BHP tr2
BHP tr2
BHP tr2
(LCB (%))/100∙L_PP
LCB dari M
0.3760085934 m dari M
LCB dari FP
0.5 · LPP - LCBM
46.623991407 m dari FP L∙B∙T∙C_B
olume Displasemen
7611.112 m3
Fn = 0.2159381
CB = 0.7244584
at disimpulkan
penambahan
anya mengurangi
penggunaan
ada kapal ini
Va = Speed of Advance
Distribusi Tenaga : = V_S⋅(1−w)
= 5.773
ηO = Open Water Test Propeller Efficiency Brake Horse Power Calculation (BHP)
(J/(2∙n))∙(KT/KQ)
= ; Wageningen B-Series ηR = Reduction Gear Efficiency
= 0.98
= 0.6 PB0 = Brake Horse Power (BHP0)
l Architecture Vol. II hal. 163 =
PS/η_R
ηr = Rotative Efficiency ; Ship Resistance and Propultion
= 0.985 Modul 7 hal. 2 = 1841.354
kW
culation (BHP)
uction Gear Efficiency
kW
= BHP
kW
53.509 ∙ 1.3596 HP
HP
Mesin
Merk = MAN B&W Diesel Engine A/S
Type = S35MC
A = 5058
B = 2100
C = 2637
D = 1953
E = 5925
F = 6425
G = 1900
H = 4375
I = 1032
J = 515
L = 2790
N = 1184
O = 1537
R = 518
S = 702
V = 60
Input Data
11.5∙√(3&PD⁄n_rpm )
D = Diameter Propeler ds =
= 4.118 m = 29.024 cm
nrpm = 110 rpm = 0.290 m
z = 4 blade K = Koefisien Fixed Propeler
AE/AO = 0.4 (𝑑_𝑠/𝐷)∙(1.85∙𝐴𝐸/𝐴𝑂)−(
= (�−2)/100)
PD = Delivered Power at Propeller
= 1768.436 kW = 0.03215
PB = Brake Horse Power Wprop = Berat Propeler
= 2117.557 kW = D3 · K
We = Berat Mesin Induk = 2.24567 ton
= 75 ton Wproptotal = Wgear + Ms + Wprop
= 15.589 ton
Unit Propulsi
Wgear = Berat Gear Box Unit Elektrikal
(0.34~0.4)∙□(64&PB/n)
= Wgs = Berat untuk 2 Genset
= 7.700 ton = 26.2 ton
l = Panjang Poros
= 5 m untuk area gearbox, poros, gangway dsb + Lain - Lain :
1.5 m untuk area gangway
Wot = (0.04 ~ 0.07) · PB
= 6.500 m = 84.70227 ton ton
Ms/l = Berat Poros/Panjang Poros
0.081∙(□(64&PD/n_rpm ))∙□(64&2/3) Berat Total Permesinan
=
= 0.868 ton/m Wtotal = We + Wproptotal + Wgs + Wot
Ms = Berat Poros Propeler = 201.491 ton
= M_s/l∙l
= 1.08395 m
KG = h_db+0.35∙(H−h_db)
= 3.5045675 m
LCB = Panjang Ceruk Buritan
= 5% · LPP
= 4.7 m
LCGFP = LWL - LCB - 5
= 88.06 m
LCGM = - (LCG FP
- 0.5 · LPP)
= -41.06 m
= 36.4309 ton
