth: 1834. 27M date : 02.07.83
condttlons Temperature :72.6*C at depth: 1834.27M date : 02 .07 .83

B - MEASURE&!l$S
'
AND SAMPLING CONDITIONS - 6 HRS 48 1
Time at whlch sample was taken: Ttme elapsed since stabiiisatton:

Bottom hole Choke size :


gvnamcc Bottom hole pressure :
Well head temp :
date :
-
5
conditions Bottom hole temp : 1834.27M date : 01.07.8:
I
Flow measurement of s a m p u g a s ,Gravity (air 1 ) : U.bCI1
Factor Fpv =&,: 1.
vz

nk temperature :
1
1
I

BSW: 0 O/Q W L R : Ole


Transfering fluid : VACUUM Transfer duration : Ll M I N

Fmal condtttons of the shippsg bottle :


Pressure : 1 3 m l ~ Temp: -I
Shipptng bottle No : A
-i41
C, lDENTlFICATlON OF THE SAMPLE
S h l p ~ m gorder No :
,

-
Addressee :
-
bpiedlmlh - LIQUID I GAS

Bottom hole samples No

Surface samwles No

Measurement conditions,
@ Tank. -u-
Corrected w i t h shrmkage tes?er. u- Corrected w t t h tark -

ALL READINGS FROM 04:OO HRS A. Austlid


SHRINKAGE TAKEN AT SEPARATOR = 8%