1) The document outlines a safety pre-task assignment procedure for identifying hazards, required permits, certifications, protective equipment, and emergency procedures for tasks. 2) It includes sections to identify hazards, weather risks, required tools and equipment inspections, material storage areas, applicable safety policies, assigned employees, and a post-task review. 3) The supervisor is responsible for completing the form before each task, posting it conspicuously, addressing deviations from safe work practices, and conducting a post-task review of any incidents or problems.

Uploaded by

Sathiya Seelan
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
434 views

Safety Pre-Task Assignment

1) The document outlines a safety pre-task assignment procedure for identifying hazards, required permits, certifications, protective equipment, and emergency procedures for tasks. 2) It includes sections to identify hazards, weather risks, required tools and equipment inspections, material storage areas, applicable safety policies, assigned employees, and a post-task review. 3) The supervisor is responsible for completing the form before each task, posting it conspicuously, addressing deviations from safe work practices, and conducting a post-task review of any incidents or problems.

Uploaded by

Sathiya Seelan
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

SAFETY PRE-TASK ASSIGNMENT PERMITS / OPERATIONAL CONTROL

PROCEDURES REQUIRED: LADDERS/SCAFFOLDS:


The SPA should be completed daily for each task. Post this Yes No 6. Inspect all scaffolds/ladders before use.
SPA in a conspicuous location throughout the length of the Hot Work Permit Has the scaffold tag(s) been signed?  Yes  No
task. Each crew member involved with the task should sign; Excavation Permit
this SPA. At the end of the task, give this SPA to the Does the ladder(s) have current inspections?  Yes  No
Working at Heights Permit
Project/Site Management. If deviation from known safe Confined Space Entry Permit
work practice/ procedure occurs, work must be stopped. Lifting Permit APPLICABLE PERSONNEL:
Supervisor: ______________Date: ________________ Signs/Barricades OCP 7. Is a fire watch/warden/standby man/flagman/rigger required?
Lockout, Tag out OCP  Yes  No
Location of Task: ______________________________ Scaffolds OCP Name: _____________________________________
_____________________________________________ Risk Assessment
Task Description: ______________________________ Tool Box Talk IN CASE OF EMERGENCY:
_____________________________________________ Other (specify) _______________________________
_____________________________________________ 8. Identify below the location of the nearest
EMPLOYEE/EQUIPMENT CERTIFICATIONS - Assembly area________________________________
Does task require specific training?  Yes  No REQUIRED: - Fire Fighting Equipment_________________________
If yes, what type?
Yes No - First Aid Box_________________________________
_____________________________________________ Plant / Equipment (specify) ____________________
HOUSEKEEPING:
PERSONAL PROTECTIVE EQUIPMENT Plant / Equipment Operator (specify) ____________
REQUIRED: Scaffold Insp./Supv/Erector (specify) ____________ 9. Are trash receptacles/bin/containers/drums/boxes etc.
Yes No Type Rigger 1/2/3 (specify) ____________ available in the work area?
Other (specify) _________________ Location: _____________________________________
Head __________
GENERAL
Eyes -- __________ FALL PROTECTION:
INFORMATION
Face __________ 1. Should Safety/Representative be involved in 10. Have areas been identified as requiring fall protection
systems and have they been installed? (i.e., lifelines,
Hearing __________ the planning of this task?  Yes  No
guardrails, barricades, hole/floor & wall opening covers,
2. What are the hazards associated with the task? etc.)  Yes  No
Respirator __________ _______________________________________________ Explain: _______________________________________
Hand __________ _______________________________________________ _______________________________________________
Have they been explained to the employees?  Yes  No
Full body harness __________ FIRE PROTECTION:
Foot __________ 3. What weather conditions could affect the 11. Are flammable/combustible materials stored, separated,
safety performance of this task? inspected and secured per procedure?  Yes  No
Uniform __________ __________________________________
Others (specify) ________________ __________ ASSIGNED EMPLOYEES:
TOOLS & EQUIPMENT:
PPE Examples: Approved Safety Helmet with chin Name Badge #
_______________________ ________________
strap, Safety Glasses (dark/clear), face shield visor, 4. User inspection is required of all tools, ladders, electrical
_______________________ ________________
disposable coverall, welding (goggles, shield, sleeves), cords, rigging and safety equipment
_______________________ ________________
ear plugs & muffs, hand gloves (leather, nitrile or latex Has this been completed?  Yes  No
______________________ ________________
coated, chemical gloves, gauntlets,), Safety shoes, boots MATERIAL STORAGE: _______________________ ________________
(rubber),gumboots, high visibility vest, full body _______________________ ________________
harness (with double/single lanyards) fall protection 5. Has a material storage area been identified and approved? _______________________ ________________
equipment, respirator mask, uniforms, etc.  Yes  No _______________________ ________________
SUPERVISORS SAFETY PRINCIPLES POST SAFETY TASK REVIEW: NATIONAL CONTRACTING CO.LTD. Doc. Ref. : NCCT&D.S.FRM.063
(TRANSMISSION & DISTRIBUTION DIVISION) Revision: 00
Ver. Date: 15/10/2015
SUPERVISOR: ____________________________________ SAFETY PRE-TASK ASSIGNMENT Effective Date: 01/11/2015

DATE: ___________________________________________
 Plan Every Job
1. Was anyone injured or did an unplanned incident
occur today? If yes, explain.
 Anticipate Unexpected Events Yes _____ No _____
___________________________________________
___________________________________________
 Use Procedures As Tools
2. Was the accident/incident reported to the safety
 Use The Right Tool For The Job department? Yes _____ No _____

3. What problems were encountered with today’s work


 Identify The Hazards assignment?
__________________________________________
_______________________________________
 Eliminate/Substitute Hazards
4. What can be done tomorrow to improve
performance?
 Minimize/Reduce The Hazards __________________________________________
____________________________


Isolate/Separate the Hazards

Administrative/Engineering Control
5. Miscellaneous concerns:
___________________________________________
_____________________________
SAFETY

Measures

Protect the Person


6. Reviewed by:
Supervisor:
Foreman: _______
___ Pre-TASK
 Assess People’s Abilities NAME
ASSIGNED EMPLOYEES:

______________________
______________________
BADGE #
_________________
_________________
ASSIGNMENT
 Monitor & Evaluate Effectively ______________________ _________________
______________________ _________________
______________________ _________________
 Audit These Principles ______________________ _________________
______________________ _________________
______________________ _________________
______________________ _________________
______________________ _________________
RETURN FORM IN TO PROJECT/SITE ______________________ _________________
MANAGEMENT AT END OF SHIFT OR ______________________ _________________
WHEN TASK IS COMPLETED. ____________________ ________________