WFW2 = Cw2 · BHP ; Berat air tawar untuk pendingin mesin
= 14.39515 ton
Diktat IGM Santosa Penambahan 2% untuk
WFW total
= (WFW1 + WFW2)
konstruksi dan 2% untuk ekspansi panas = 50.8261 ton
WFW = WFW total + 2% · WFW total ; terdapat penambahan koreksi 2%
ystem (WLO''+) = 51.84262 ton
ton
W_DO∙KG_DO+W_FO∙KG_FO)/(W_(C&E)+W_FW+W_LO+W_DO+W_FO )
W∙LCG_FW+
G_DO+W_FO∙LCG_FO)/(W_(C&E)
O)
Input Data
LPP = 94 m 4. Anjungan
B = 16.31 m ℓAN = 7.2 m
H = 8m bAN = 10 m
CALV = 170 kg/m 2
; Ship Design for Efficiency and Economy hal. 172 AAN = ℓDH4 ∙ bDH4
untuk Cargo Ship kecil dan sedang : 160 – 170 kg/m2 = 72.000 m2
diambil nilai tengah untuk Cargo Ship ukuran sedang WAN (A_DH4∙C_ALV)/1000
=
LCG1 4. Anjungan
1. Kamar Mesin ℓAN = 7.2 m
WE&O KM = 25% ∙ WE&O WAN = 12.240 ton
asumsi WE&O di Kamar Mesin LCGAN = - 0.5 ∙ LPP + (LKM + LCB) - 0.5 ∙ ℓAN
= 61.784 ton = -27.2 m di belakang
LCGM M = Titik Berat Permesinan terhadap Midship
= -41.06 m LCG2
WE&O DH = 37.5% ∙ WE&O
2. Layer II asumsi WE&O di Rumah Geladak
ℓDH2 = 13 m = 92.675579 ton
0.26 ton/m untuk ukuran
2 WDH2 = 36.045 ton LCG
(W_DH2∙LCG_DH2+W_DH3∙LCG_DH3+
DH = 〖 W_DH4∙LCG 〗 _DH5+W_AN∙LCG_
n Efficiency and Economy hal 172 LCGDH2 = - 0.5 ∙ LPP + (LKM + LCB) - 0.5 ∙ ℓDH2
; untuk ukuran sedang = -30.1 m di belakang M = -28.731619
= -21.039 m di belakang M
= 25.961 m dari AP
= 68.039 m dari FP
M
+ LCB) - 0.5 ∙ ℓAN
di belakang M
〖 W_DH4∙LCG 〗 _DH5+W_AN∙LCG_AN)/(W_DH2+W_DH3+W_DH4+W_DH5 )
di belakang M
Berat Payload
Wpayload = #REF!
KGpayload = (H - hDB) · 0.5 + hDB
= 4.550 m
LCGpayload = (0.5 · LRM) + (0.5 · koferdam) + LCH
= 41.380 m ; dari FP
yload)/(W_ST+W_(E&O)+W_M+W_cons+W_payload )
SV = 1.55
Payload = 8000 ton
Vol. Muatan = Payload ∙ SV
= 12400 m3
∆ Vol. Ruang Muat dan Vol. Muatan
= -6187.097 m3
= -99.58 %
∆ Vol. Ruang Muat dan Vol. Muatan < 5%
Kondisi = Diterima
CB = 0.72445838 = 646539.149 m4
CWP = 0.81087027 BML = IL / ∇ ; jarak B dan M secara melintang
∇ = 7611.11184 m3 = 84.9467413 m
KG = #REF! m 4. GML = KB + BML - KG
LCGLWT FP = #REF! m = #REF!
LCB dari FP = 46.6239914 m 5. Trim ((LCG−LCB)∙L_PP)/GM_L
= ; Parametric Ship Design hal 11 - 27
= 23492.324 m4
= 4122.62502 mm
X = Cpv f = 0.5
Y = faktor h
0.60
f =0 f = 0.5 f = 1.0
X Y X Y X Y 0.50
f(x) = 1.0971592524x^4 - 3.0684652869x^3 + 2.9550318898x^2 - 0.7889130919x + 0.3050260031
0.500 0.333 0.500 0.335 0.5000 0.3351 R² = 0.9999358549
0.40
0.522 0.340 0.516 0.340 0.5106 0.34 0.30
0.581 0.360 0.561 0.360 0.5447 0.36
Y
0.20
0.643 0.380 0.613 0.380 0.5838 0.38
0.706 0.400 0.668 0.400 0.6302 0.40 0.10
f =0 f = 1.0
0.60 0.60
0.50 0.50
f(x) = 1.240907059x^4 - 3.4551355082x^3 + 3.5356220095x^2 - 1.2507295648x + 0.4288283645 f(x) = 0.821549649x^4 - 1.8734526126x^3 + 0.9771628659x^2 + 0.602905867x - 0.0282375791
0.40
R² = 0.9999002048 0.40
R² = 0.9999345118
0.30 0.30
Y
0.20 Y 0.20
0.10 0.10
0.00 0.00
0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10
X X
Y
0.03
c = 0.9772
0.02
d = 0.6029 0.01
e = -0.0282 0.00
0.40 0.50 0.60 0.70 0.80 0.90 1.00
X
0.90 1.00 1.10
Garis 1 Polynomial (Garis 1 )
= 1.0 )
MV. AULIA | Kharis Abdullah Tugas Merancang Kapal 1 ( MN091355)
0.90 1.00 1.10
= 1.0 )
X a = 0.3449
b = -0.9626
Garis 2 Polynomial (Garis 2 )
c = 0.9987
d = -0.3258
e = 0.032
042558461x + 0.0967185953
0.90 1.00
x4 + b x3 + c x2 + d x + e
x4 + b x3 + c x2 + d x + e
Satuan
Panjang ⇨ 1 feet = 0.3048 m
Berat ⇨ 1 long ton = 1.016 ton
= 28.84695929 ft
F = D-T ; lambung timbul rata-rata
= 7.2295052214 ft
A1 = 1.01 ∙ A0 ; area of waterline plane at depth D
= 13515.267387 ft2 maybe estimate from A0 and nature
= 0.056945172
BM0 (C_I∙L_PP∙B_W^3)/(35∙D_0
= )
= 10.0124529 ft
CI ' = a x4
+ b x3 + c x 2 + d x + e
= 0.060365761
BM90( 〖 C′ 〗 _I∙L_PP∙D^3)/(35∙D_0
= )+(L_d∙d∙D^2)/(140∙D_0 )
= 2.283621402 ft
GM0 = KB0 + BM0 – KG
= #REF! ft
G'M0 = KB0 + BM0 – KG’
= 11.24830721 ft
MV. AULIA | Kharis Abdullah Tugas Merancang Kapal 1 ( MN091355)
Perhitungan Lengan Stabilitas
#REF!
0.002035144 Titik
0.553735374 X1 = #REF! Matriks Invers Matrik
#REF! X2 = #REF! 1 35 1225 36 -63 28
#REF! X3 = #REF! 1 40 1600 -1.7 3.2 -1.5
Y1 = #REF! 1 45 2025 0.02 -0.04 0.02
90° Y2 = #REF!
#REF! Y3 = #REF!
#REF!
-0.00407028 Hasil Perkalian Matrik
-0.00264572 a = #REF!
#REF! b = #REF!
#REF! c = #REF!
0° #REF! 0 0
0.8
5° #REF! 57.2957795 #REF!
10° #REF! 57.2957795 0
15° #REF! 0.7
20° #REF!
25° #REF! 0.6
30° #REF!
35° #REF! 0.5
40°
#REF!
45° #REF! 0.4
50° #REF!
55° #REF! 0.3
60° #REF!
65° #REF! 0.2
70° #REF!
75° #REF!
0.1
80° #REF!
85° #REF! 0
0
90° #REF! 0° 10° 20° 30° 40° 50° 60° 70° 80°
Status = #REF!
1 LWL 97.76 m
2 LPP 94.00 m
3 B 16.31 m
4 H 8.00 m
5 T 6.59 m
6 Vs 13.0 knots
7 CB 0.7245
8 LWT 2152.26 ton
9 Power (PB) 3570 kW
10 Jumlah Kru 24 orang
11 Fuel Consumption 73.89 ton
12 Hold Capacity 6213 m3
13 Gross Tonnage 3649 ton
14 Net Tonnage 2070 ton
15 Roll Period 3.84 detik